The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Perform pre-start checks for gravity fed irrigation system
|
|
Checks of water, power, fuel and lubricants ensure that all are available and the control system is operational. Completed |
Evidence:
|
Pumps are primed, if necessary, and gates and controls are open or closed in accordance with enterprise procedures. Completed |
Evidence:
|
Pipes, system equipment and outlets are positioned and set up in accordance with enterprise standards and OHS requirements. Completed |
Evidence:
|
Start up and inspect system
|
|
Syphons and other delivery mechanisms are primed and started in accordance with enterprise procedures. Completed |
Evidence:
|
Start up sequence is implemented in accordance with operations manual and water levels, and pressure built up slowly as directed. Completed |
Evidence:
|
Pressure at the headworks and control valves is within design specifications indicating efficient filter operation, and water is distributed evenly to the targeted areas with minimal wastage and run-off. Completed |
Evidence:
|
All malfunctions, leaks, damage to water courses and blockages are corrected or repaired immediately and reported in accordance with Occupational Health and Safety (OHS) and enterprise procedures. Completed |
Evidence:
|
Head water levels are monitored and maintained. Completed |
Evidence:
|
If used, pumps are monitored during operation, rubbish is cleared from outlets, and pump is backflushed in accordance with enterprise procedures. Completed |
Evidence:
|
Irrigation changes are implemented in accordance with enterprise procedures. Completed |
Evidence:
|
Water reuse systems are checked for clearance and freedom from weeds. Completed |
Evidence:
|
Shut down system based upon irrigation indicators
|
|
Area is irrigated in accordance with enterprise procedures, and time lag between shut down and end of watering is observed to minimise run-off and deep percolation. Completed |
Evidence:
|
System components are shut down in sequence in accordance with manufacturer's and enterprise procedures. Completed |
Evidence:
|
Drainage and treatment systems are checked in accordance with enterprise procedures. Completed |
Evidence:
|
Tailwater control systems are implemented in accordance with statutory requirements and enterprise standards. Completed |
Evidence:
|
Irrigation activities are reported and recorded in accordance with regulatory requirements and enterprise procedures. Completed |
Evidence:
|