CPCPGS3046A
Install LPG systems in caravans, mobile homes and mobile workplaces

This unit of competency specifies the outcomes required to determine the requirements for installing and commissioning liquefied petroleum gas (LPG) systems with an operating pressure not exceeding 2.75kPa in caravans, mobile homes and mobile workplaces.

Application

Site location for work application may be a purpose-built workshop or customer’s premises.



Elements and Performance Criteria

1

Identify LPG system requirements.

1.1

Plans, specifications and any special instructions are obtained.

1.2

Work health and safety (WHS) and environmental requirements associated with installing and commissioning LPG systems in caravans, mobile homes and mobile workplaces are adhered to throughout the work.

1.3

Quality assurance requirements for company operations are identified and adhered to.

1.4

Gas load and design requirements are determined from plans, specifications, and job drawing or workplace instructions.

1.5

System capacity is calculated to ensure adequacy for the required load and compliance with relevant Australian standards and installation requirements.

1.6

Appropriate regulator and piping are identified in terms of size, connection sizes and capacity, according to relevant Australian standards and installation requirements.

1.7

Location of cylinders, appliances and piping set out is identified according to job requirements and in compliance with relevant Australian standards and installation requirements.

1.8

Quantity of piping, components and fittings is estimated in compliance with relevant Australian standards and installation requirements.

2

Prepare for installation.

2.1

Materials, equipment, appliances and cylinders are ordered and checked for compliance with docket and order form, and for acceptable condition.

2.2

Appropriate tools and equipment for installing and commissioning LPG systems in caravans, mobile homes and mobile workplaces, including personal protective equipment, are identified and selected.

2.3

Work is planned in conjunction with others involved in or affected by the work.

2.4

Work area and materials are prepared to support efficient installation of the system.

2.5

Sustainability principles and concepts are observed when preparing for and undertaking work process.

3

Install LPG system, including flue and ventilation.

3.1

Cylinders, regulators, associated pipework, appliances and fixings are installed in compliance with manufacturer requirements, relevant Australian standards and installation requirements.

3.2

Ventilation requirements are determined and installed according to relevant Australian standards.

4

Test and commission LPG system.

4.1

Appropriate test equipment is selected.

4.2

System is tested according to relevant Australian standards and manufacturer requirements.

4.3

System is commissioned according to relevant Australian standards and manufacturer requirements.

4.4

Test data is recorded in format required by regulatory and installation requirements.

4.5

Compliance plates and signage are located and fitted according to statutory and regulatory authorities’ requirements, relevant Australian standards and installation requirements.

5

Clean up.

5.1

Work area is cleared and materials disposed of, reused or recycled according to legislation, regulations, codes of practice and job specification.

5.2

Tools and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and workplace procedures.

5.3

Information is accessed and documentation completed according to statutory requirements.

Required Skills

Required skills

communication skills to:

access information

determine requirements

enable clear and direct communication, using questioning to identify and confirm requirements, share information, listen and understand

follow instructions

inform relevant authorities and supervisors of completion of job

use language and concepts appropriate to cultural differences

use and interpret non-verbal communication, such as hand signals

initiative and enterprise skills to identify and report to appropriate personnel any faults in tools, equipment or materials

literacy skills to:

complete workplace documentation

read and interpret:

documentation from a variety of sources

plans and specifications

record data in writing

numeracy skills to apply measurements and calculations

planning and organising skills to:

plan and set out work

plan work with others

teamwork skills to work with others to action tasks and relate to people from a range of cultural and ethnic backgrounds and with varying physical and mental abilities

technical skills to determine requirements, and install and commission LPG systems

technology skills to:

access and understand site-specific instructions in a variety of media

use mobile communication technology

Required knowledge

electrical safety and requisite precautions

how to access relevant information, including codes and technical standards

job safety analysis (JSA) and safe work method statements (SWMS)

