LMFFL2102A
Prepare, select and apply smoothing and patching compounds

This unit covers the competency to prepare, select and apply cementitious products using smoothing and skim coating techniques to concrete and timber sub-floors in readiness for the installation of floor coverings and coatings for internal and external applications.

Application

This unit supports the attainment of skills and knowledge required for competent workplace performance in the wide variety of flooring technology operations. The competency applies to an on site environment and involves application of skills and knowledge at a sub-trade worker level. These skills and knowledge are to be used within the scope of the individual's job and authority.


Prerequisites

Nil


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1. Prepare for work

1.1. Applicable legislative, OHS and organisational requirements relevant to selecting and applying smoothing and patching compounds for sub-floor preparation are verified and complied with

1.2. Instructions and/or plans are read and interpreted to identify the process required to complete work tasks

1.3. Floors are inspected to ensure that they are dry, smooth, plane, sound and clean in accordance with ASNZS 2455.1 (1995) and AS 1884 (1995) and the extent of preparation is confirmed

1.4. Trial applications of surface materials are made to determine the suitability of the primer to the sub-floor, and the appropriateness of the smoothing compound to smoothing requirements and compatibility to the primer and sub-floor application

1.5. Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.6. Material safety data sheets, or equivalent, are read and applied during the work

1.7. Materials and equipment are prepared and positioned for use

1.8. Surfaces are cleaned in accordance with manufacturers recommendations

2. Apply levelling compounds and primers

2.1. Surface coating is applied with the depth and coverage in accordance with manufacturer specifications and job requirements

2.2. Levelled floor is checked and cleared for further processing

3. Apply levelling compounds and primers to timber sub-floors

3.1. Surfaces are checked for contamination, moisture content and suitable preparation

3.2. Material safety data sheets, or equivalent, are read and applied during the work

3.3. A mixing station is established where materials and equipment are prepared and positioned for use

3.4. Trial applications of surface materials are made to check equipment operation, materials consistency and specified surface finish

3.5. Levelled floor is checked and cleared for further processing

4. Complete housekeeping

4.1. Unused materials are stored or recycled as required

4.2. Tools and equipment are cleaned and stored appropriately

4.3. Work area is cleaned and rubbish disposed of appropriate

4.4. Workplace documentation and/or reporting is completed

Required Skills

Required skills

collect, organise and understand information related to work orders, basic plans and safety procedures

communicate ideas and information to enable confirmation of work requirements and specifications, co-ordination of work with site supervisor, other workers and customers, and the reporting of work outcomes and problems

work with others and in a team by recognising dependencies and using co-operative approaches to optimise work flow and productivity

use pre-checking and inspection techniques to anticipate concrete sub-floor preparation problems to avoid re-work and wastage

recognise and respond to circumstances outside instructions or personal competence

plan and organise activities including the preparation and layout of the worksite and the obtaining of equipment and materials to avoid any back tracking, work flow interruptions or wastage

use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate other material requirements

clarify and confirm work instructions

plan work within given task parameters

accept responsibility for given tasks

set, monitor and satisfy personal work goals

satisfy the competency requirements for the job

maintain current knowledge of:

tools and materials

sub-floor patching and smoothing techniques

seek learning opportunities

use the limited workplace technology related to the preparation of a concrete and timber sub-floor including tools, equipment, calculators and measuring devices

Required knowledge

State or Territory OHS legislation, regulations, standards and codes of practice relevant to floor patching and smoothing techniques

organisation and site standards, requirements, policies and procedures for applying smoothing and patching compounds

environmental protection requirements

established communication channels and protocols

problem identification and resolution

types of tools and equipment and procedures for their safe use, operation and maintenance

characteristics of materials, products and defects

set up and operation of equipment

procedures for the recording, reporting and maintenance of workplace records and information

appropriate mathematical procedures for estimation and measurement

characteristics and requirements of concrete and timber sub-floor preparation

type, characteristics, uses and limitations of smoothing compounds and primers

workplace safety system requirements related to the application of smoothing compounds and primers

Evidence Required

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Interpret work order and locate relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Follow work instructions, operating procedures and inspection practices to:

prevent damage to goods, equipment and products

maintain required production output and product quality

minimise the risk of injury to self and others

To complete to Australian Standards a minimum of two sub-floor preparations which are to include:

a patch and repair

a level pour

Work effectively with others

Modify activities to cater for variations in workplace context and environment

Context of, and specific resources for assessment

The application of competency is to be assessed in the workplace or realistically simulated workplace

Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints

Assessment of essential underpinning knowledge, other than confirmatory questions, will usually be conducted in an off-site context

Assessment is to comply with relevant regulatory or Australian Standards requirements

The following resources should be made available:

workplace location or simulated workplace

materials and equipment relevant to sub-floor smoothing and patching activities

specifications and work instructions

Method of assessment

Assessment must satisfy the endorsed assessment guidelines of the Furnishing Industry Training Package

Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge

Assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure its correct interpretation and application

Assessment may be applied under project related conditions (real or simulated) and require evidence of process

Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances

Assessment may be in conjunction with assessment of other units of competency


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Legislative requirements

are to be in accordance with applicable legislation from all levels of government that affect organisational operation. Requirements may include but not be limited to award and enterprise agreements, industrial relations, Australian Standards, confidentiality and privacy, OHS, the environment, equal opportunity, anti-discrimination, relevant industry codes of practice, duty of care and heritage

OHS requirements

are to be in accordance with Commonwealth, State or Territory legislation and regulations, organisational safety policies and procedures. Requirements may include but not be limited to the use of personal protective equipment and clothing, fire fighting equipment, First Aid equipment, hazard and risk control and elimination of hazardous materials and substances, manual handling including lifting and carrying

Organisational requirements

may include but not be limited to legal, organisational and site guidelines, policies and procedures relating to own role and responsibility, quality assurance, procedural manuals, quality and continuous improvement processes and standards, OHS, emergency and evacuation, ethical standards, recording and reporting, access and equity principles and practices, equipment use, maintenance and storage, environmental management (waste disposal, recycling and re-use guidelines)

Instructions

Workplace procedures relating to the use and operation of tools and equipment

Workplace instructions, including job sheets, plans, drawings and designs

Workplace procedures relating to reporting and communication

Manufacturer instructions for the use of equipment and materials

Surface materials

may be compounds used to repair, level, smooth or skim a sub-floor of timber or concrete

Tools, equipment

may include but is not limited to finishing trowel, grouping and batching buckets, mixing palette, hair broom, trolley, plastic sheeting, mixing drill and screed bar


Sectors

Unit sector

Flooring Technology


Competency Field

Floor Preparation


Employability Skills

This unit contains employability skills.


Licensing Information

Not applicable.