NTISthis.com

Evidence Guide: AHCIRG306 - Troubleshoot irrigation systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCIRG306 - Troubleshoot irrigation systems

What evidence can you provide to prove your understanding of each of the following citeria?

Locate and identify faulty components and blockages

  1. Determine irrigation system and component function
  2. Check and review monitoring and maintenance records
  3. Carry out operational tests
  4. Identify and document faulty components and blockages
Determine irrigation system and component function

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check and review monitoring and maintenance records

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out operational tests

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and document faulty components and blockages

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shut down and isolate component

  1. Apply shut down sequence and isolation procedures
  2. Verify safe shutdown or isolation
  3. Install safety or security lock off devices and signage
Apply shut down sequence and isolation procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify safe shutdown or isolation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install safety or security lock off devices and signage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Replace faulty components and clear blockages

  1. Organise access to faulty components and blockages
  2. Remove faulty components and repair or dispose of
  3. Select and install replacement components
  4. Replace faulty components and clear blockages
  5. Clear blockages or replace blocked sections
Organise access to faulty components and blockages

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove faulty components and repair or dispose of

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and install replacement components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Replace faulty components and clear blockages

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear blockages or replace blocked sections

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Return system to normal operating status

  1. Return isolated or shutdown components to service
  2. Carry out operational tests
  3. Return system to normal operational set-up
  4. Report and record repair activities
Return isolated or shutdown components to service

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out operational tests

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Return system to normal operational set-up

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report and record repair activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Locate and identify faulty components and blockages

1.1 Determine irrigation system and component function

1.2 Check and review monitoring and maintenance records

1.3 Carry out operational tests

1.4 Identify and document faulty components and blockages

2. Shut down and isolate component

2.1 Apply shut down sequence and isolation procedures

2.2 Verify safe shutdown or isolation

2.3 Install safety or security lock off devices and signage

3. Replace faulty components and clear blockages

3.1 Organise access to faulty components and blockages

3.2 Remove faulty components and repair or dispose of

3.3 Select and install replacement components

3.4 Replace faulty components and clear blockages

3.5 Clear blockages or replace blocked sections

4. Return system to normal operating status

4.1 Return isolated or shutdown components to service

4.2 Carry out operational tests

4.3 Return system to normal operational set-up

4.4 Report and record repair activities

Required Skills and Knowledge

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Locate and identify faulty components and blockages

1.1 Determine irrigation system and component function

1.2 Check and review monitoring and maintenance records

1.3 Carry out operational tests

1.4 Identify and document faulty components and blockages

2. Shut down and isolate component

2.1 Apply shut down sequence and isolation procedures

2.2 Verify safe shutdown or isolation

2.3 Install safety or security lock off devices and signage

3. Replace faulty components and clear blockages

3.1 Organise access to faulty components and blockages

3.2 Remove faulty components and repair or dispose of

3.3 Select and install replacement components

3.4 Replace faulty components and clear blockages

3.5 Clear blockages or replace blocked sections

4. Return system to normal operating status

4.1 Return isolated or shutdown components to service

4.2 Carry out operational tests

4.3 Return system to normal operational set-up

4.4 Report and record repair activities

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting.

The candidate must provide evidence that they can:

carry out operational tests

identify adverse environmental impacts of irrigation activities and appropriate remedial action

operate, maintain and repair irrigation systems

shut down and isolate components

The candidate must demonstrate knowledge of:

characteristics and operation of replaceable components of irrigation systems

environmental impacts of irrigation using water from any ground or underground source

isolation procedures

purchasing procedures

system malfunctions and their likely causes

Range Statement