The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare tools and materials for installation work
|
|
1.1 Materials, tools, equipment and machinery are selected according to irrigation design requirements and supervisor's instructions Completed |
Evidence:
|
The site for installation of the micro-irrigation system is identified according to enterprise plans and work procedures Completed |
Evidence:
|
Parts and equipment delivered to the site are checked according to system drawings and specifications Completed |
Evidence:
|
Water supply is checked to ensure that it is compatible with system specifications Completed |
Evidence:
|
Set out and prepare site
|
|
Measurement and marking out of irrigation lines is undertaken as directed by supervisor Completed |
Evidence:
|
Equipment operation and work practices conform to enterprise and legislative Occupational Health and Safety (OHS) requirements Completed |
Evidence:
|
Pre-operational and safety checks are carried out on tools, equipment and machinery according to manufacturer’s specifications and enterprise work procedures Completed |
Evidence:
|
OHS hazards are identified, risks assessed and risk controls are implemented Completed |
Evidence:
|
Personal Protective Equipment (PPE) is selected, used and maintained according to procedures Completed |
Evidence:
|
Install irrigation components
|
|
Work is undertaken according to plan and supervisor’s instructions Completed |
Evidence:
|
Components are assembled and connected according to plan, with joints completed and tested Completed |
Evidence:
|
A clean and safe work area is maintained while installation work is carried out Completed |
Evidence:
|
Tools are chosen appropriate to the task being undertaken, and used according to guidelines and safe working practices Completed |
Evidence:
|
Complete installation work
|
|
Earthworks are finished off to plan specifications and enterprise work procedures Completed |
Evidence:
|
The site is restored and waste material is removed from the site and disposed of in an environmentally aware and safe manner according to enterprise work procedures Completed |
Evidence:
|
Tools, equipment and machinery are cleaned, maintained and stored according to enterprise work procedures Completed |
Evidence:
|
System is flushed and commissioned as directed Completed |
Evidence:
|
Operating faults are identified and reported to supervisor and/or corrective actions taken Completed |
Evidence:
|