process for determining material requirements

procedures for installing and commissioning gas systems in caravans, mobile homes and mobile workplaces

properties of gas, gas safety, combustion principles, gas pressures, and cylinder installation and ventilation requirements

relevant statutory requirements related to installing LPG systems

SI system of measurements

workplace and equipment safety requirements

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of:

locating, interpreting and applying relevant information, standards and specifications to determine requirements, and install and commission LPG systems in caravans, mobile homes and mobile workplaces

applying safety requirements throughout the work sequence, including electrical safety requirements and the use of personal protective clothing and equipment

given the plans and specifications for a project, determining the requirements for, installing, testing and commissioning LPG systems in either a caravan, mobile home or mobile workplace by determining the gas load, storage capacity and ventilation requirements for two gas appliances, ensuring:

application of sustainability principles and concepts throughout the installation process

correct identification of location, design and details of proposed installation

correct selection and use of appropriate processes, tools and equipment

completing all work to specification

compliance with regulations, standards and organisational quality procedures and processes

communicating and working effectively and safely with others.

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian standards’ requirements.

Resource implications for assessment include:

an induction procedure and requirement

realistic tasks or simulated tasks covering the minimum task requirements

relevant specifications and work instructions

tools and equipment appropriate to applying safe work practices

support materials appropriate to activity

workplace instructions relating to safe work practices and addressing hazards and emergencies

material safety data sheets

research resources, including industry-related systems information.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Integrated Framework Training Package

include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person’s demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Work health and safety is to be according to commonwealth, state and territory legislation and regulations and may include:

handling of materials

hazard control

personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices

safe operating procedures, including recognising and preventing hazards associated with:

confined spaces

electricity

hazardous materials and substances

service lines

surrounding structures and facilities

trip hazards

use of tools and equipment

work site visitors and the public

working at heights

working in proximity to others

use of firefighting equipment

use of first aid equipment

workplace environment and safety.

Environmental requirements may include:

clean-up protection

waste management.

Quality assurance requirements may include:

Australian standards

environment policy

Environment Protection Authority (EPA)

internal company quality assurance policy and risk management strategy

International Standards Organisation

site safety plan

workplace operations and procedures.

Materials:

may include:

copper tubing

fittings

fixing materials

flue systems

gas cylinders

gas-operated appliances

gas hose assemblies

gas regulators

other approved materials

are to comply with job specifications and appropriate standards for gas installations.

Tools and equipment may include:

files

flaring tools

hacksaws

hand trolleys

hoists and jacks

lifting and load shifting equipment

measuring equipment

power cutting tools

pressure testing equipment

silver brazing equipment

spanners

wrenches.

LPG system may include:

approved appliances

cylinders

flue systems

piping

regulators.

Sustainability principles and concepts:

cover the social, economic and environmental use of resources to meet current and future needs

may include:

selecting appropriate materials

efficient use and recycling of material

using energy efficient appliances

disposing of waste material appropriately.

Statutory and regulatory authorities may include:

commonwealth, state or territory, and local authorities administering applicable Acts, regulations and codes of practice.

Information may include:

charts and hand drawings

plans and sketches

instructions issued by authorised organisational or external personnel

job drawings

manufacturer specifications and instructions

material safety data sheets (MSDS)

memos

organisation work specifications and requirements

recognised formulas or tables accepted by the regulatory authority

regulatory and legislative requirements, particularly those pertaining to:

WHS and environmental requirements

plumbing and/or gasfitting authority regulations

relevant Australian standards

safe work procedures relating to determining requirements, and installing and commissioning LPG systems in caravans, mobile homes and mobile workplaces

signage

verbal, written and graphical instructions

work bulletins

work schedules, plans and specifications.


Sectors

Gas services

Unit sector

Plumbing and services


Employability Skills

This unit contains employability skills.


Licensing Information

In some jurisdictions, this unit of competency may form part of accreditation, licensing, legislative, regulatory or certification requirements.