Application
This unit supports the attainment of skills and knowledge required for competent workplace performance in councils of all sizes. Knowledge of the legislation and regulations within which councils must operate is essential. The unique nature of councils, as a tier of government directed by elected members and reflecting the needs of local communities, must be appropriately reflected. |
Prerequisites
Prerequisite Unit/s |
Elements and Performance Criteria
ELEMENT | PERFORMANCE CRITERIA |
1. Divert or drain water from the work site | 1.1. Appropriate drainage is provided to allow for the diversion of uncontaminated stormwater from the work site and to prevent damage to the environment. 1.2. Environmental protection devices are installed as required to meet environmental regulations. |
2. Set up for road maintenance | 2.1. Maintenance areas are set out according to instructions or maintenance plan. 2.2. Maintenance areas are secured to prevent injury to the public and workers and damage to property and traffic control and warning signs are put in place in accordance with regulations. 2.3. Maintenance resources and materials are selected according to instructions or maintenance plan. |
3. Maintain roads | 3.1. Defective areas or potholes are excavated and replaced with selected materials and compacted in layers to specifications. 3.2. Defective areas are shaped and prepared for road finish in accordance with specifications. 3.3. Surfacing materials are applied using selected equipment and tools in accordance with specifications. 3.4. Pavement lines are spotted and replaced in accordance with specifications. 3.5. Defective kerb, channel and gully boxes are removed, disposed of appropriately and replaced in accordance with the specifications and relevant standards , using selected tools and equipment. 3.6. Subsoil drains are cleaned out and debris is removed and disposed of appropriately. 3.7. Side drains are cleaned out and debris is removed and disposed of appropriately. 3.8. Warning signs are removed when all risks have ceased. |
4. Maintain signage and furniture/appurtenances | 4.1. Defective signage is replaced to ensure it meets specifications and relevant standards. 4.2. Defective guard and handrails are replaced to ensure they meet specifications and relevant standards. 4.3. Defective light poles are replaced and connected according to specifications. 4.4. Defective road fencing and noise attenuation are replaced to meet specifications. 4.5. Defective furniture /appurtenances are replaced to meet specifications. 4.6. Signage and furniture/appurtenances are cleaned and restored using appropriate materials to meet specifications and relevant standards. 4.7. Defective pavement lines are restored in accordance with specifications and relevant standards. |
5. Maintain verges and medians | 5.1. Verges and medians are maintained to the relevant standards. 5.2. Verges and median drains are cleaned out and debris is removed. |
6. Rehabilitate works area | 6.1. Maintenance area is restored to required condition. 6.2. Private and public property areas and structures are restored in accordance with instructions. |
7. Maintain records | 7.1. Information is recorded in accordance with council and legislative requirements. 7.2. Details are recorded clearly, accurately and legibly. 7.3. Records are secured, made accessible and kept up to date. |
Hidden text |
Required Skills
This describes the essential skills and knowledge and their level, required for this unit |
Required Skills |
reading and interpreting plans and specifications, and plant and equipment capabilities measurement calculating quantities state and local environmental requirements. |
Required Knowledge |
occupational health and safety requirements work site traffic management materials technology related to road maintenance appropriate drainage options work scheduling, testing and inspection working in a team. |
Hidden text |
Evidence Required
Overview of assessment requirements | A person who demonstrates competency in this unit will be able to perform the outcomes described in the Elements to the required performance level detailed in the Performance Criteria. The knowledge and skill requirements described in the Range Statement must also be demonstrated. For example, knowledge of the legislative framework and safe work practices that underpin the performance of the unit must be demonstrated. |
Critical aspects of evidence to be considered | Appropriate materials are selected for the maintenance of the works. Maintenance resources and maintenance processes are selected. Plans, specifications and instructions are adhered to. Safety on work sites is ensured. Australian standards are met. |
Context of assessment | May be assessed: on the job simulated workplace environment written assignment short-answer test oral questioning observation or any combination of the above. |
Relationship to other units (prerequisite or co-requisite units) | To enable holistic assessment this unit may be assessed with other units that form part of the job role. |
Method of assessment | The following assessment methods are suggested: observation of the learner performing a range of workplace tasks over sufficient time to demonstrate handling of a range of contingencies written and/or oral questioning to assess knowledge and understanding completion of workplace documentation third-party reports from experienced practitioners completion of self-paced learning materials including personal reflection and feedback from trainer, coach or supervisor. |
Evidence required for demonstration of consistent performance | Evidence will need to be gathered over time across a range of variables. |
Resource implications | In accordance with a range of variable requirements. |
Range Statement
The Range Statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below. | |
Surface type may include: | sealed unsealed gravel bitumen concrete segmental pavers asphalt pre-mix. |
Site preparation may include: | clearing grading levelling excavating trenching. |
Stabilisation may include: | synthetics soil and clay geomixes concrete criblock gabions reinforced earth stone pitching stone blocking sand bagging geotextile fabrics spray seeding. |
Pavement may include: | crushed rock soil aggregate grader-placed paver-placed compacted by static roller, vibratory roller, pneumatic roller or concrete train. |
Drainage may include: | table drain mitre kerb and channelling run-offs culverts sump baskets end walls gabions subsoil drains leaching weirs leachate control. |
Furniture may include: | bins bus shelters guide posts bollards benches seats fences guardrails historical lamp posts tables rest areas utility poles handrails noise suppressors. |
Signage may include: | statutory directional information road lines road markings reflectors centre lines directional lines shoulder lines. |
Relevant standards may include: | AS1742.3 and other relevant standards. |