Evidence Guide: AHCIRG309 - Install irrigation pumps

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCIRG309 - Install irrigation pumps

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and sequence installation tasks from instructions

  1. Obtain drawings and specifications
  2. Plan and sequence tasks
  3. Select tools and equipment and check for serviceability
Obtain drawings and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and sequence tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select tools and equipment and check for serviceability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Source irrigation system requirements

  1. Determine location of pump
  2. Identify pump base requirements
  3. Identify, order and collect materials and equipment
  4. Check materials and equipment for acceptable condition and compliance
Determine location of pump

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify pump base requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, order and collect materials and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check materials and equipment for acceptable condition and compliance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and commission pumping and flow control components

  1. Set out and construct pump base
  2. Install pump and pump controls
  3. Connect suction and discharge lines and flow control devices
  4. Connect delivery and distribution components to pump
  5. Conduct pressure testing of pumping system
Set out and construct pump base

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install pump and pump controls

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Connect suction and discharge lines and flow control devices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Connect delivery and distribution components to pump

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct pressure testing of pumping system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work

  1. Clear work area and dispose of, reuse or recycle materials
  2. Clean, check, maintain and store tools and equipment
  3. Restore work site to meet environmental requirements
  4. Complete documentation
Clear work area and dispose of, reuse or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore work site to meet environmental requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan and sequence installation tasks from instructions

1.1 Obtain drawings and specifications

1.2 Plan and sequence tasks

1.3 Select tools and equipment and check for serviceability

2. Source irrigation system requirements

2.1 Determine location of pump

2.2 Identify pump base requirements

2.3 Identify, order and collect materials and equipment

2.4 Check materials and equipment for acceptable condition and compliance

3. Install and commission pumping and flow control components

3.1 Set out and construct pump base

3.2 Install pump and pump controls

3.3 Connect suction and discharge lines and flow control devices

3.4 Connect delivery and distribution components to pump

3.5 Conduct pressure testing of pumping system

3.6 Test pump

4. Complete work

4.1 Clear work area and dispose of, reuse or recycle materials

4.2 Clean, check, maintain and store tools and equipment

4.3 Restore work site to meet environmental requirements

4.4 Complete documentation

Required Skills and Knowledge

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan and sequence installation tasks from instructions

1.1 Obtain drawings and specifications

1.2 Plan and sequence tasks

1.3 Select tools and equipment and check for serviceability

2. Source irrigation system requirements

2.1 Determine location of pump

2.2 Identify pump base requirements

2.3 Identify, order and collect materials and equipment

2.4 Check materials and equipment for acceptable condition and compliance

3. Install and commission pumping and flow control components

3.1 Set out and construct pump base

3.2 Install pump and pump controls

3.3 Connect suction and discharge lines and flow control devices

3.4 Connect delivery and distribution components to pump

3.5 Conduct pressure testing of pumping system

3.6 Test pump

4. Complete work

4.1 Clear work area and dispose of, reuse or recycle materials

4.2 Clean, check, maintain and store tools and equipment

4.3 Restore work site to meet environmental requirements

4.4 Complete documentation

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting.

The candidate must provide evidence that they can:

follow plans, charts and instructions

handle materials safely

identify and respond to operational problems

match pump output and flow rate to pipe diameter

monitor the performance of valves

open and close valves

organise equipment and materials for installation work

perform work-related calculations

position pumps and valves

prime and operate pumps

set out and prepare the site

use power tools and hand tools

weld in both poly and steel

The candidate must explain:

advantages and disadvantages of each pump type

automatic pump switches including timers, pressure switches, irrigation controllers and flow switches

basic principles of hydraulics (flow vs. pressure), energy loss due to friction

characteristics and application of different valves, pipes and fittings including fixing and joining techniques and methods

discharge and flow rates

impellers, rotors, stators

installation procedures for irrigation pumps

properties of water including pressure and flow rates

pump components and their principles of operation

pump gauges and controls

pump performance and pressure testing

servicing requirements for pumps

types of pumps and their application in irrigation, such as centrifugal, vertical turbine, submersible and propeller

types of valves

types suitable as booster and floating pumps

Range Statement