CPCCDE3025A
Operate remote-controlled plant on demolition sites

This unit of competency specifies the outcomes required to operate remote-controlled plant to conduct high risk demolition operations, such as overhead cutting, sawing and jack hammering; and work in restricted spaces, such as tunnels. Remote-controlled plant may be operated at ground level, below ground or on suspended floors.

Application

This unit of competency supports the role of demolition workers who demolish residential, commercial and industrial buildings and structures.


Prerequisites

Nil


Elements and Performance Criteria

1

Plan and prepare.

1.1

Compliance requirements relevant to remote-controlled plant demolition operations are accessed, interpreted and applied.

1.2

Work instructions are obtained from relevant information, confirmed with team members and other relevant personnel, and applied to planning and preparation.

1.3

Instructions and advice from structural engineer regarding demolition techniques on suspended floors and load bearing capacities are followed.

1.4

Work health and safety (WHS) requirements are identified and applied to task planning according to safety plans and policies.

1.5

Environmental requirements are identified for the project according to environmental plans and regulatory obligations.

1.6

Maintenance tools and equipment are checked for serviceability, and faults are reported or rectified.

1.7

Remote-controlled plant pre-start, start-up, park and shut-down operational checks are conducted according to manufacturer recommendations.

1.8

Remote-controlled plant controls and functions, including brakes and manoeuvrability, are checked for serviceability, and faults are rectified and reported.

2

Select, check and fit attachments.

2.1

Remote-controlled plant attachments are selected to carry out tasks, consistent with job requirements and according to manufacturer specifications.

2.2

Attachments’ arms and connections are checked for excessive wear, and replaced and reported as required.

2.3

Attachments are securely fitted according to safe work method, and safety pins or clips are fitted according to manufacturer specifications and workplace requirements.

2.4

Hydraulic components are checked and faults are rectified or components replaced, and reported.

2.5

Operation of hydraulic system is tested before applying load according to manufacturer specifications and workplace requirements.

2.6

Attachment operation is tested by raising and lowering attachment and attachment is locked in raised position for travel according to manufacturer specifications and workplace requirements.

2.7

Attachments are removed, cleaned and stored according to manufacturer specifications and workplace requirements.

3

Prepare demolition site.

3.1

Requirements of site demolition plan are determined and discussed with team members according to workplace procedures.

3.2

Site inspection of property or dilapidation survey is conducted to determine condition of work site and surrounds before work begins, and safe work method statement is amended and approved as required.

3.3

Confirmation is obtained from supervisor and regulatory authorities that all existing services have been disconnected.

3.4

Hazardous material is identified for separate handling according to workplace requirements and instructions.

3.5

Mechanical equipment and plant are positioned in operating locations and appropriate exclusion zone and traffic control are arranged.

4

Operate remote-controlled plant loader for demolition process.

4.1

Remote-controlled plant operating techniques are identified and applied to achieve optimum output according to manufacturer’s design specifications while achieving specified tolerances.

4.2

Site hazards associated with remote-controlled plant demolition operations are identified and safe operating techniques are followed to minimise risks.

4.3

Remote-controlled plant is moved safely between work locations, observing relevant codes and traffic management requirements.

4.4

Control measures are implemented to manage hazards arising from demolition process according to the demolition plan, safe work methods and regulatory requirements.

4.5

Demolition tasks are assessed immediately prior to starting and safe work method statement is reviewed to incorporate management of unpredicted hazards.

4.6

Remote-controlled plant is operated at a safe distance to demolish building elements using suitable attachments according to approved demolition plan and current safe work method.

4.7

Communication is maintained with team members, during the demolition process.

4.8

Work site conditions and progress are monitored in consultation with team members, and work is stopped or techniques adjusted as required, according to workplace requirements.

5

Carry out machine operator inspection and maintenance tasks.

5.1

Remote-controlled plant is safely parked and shut down.

5.2

Remote-controlled plant is inspected for faults and defective parts are removed and replaced according to manufacturer specifications and workplace requirements.

5.3

Regular programmed operator maintenance tasks are conducted according to manufacturer specifications and workplace requirements.

6

Clean up.

6.1

Work area is cleared and materials and waste are sorted and located for removal, as required, according to site demolition project environmental management plan.

6.2

Maintenance tools and equipment are cleaned, checked, maintained and stored.

Required Skills

Required skills

learning skills to:

recognise signs indicating undiscovered hazards on a demolition site, for example presence of termites

respond to change, such as differences in current work site environmental and sustainability requirements

numeracy skills to:

estimate weight of accumulated volumes of demolition debris on suspended floors

calculate combined weight of remote-controlled plant and demolition debris on suspended floors

check levels of lubricants in equipment

perform measurements and calculations associated with work, such as when determining specified length of wall to be removed

oral communication skills to:

enable clear and direct communication, using questioning to identify and confirm requirements, and share information

report hazards on the work site, including faults in tools, equipment and materials

use language and concepts appropriate to cultural differences

reading skills to:

interpret documentation relating to work requirements, including:

drawings and specifications

job safety analyses (JSA)

safe work method statements (SWMS)

safety data sheets (SDS)

understand written instructions, procedures and signage

writing skills to complete pre-operational checklists and equipment fault forms

Required knowledge

basic principles of structural engineering regarding loads on suspended floors

general construction terminology

hazards associated with the operation of remote-controlled plant on residential, commercial and industrial demolition sites

methods for materials storage and disposal, including environmentally friendly waste management

method of operation and maintenance requirements of remote-controlled plant and attachments

types, characteristics, uses and limitations of remote-controlled plant in the demolition industry

