CPCCCA3012A
Frame and fit wet area fixtures

This unit of competency specifies the outcomes required to install supporting framework for fixtures and flashings associated with the wet area construction for a bath, shower base and sink or basin unit, and preparation for wet area linings. It includes bathroom, laundry, shower, toilet and en suite wet areas.

Application

This unit of competency supports achievement of skills to construct framework for wet areas to prepare for installation of plumbed fittings and fixtures, which includes working with others and as a member of a team.


Prerequisites

CPCCOHS2001A Apply OHS requirements, policies and procedures in the construction industry


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1. Plan and prepare.

1.1. Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation purposes.

1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.

1.3. Signage and barricade requirements are identified and implemented.

1.4. Plant, tools and equipment selected to carry out wet area framing and fitting out are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement.

1.5. Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.

1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.

1.7. Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied.

2. Set out wet area installation.

2.1. Noggings and housings are set out for fitments and fixtures in accordance with drawings and specifications.

3. Prepare for bath installation.

3.1. Studs are checked to height and level for required depth to receive lip of bath.

3.2. Support to front edge of bath is constructed to height and level.

3.3. Nogging and short studs are fixed and fitted, where specified, flush to wall face for fixing surround sheeting.

3.4. Sheeting and flashing are fixed to specifications.

4. Prepare for shower base installation.

4.1. Location of shower base is set out.

4.2. Wall plates and studs are checked out to required depth to receive shower base.

4.3. Nogging and short studs are fitted and fixed flush to wall face for fixing surround sheeting.

4.4. Corner flashing is installed to regulations.

4.5. Flashing and sheeting are fitted and fixed to specifications.

5. Prepare for sink installation.

5.1. Noggings are set out to accommodate vanity basin and laundry sink units.

5.2. Flashings are installed in accordance with regulations.

6. Clean up.

6.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.

6.2. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.

Required Skills

Required skills

Required skills for this unit are:

communication skills to:

determine requirements

enable clear and direct communication, using questioning to identify and confirm requirements, share information, listen and understand

follow instructions

read and interpret:

documentation from a variety of sources

plans, specifications and drawings

report faults

use language and concepts appropriate to cultural differences

use and interpret non-verbal communication, such as hand signals

numeracy skills to apply measurements and make calculations

organisational skills, including the ability to plan and set out work

teamwork skills to work with others to action tasks and relate to people from a range of cultural and ethnic backgrounds and with varying physical and mental abilities

technological skills to:

use a range of mobile technology, such as two-way radio and mobile phones

voice and hand signals to access and understand site-specific instructions.

Required knowledge

Required knowledge for this unit is:

capillary action

construction terminology

electrolysis and corrosion of dissimilar metals

framing and fitting wet area fixture techniques

material safety data sheets (MSDS)

materials storage and environmentally friendly waste management

plans, specifications and drawings

plant, tools and equipment types, characteristics, uses and limitation

processes for setting out and measuring

processes for the calculation of material requirements

wall framing

waterproofing and flashing

wet area preparation materials

workplace and equipment safety requirements

job safety analysis (JSA) and safe work method statements.

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to:

locate, interpret and apply relevant information, standards and specifications

comply with site safety plan, OHS regulations and state and territory legislation applicable to workplace operations

comply with organisational policies and procedures, including quality requirements

safely and effectively use tools, plant and equipment

communicate and work effectively and safely with others

as a minimum set out height and level of one bath and one shower; install one bath and one shower to regulations including all required flashings and noggings for lining requirements

install the framing for one sink/basin.

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

an induction procedure and requirement

realistic tasks or simulated tasks covering the mandatory task requirements

relevant specifications and work instructions

tools and equipment appropriate to applying safe work practices

support materials appropriate to activity

workplace instructions relating to safe work practices and addressing hazards and emergencies

material safety data sheets

research resources, including industry related systems information.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Information includes:

diagrams or sketches

instructions issued by authorised organisational or external personnel

manufacturer specifications and instructions where specified

memos

MSDS

organisation work specifications and requirements

plans and specifications

regulatory and legislative requirements pertaining to framing and fitting wet area fixtures

relevant Australian standards

safe work procedures related to framing and fitting wet area fixtures

signage

verbal or written and graphical instructions

work bulletins

work schedules.

Planning and preparation include:

work site inspection

equipment defect identification

assessment of conditions and hazards

determination of work requirements

preparation for shower screen installation and variations of wall lining, where specified.

Safety (OHS) is to be in accordance with state or territory legislation, regulations, codes of practice, organisational safety policies and procedures, and project safety plan and may include:

emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation

handling of materials

hazard control

hazardous materials and substances

safe operating procedures, including the conduct of operational risk assessment and treatments associated with:

earth leakage boxes

lighting

power cables, including overhead service trays, cables and conduits

restricted access barriers

surrounding structures

traffic control

trip hazards

work site visitors and the public

working at heights

working in confined spaces

working in proximity to others

working with dangerous materials

organisational first aid

personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices

use of firefighting equipment

use of tools and equipment

workplace environment and safety.

Tools and equipment include:

chisels

clamps

cutting knives

docking saws/drop saws

hammers

hand saws

marking equipment

measuring tapes and rules

mouses

pincers

power drills

power leads

power planers

power routers

putty knives and paint scrapers

saw stools

screwdrivers

small pinch bars

spirit levels

squares (combination/tri)

straight edges

work benches.

Wet areas include:

bathrooms

en suites

food preparation areas

kitchens

laundries

showers

toilets.

Quality requirements include relevant regulations, including:

Australian standards

internal company quality policy and standards

manufacturer specifications, where specified

workplace operations and procedures.

Materials include:

clouts

flashing material

glues

nails

screws

timber

waterproofing agents.

Environmental requirements include:

clean-up protection

noise and dust

vibration

waste management.

Statutory and regulatory authorities include:

federal, state and local authorities administering applicable Acts, regulations and codes of practice.

Fitments include:

grab rails

kitchen sink units

laundry trough units

shaving cabinets

sink units

toilets

towel rails

vanities.

Fixtures include:

baths checked into wall

free standing baths

shower bases (poly marble, pressed metal or concrete).


Sectors

Unit sector

Construction


Co-Requisites

Nil


Employability Skills

This unit contains employability skills.


Licensing Information

Not Applicable