CPCCSH3002A
Set out and fabricate shopfront commercial entries bulkheads and component fittings

This unit specifies the outcomes required to set out and fabricate component parts and fittings, including bulkheads where required, that form a total shopfront structure.

Application

This unit of competency supports the achievement of skills and knowledge to fabricate commercial entries for street fronts, shopping centres, commercial and industrial buildings and both internal and external applications, which may include working with others and as a member of a team.


Prerequisites

CPCCOHS2001A

Apply OHS requirements, policies and procedures in the construction industry


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1. Plan and prepare.

1.1. Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.

1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.

1.3. Signage and barricade requirements are identified and implemented.

1.4. Tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability and any faults are rectified or reported prior to commencement.

1.5. Personal protective equipment selected, correctly fitted and used.

1.6. Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.

1.7. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.

1.8. Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority requirements, and are applied.

2. Undertake site measurements.

2.1. Datums and gridlines or reference points are located and confirmed using levelling techniques.

2.2. Surrounding structures and surfaces are checked for plumb, level, line and square.

2.3. Measurements are taken of internal width and height, if applicable, and are recorded.

2.4. Inconsistencies in dimensions, layout or location of structure outside the specified tolerances are noted and reported to appropriate personnel.

2.5. Position of proposed frames and fittings are marked out on surrounding surfaces using non-permanent markers.

3. Assemble components of framework.

3.1. Appropriate area is selected and material components are laid out for assembly.

3.2. Framework is assembled, with overall dimension checked for conformity to location and design and using appropriate fixings and fasteners.

3.3. Frame is checked for square and adjusted where required.

3.4. Areas are laminated where required and finishes applied where applicable.

4. Pre-fit component fittings.

4.1. Component fittings are pre-fitted where applicable.

4.2. Fittings are fixed to locations according to specifications.

5. Prepare for packaging.

5.1. Fittings too large for safe transport are disassembled.

5.2. Packaging of separate components is identified and arranged.

6. Clean up.

6.1. Components and assembly diagram are numbered for inclusion in delivery instructions.

6.2. Waste and unwanted material are disposed of safely.

6.3. Unused materials are stored/stacked.

6.4. Tools and equipment are cleaned, maintained and stored.

Required Skills

Required skills

Required skills for this unit are:

ability to recognise procedures, respond to change and contribute to workplace responsibilities, such as current work site environmental or sustainability frameworks or management systems

communication skills to:

enable clear and direct communication, using questioning to identify and confirm requirements, share information, listen and understand

follow instructions

read and interpret drawings and specifications

use and interpret non-verbal communication

use language and concepts appropriate to cultural differences

innovation skills to select appropriate tools and equipment, respond to workplace challenges and put ideas into action

numeracy skills to apply measurements and calculations

planning and organisational skills to identify requirements, apply relevant resources and sequence tasks

problem solving skills to recognise and take action to rectify minor faults and problems

teamwork skills to be able to work with others to action tasks and relate to people from a range of cultural, social, ethnic backgrounds and with varying physical and mental abilities.

Required knowledge

Required knowledge for this unit is:

aluminium construction materials and methods

AS1873 Powder actuated (PA) hand-held fastening tools

AS2047.2 Windows in buildings - Construction, installation and maintenance

commonly used shopfitting materials and their characteristics

job safety analysis (JSA) and safe work method statements

measuring and levelling processes related to setting out and checking lineal measurements and levels of surfaces

measuring and squaring processes relevant to lineal measurements for framework

organisation's quality assurance requirements

shopfront design processes

timber construction methods

workplace and equipment safety requirements.

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to prepare all components for manufacture of a shopfront, providing evidence of the ability to:

demonstrate operational safety compliance with OHS regulations applicable to workplace operations

apply organisational quality procedures and processes within context of assembling and installing a shopfront

identify design, delivered assemblies, components, fittings and assembly diagram

identify and select components and fittings to locations in assembled shopfront

select and use appropriate processes, tools and equipment to assemble and install nominated unit

demonstrate appropriate and effective applications to prepare opening to receive framework

safely and efficiently assemble sections, components and fittings

safely and efficiently install bulkhead into position

safely and efficiently locate and install assembly into place

safely and efficiently install components and fittings and, where applicable, check for designed operation

identify typical faults and problems that occur and action required to rectify them

communicate with others to ensure safe and effective workplace operations.

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

workshop location with appropriate area

tools and equipment appropriate to required tasks

materials and prepared components for assembly processes

drawings, specifications and other documentation relevant to activity.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm a reasonable inference that competency is not only verified under the particular assessment circumstance, but is able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Information includes:

diagrams or sketches

instructions issued by authorised organisational or external personnel

manufacturer specifications and instructions, where specified

material safety data sheets (MSDS)

memos

regulatory and legislative requirements pertaining to setting out and fabricating shopfront commercial entries bulkheads and component fittings

relevant Australian standards

safe work procedures relating to setting out and fabricating shopfront commercial entries bulkheads and component fittings

signage

verbal, written and graphical instructions

work bulletins

work schedules, plans and specifications.

Planning and preparation include:

assessment of conditions and hazards

determination of work requirements and safety plans and policies

equipment defect identification

work site inspection.

Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:

emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation

hazard control

hazardous materials and substances

organisational first aid

PPE prescribed under legislation, regulations and workplace policies and practices

safe operating procedures, including the conduct of operational risk assessment and treatments associated with:

concealed services (water, power and gas)

lighting

restricted access barriers

traffic control

work site visitors and the public

working at heights

working in confined spaces

working in proximity to others

use of firefighting equipment

use of tools and equipment

workplace environmental requirements and safety.

Tools and equipment include:

air compressor and hoses

bolsters

brushes

chalk lines

chisels, including cold chisels

clamps

explosive power tools

grinders

hammers

hand saws

measuring tapes and rules

operation of explosive power tools in accordance with AS1873 Powder actuated (PA) hand-held fastening tools

plumb bob

power drills, including masonry

power leads

power planers

power saws

sash cramps

saw stools

scaffolding

screwdrivers

set spanners

squares

step ladders.

Quality requirements include:

assembling procedures

attention to specifications of work

control of handling procedures

protection of material surfaces

quality of materials

relevant regulations, including:

Australian standards

internal company quality policy and standards

manufacturer specifications where specified

workplace operations and procedures

use and maintenance of equipment

workplace operations and procedures.

Materials include:

aluminium

timber.

Environmental requirements include:

clean-up management

dust and noise

stormwater protection

waste management.

Statutory and regulatory authority includes:

federal, state and local authorities administering applicable Acts, regulations and codes of practice.

Levelling techniques include using:

automatic level

spirit level

spirit level and straight edge

staff.

Fixings and fasteners include:

bolts and nuts

coach screws

masonry anchors

metal brackets

self-tapping screws

wall plugs.


Sectors

Unit sector

Construction


Employability Skills

This unit contains employability skills.


Licensing Information

Not Applicable