Evidence Guide: AHCDRG301 - Install drainage systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCDRG301 - Install drainage systems

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for drainage system installation activities

  1. Identify the construction site for the drainage system
  2. Select materials, tools, equipment and machinery and carry out pre-operational and safety checks
  3. Identify work health and safety hazards, assess risks and implement controls
  4. Select, use and maintain suitable personal protective equipment
Identify the construction site for the drainage system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select materials, tools, equipment and machinery and carry out pre-operational and safety checks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify work health and safety hazards, assess risks and implement controls

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, use and maintain suitable personal protective equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Co-ordinate installation work

  1. Coordinate work tasks in a sequential, timely and effective manner
  2. Install the drainage system with due consideration of the environmental implications
  3. Maintain a clean and safe work area throughout work
Coordinate work tasks in a sequential, timely and effective manner

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install the drainage system with due consideration of the environmental implications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain a clean and safe work area throughout work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare the site for installation of drainage system

  1. Interpret symbols and terminology to ensure the concept of the drainage system plan is clearly understood
  2. Identify layout of services, check depths and report discrepancies
  3. Complete survey, measurement and marking out of site and confirm soil characteristics relevant to the system
Interpret symbols and terminology to ensure the concept of the drainage system plan is clearly understood

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify layout of services, check depths and report discrepancies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete survey, measurement and marking out of site and confirm soil characteristics relevant to the system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake installation of drainage system

  1. Complete excavations without damage to services, facilities, features and established plants
  2. Install the drainage system
  3. Test the drainage system for configuration, flow rates and capacity
  4. Confirm remedial action to be taken when the drainage system operation does not meet the plan specifications
Complete excavations without damage to services, facilities, features and established plants

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install the drainage system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test the drainage system for configuration, flow rates and capacity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm remedial action to be taken when the drainage system operation does not meet the plan specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete installation of drainage system

  1. Finish earthworks
  2. Restore the site and remove and dispose of waste material
  3. Clean, maintain and store tools, equipment and machinery
  4. Record work outcomes and report the works as per the executed drawings, including adjustments
Finish earthworks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore the site and remove and dispose of waste material

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, maintain and store tools, equipment and machinery

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record work outcomes and report the works as per the executed drawings, including adjustments

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for drainage system installation activities

1.1 Identify the construction site for the drainage system

1.2 Select materials, tools, equipment and machinery and carry out pre-operational and safety checks

1.3 Identify work health and safety hazards, assess risks and implement controls

1.4 Select, use and maintain suitable personal protective equipment

2. Co-ordinate installation work

2.1 Coordinate work tasks in a sequential, timely and effective manner

2.2 Install the drainage system with due consideration of the environmental implications

2.3 Maintain a clean and safe work area throughout work

3. Prepare the site for installation of drainage system

3.1 Interpret symbols and terminology to ensure the concept of the drainage system plan is clearly understood

3.2 Identify layout of services, check depths and report discrepancies

3.3 Complete survey, measurement and marking out of site and confirm soil characteristics relevant to the system

4. Undertake installation of drainage system

4.1 Complete excavations without damage to services, facilities, features and established plants

4.2 Install the drainage system

4.3 Test the drainage system for configuration, flow rates and capacity

4.4 Confirm remedial action to be taken when the drainage system operation does not meet the plan specifications

5. Complete installation of drainage system

5.1 Finish earthworks

5.2 Restore the site and remove and dispose of waste material

5.3 Clean, maintain and store tools, equipment and machinery

5.4 Record work outcomes and report the works as per the executed drawings, including adjustments

Required Skills and Knowledge

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for drainage system installation activities

1.1 Identify the construction site for the drainage system

1.2 Select materials, tools, equipment and machinery and carry out pre-operational and safety checks

1.3 Identify work health and safety hazards, assess risks and implement controls

1.4 Select, use and maintain suitable personal protective equipment

2. Co-ordinate installation work

2.1 Coordinate work tasks in a sequential, timely and effective manner

2.2 Install the drainage system with due consideration of the environmental implications

2.3 Maintain a clean and safe work area throughout work

3. Prepare the site for installation of drainage system

3.1 Interpret symbols and terminology to ensure the concept of the drainage system plan is clearly understood

3.2 Identify layout of services, check depths and report discrepancies

3.3 Complete survey, measurement and marking out of site and confirm soil characteristics relevant to the system

4. Undertake installation of drainage system

4.1 Complete excavations without damage to services, facilities, features and established plants

4.2 Install the drainage system

4.3 Test the drainage system for configuration, flow rates and capacity

4.4 Confirm remedial action to be taken when the drainage system operation does not meet the plan specifications

5. Complete installation of drainage system

5.1 Finish earthworks

5.2 Restore the site and remove and dispose of waste material

5.3 Clean, maintain and store tools, equipment and machinery

5.4 Record work outcomes and report the works as per the executed drawings, including adjustments

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

install drainage system works

interpret drainage system plans and drawings

interpret site specifications, soil types and drainage system plans

level and align earthworks

measure materials required to install drainage systems

prepare for installation activities

set out drainage system works

set out, survey, test and excavate the installation site

test the drainage system

use equipment, tools and machinery appropriate to the scope of works

The candidate must demonstrate knowledge of:

principles and practices of drainage installation

drain types, components and installation techniques

soil characteristics and their impact on drainage systems

purposes of drainage systems and the application of drainage system plans to the physical situation

work health and safety

Range Statement