The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCDRG301A - Install drainage systems

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for drainage system installation activities

  1. The construction site for the drainage system and construction method is identified according to the site and drainage system plans and enterprise work procedures.
  2. Materials, tools, equipment and machinery are selected according to drainage system design requirements and enterprise work procedures.
  3. Pre-operational and safety checks are carried out on tools, equipment and machinery according to manufacturer's specifications and enterprise work procedures.
  4. Occupational Health and Safety (OHS) hazards are identified, risks assessed and risk controls implemented.
  5. Suitable safety and Personal Protective Equipment (PPE) are selected, used and maintained.
The construction site for the drainage system and construction method is identified according to the site and drainage system plans and enterprise work procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials, tools, equipment and machinery are selected according to drainage system design requirements and enterprise work procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pre-operational and safety checks are carried out on tools, equipment and machinery according to manufacturer's specifications and enterprise work procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Occupational Health and Safety (OHS) hazards are identified, risks assessed and risk controls implemented.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Suitable safety and Personal Protective Equipment (PPE) are selected, used and maintained.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Co-ordinate installation work

  1. Enterprise work team, contractors and design consultants are identified and work tasks are co-ordinated in a sequential, timely and effective manner in consultation with the supervisor.
  2. Installation of the drainage system is undertaken according to OHS requirements and with due consideration of the environmental implications and relevant legislation and regulations.
  3. A clean and safe work area is maintained throughout and on completion of work.
Enterprise work team, contractors and design consultants are identified and work tasks are co-ordinated in a sequential, timely and effective manner in consultation with the supervisor.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation of the drainage system is undertaken according to OHS requirements and with due consideration of the environmental implications and relevant legislation and regulations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

A clean and safe work area is maintained throughout and on completion of work.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare the site for installation of drainage system

  1. Symbols and terminology are interpreted to ensure the concept of the drainage system plan is clearly understood according to industry practice.
  2. Layout of services is identified, depths checked against the site or drainage system plan and discrepancies are reported to the supervisor and the relevant authority.
  3. Survey, measurement and marking out of the site and confirmation of soil characteristics relevant to the planned drainage system are completed according to plan specifications and enterprise work procedures.
Symbols and terminology are interpreted to ensure the concept of the drainage system plan is clearly understood according to industry practice.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Layout of services is identified, depths checked against the site or drainage system plan and discrepancies are reported to the supervisor and the relevant authority.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Survey, measurement and marking out of the site and confirmation of soil characteristics relevant to the planned drainage system are completed according to plan specifications and enterprise work procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake installation of drainage system

  1. Excavations are completed without damage to services, facilities, features and established plants according to plan specifications and enterprise work procedures.
  2. The drainage system is installed according to the drainage system plan and enterprise work procedures.
  3. The drainage system is tested for configuration, flow rates and capacity consistent with the drainage system plan and according to enterprise work procedures.
  4. The supervisor is consulted and remedial action is taken when the drainage system operation does not meet the plan specifications.
Excavations are completed without damage to services, facilities, features and established plants according to plan specifications and enterprise work procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The drainage system is installed according to the drainage system plan and enterprise work procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The drainage system is tested for configuration, flow rates and capacity consistent with the drainage system plan and according to enterprise work procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The supervisor is consulted and remedial action is taken when the drainage system operation does not meet the plan specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete installation of drainage system

  1. Earthworks are finished off to the plan specifications and enterprise work procedures.
  2. The site is restored and waste material is removed from the site and disposed of in an environmentally aware and safe manner according to enterprise work procedures.
  3. Tools, equipment and machinery are cleaned, maintained and stored according to enterprise work procedures.
  4. Work outcomes are recorded or reported to the supervisor according to enterprise work procedures.
Earthworks are finished off to the plan specifications and enterprise work procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The site is restored and waste material is removed from the site and disposed of in an environmentally aware and safe manner according to enterprise work procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and machinery are cleaned, maintained and stored according to enterprise work procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work outcomes are recorded or reported to the supervisor according to enterprise work procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

interpret site specifications and drainage system plans

prepare for installation activities

set out, survey, test and excavate the installation site

measure materials

set out drainage system works

install and test the drainage system

level and align earthworks.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.

Required Skills and Knowledge

Required skills

identify hazards and implement safe work procedures

set out drainage system works

level and align earthworks

use equipment, tools and machinery

implement and follow relevant enterprise OHS and environmental policies and procedures

use literacy skills to read, interpret and follow organisational policies and procedures, follow sequenced written instructions, record accurately and legible information collected and select and apply procedures for a range of tasks

use oral communication skills/language competence to fulfil the job role as specified by the organisation, including questioning techniques, active listening, clarifying information and consulting with supervisors as required

use numeracy skills to estimate, calculate and record routine workplace measures

use interpersonal skills to work with and relate to people from a range of cultural, social and religious backgrounds and with a range of physical and mental abilities.

Required knowledge

the purposes of drainage systems and the application of drainage system plans to the physical situation

drain types, components and installation techniques

environmental impacts of irrigation and drainage systems

soil characteristics

enterprise OHS procedures

environmental impacts of installing drainage systems.

Range Statement

The range statement relates to the unit of competency as a whole.

Drainage systems may include:

surface drains

culverts

mole drains

sand slit

sub-surface traps

pit and trap systems

dune and swale systems

reed beds

water-recycling pumps and baffles.