Application
This unit applies to land managers in land disturbing projects for local government, urban, civil construction, forestry, extractive industry, rural, or natural resource management. |
Elements and Performance Criteria
ELEMENT | PERFORMANCE CRITERIA |
1. Establish suitability of development proposal | 1.1. Data concerning suitability of development site is compiled using industry methodology. 1.2. Alterations or modifications to the development plan are noted and reported to developer or consent authority. 1.3. Compliance is established with relevant regulatory planning authority or environmental legislation following industry procedures. 1.4. Concurrence is established relating to suitability of development proposal and conforms to erosion and sediment control guidelines. |
2. Develop erosion and sediment control strategy | 2.1. Erosion control measures are developed consistent with industry principles and selection criteria. 2.2. Sediment control measures are developed consistent with industry principles and selection criteria. 2.3. Erosion and sediment control strategies are established and documented in co-operation with the developer and relevant consent authority. |
3. Prepare an erosion and sediment control plan | 3.1. Selection criteria for earthwork structures or measures are checked against industry guidelines. 3.2. Design specifications for structures incorporated in plan details. 3.3. Erosion and sediment control plan and documentation supporting the plan follow industry guidelines. |
Required Skills
Required skills |
establish suitability of development proposal prepare reports on erosion and sediment control plans develop erosion and sediment control strategy prepare an erosion and sediment control plan use literacy skills to fulfil job roles as required by the organisation. The level of skill may range from reading and understanding documentation to completion of written reports use oral communication skills/language competence to fulfil the job role as specified by the organisation including questioning, active listening, asking for clarification, negotiating solutions and responding to a range of views use numeracy skills to estimate, calculate and record complex workplace measures use interpersonal skills to work with others and relate to people from a range of cultural, social and religious backgrounds and with a range of physical and mental abilities. |
Required knowledge |
relevant environmental, planning and groundwater legislation planning process for erosion and sediment control erosion control and design principles soils and soil formation levels and levelling earthmoving principles total catchment issues legal requirements - permits environmental issues country code managing peak water flows subsurface and surface drainage principles and systems awareness of the limitations of design aids provided for industry. |
Evidence Required
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. | |
Overview of assessment | |
Critical aspects for assessment and evidence required to demonstrate competency in this unit | The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following: establish suitability of development proposal prepare reports on erosion and sediment control plans check selection criteria for earthwork structures or measures against industry guidelines develop erosion and sediment control strategy prepare an erosion and sediment control plan. |
Context of and specific resources for assessment | Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances. |
Range Statement
The range statement relates to the unit of competency as a whole. | |
Earthworks may include: | the range of conservation earthworks on rural lands including: contour banks waterways dams drainage structures. |
Erosion control measures may include: | site management land shaping batter stabilisation banks and channels level spreader revegetation waterways check dams bank and channel linings grade stabilising structures outlet protection structures stormwater detention measures dust control rural road&track crossbank and crossfall. |
Sediment control measures may include: | sediment basins sediment traps sediment filters excavated sediment traps straw bale stormwater inlet sediment traps sediment fence straw bale geotextile fabric vegetation strips. |
Sectors
Unit sector | Soil and water conservation |
Employability Skills
This unit contains employability skills. |
Licensing Information
Not Applicable