The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for installation
|
|
Site plans and design specifications are interpreted and clarified with the supervisor. Completed |
Evidence:
|
Underground services are identified according to site plans. Completed |
Evidence:
|
Site is assessed to identify any potential problems. Completed |
Evidence:
|
Occupational Health and Safety (OHS) hazards are identified, risks assessed and suitable controls implemented. Completed |
Evidence:
|
Environmental implications of installing the hydroponic system are identified. Completed |
Evidence:
|
The site is cleared for installation according to enterprise guidelines. Completed |
Evidence:
|
Equipment and materials required for installation are determined and arranged according to design and layout plans. Completed |
Evidence:
|
Install a hydroponic system
|
|
Site is prepared for the installation of drainage channels and water collection, and storage facilities according to design specifications. Completed |
Evidence:
|
Install drainage components and water collection, and storage facilities according to design specifications. Completed |
Evidence:
|
Hydroponic system infrastructure is assembled according to design specification. Completed |
Evidence:
|
Hydroponic system components are installed according to design and layout plans and manufacturers specifications. Completed |
Evidence:
|
Any problems associated with installation are communicated to the client and/or manager. Completed |
Evidence:
|
Test and calibrate the system
|
|
Hydroponic infrastructure and systems are checked to ensure they are in good working order and meet required specifications. Completed |
Evidence:
|
Hydroponic equipment is calibrated to ensure readings are accurate. Completed |
Evidence:
|
Media is installed according to enterprise guidelines. Completed |
Evidence:
|
The hydroponic system is test run ready for the planting of the crop. Completed |
Evidence:
|
Check list of all testing results is completed and approved by client/management. Completed |
Evidence:
|
Complete installation operations
|
|
All tools and equipment are cleaned and stored according to enterprise guidelines. Completed |
Evidence:
|
Site is tidied and waste is removed and disposed of in a manner that minimises risk of damage to the environment. Completed |
Evidence:
|