workplace and equipment safety requirements

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed by observation of on-site operation of remote-controlled plant and the use of different attachments to complete demolition tasks on large buildings working as part of a team.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person should demonstrate the ability to complete the following mandatory demolition tasks:

fit and secure grapples, buckets and hydraulic hammers and remove, maintain and store attachments after use

position plant appropriately and load a truck with building rubble using a bucket

progressively, and with reference to the pre-planned and controlled sequencing of tasks outlined in the demolition plan, logically demolish all or part of three different types of buildings or structures, including breaking up a concrete floor or structure using a hydraulic hammer attachment

segregating building materials effectively for recycling or disposal

a person should also demonstrate:

knowledge of the requirements, procedures and instructions for conducting demolition remote-controlled plant operations

implementation of requirements, procedures and techniques for the safe, effective and efficient completion of demolition remote-controlled plant operations, including:

working with others to undertake and complete demolition remote-controlled plant operations that meet all of the required outcomes

consistent timely completion of demolition remote-controlled plant operations that safely, effectively and efficiently meet the required outcomes.

Context of and specific resources for assessment

Assessment of this unit:

must be in the context of the work environment

must meet relevant compliance requirements.

Resource implications for assessment include:

an induction procedure

realistic tasks covering the mandatory task requirements

relevant specifications and work instructions

plant, tools and equipment as listed appropriate to applying safe work practices

support materials appropriate to activity

workplace instructions relating to safe work practices and addressing hazards and emergencies

information relevant to each task, such as safety data sheets, work plans and approved specifications, forms and procedures manuals.

Method of assessment

Assessment for this unit must verify the practical application of the required skills and knowledge, using a combination of the following methods:

direct observation of mandated tasks

questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

review of relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.

Guidance information for assessment

This unit could be assessed on its own or in combination with other units relevant to the job function.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Compliance requirements may include:

Australian standards relevant to plant operation

codes of practice for plant operation

legislative and regulatory requirements for plant operation

manufacturer guidelines and specifications

organisational requirements and procedures

requirements of Employment and Workplace Relations legislation

requirements of Equal Employment Opportunity and Disability Discrimination legislation

site requirements.

Information regarding work task instructions may include:

advice and guidelines relating to regulatory and legislative requirements for mechanical demolition processes

advice and instructions from structural engineer regarding loads on suspended floors

approved demolition plan

current Australian standards relating to operating remote-controlled plant on demolition sites

diagrams or sketches

instructions issued by authorised organisational or external personnel

memos

safe work procedures relating to the conduct of mechanical demolition processes

safety data sheets

site signage

site traffic management plan

verbal, written and graphical instructions, including manufacturer specifications and instructions where specified

work bulletins

work schedules, plans and specifications.

Work health and safety requirements must comply with state or territory legislation and project safety plan may include:

emergency procedures, including extinguishing fires, organisational first aid requirements, and evacuation procedures

handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor

hazard control

hazardous materials and substances and the safe handling or quarantining procedures for each type, including:

animal residue

asbestos

dust

lead-based paints

pesticide residue

personal protective equipment (PPE) prescribed under legislation, regulations and workplace policies and practices

safe operating procedures, including operational risk assessment and treatments associated with:

falling objects

lighting

load bearing capacities of suspended floors

plant movement

power cables, including overhead service trays, cables and conduits

restricted access barriers

surrounding structures

traffic control

trip hazards

work site visitors and the public

working at heights

working in confined spaces

working in proximity to others

traffic management, barriers and signage

use of tools and equipment

workplace environmental requirements.

Environmental requirements may include:

clean-up management

dust and noise control

sedimentation control

vibration management

waste management.

Attachments may include:

backhoe

buckets

buckets, including 4:1 buckets

chain digger

clamshell buckets

concrete crushers

concrete cutter or saw

crushing jaws

dozer blade

drilling equipment

forklift

front end loader (FEL)

grabs

grapples

hammer

metal shears

planers

power broom

profiler

pulverisers

rippers

rock breakers

rotary hoe

saws

scabblers

scarifier

shears

side angling device

tiller/mixer

vibrating plates.

Checks must include for:

bulges

factures

leaks

splits.

Site inspection may include:

assessing condition of property and surrounds

communicating with those who may be affected by the demolition task

determining floor loadings

erecting scaffolding

identifying hazardous materials

identifying position of hoses and cables clear of hazards

installing supports and bracing

location of signage and barricades

providing for site safety.

Safe operating techniques for remote-controlled plant loaders may include:

emergency shut-down and stopping

management of hazards and risks, including:

bridges

buildings

cuttings

embankments

excavations

fires

hazardous materials

overhead and underground services

structures

traffic

trees

uneven or unstable terrain

safe parking practices ensuring:

access ways are clear

equipment or machinery is:

located a safe distance from excavations

located away from overhangs and refuelling sites

secured from unauthorised access or movement.

Hazards arising from demolition process may include:

dust

fire

noise

vibration.

Demolition tasks that may be completed using remote-controlled plant and attachments include:

controlled collapse of structures by:

pulling using cables

pushing

demolition of:

buildings

chemical or manufacturing plants

chimneys

tanks

towers

excavation of:

basements

footings

slabs

loading materials

processing and sorting materials.

Communication may include the use of:

hand signals

mobile equipment

radios.

Operator maintenance tasks:

must include:

cleaning

authorised servicing

monitoring, recording and reporting faults

may include:

authorised minor replacements

assisting maintenance personnel during maintenance and repair activities.


Sectors

Demolition


Employability Skills

This unit contains employability skills.


Licensing Information

Licensing, legislative, regulatory or certification requirements apply to demolition work in different States and Territories. Candidates are advised to consult with the relevant regulatory authorities.