The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Organise resources for installation of surface irrigation systems
|
|
Materials, tools, equipment and machinery are selected according to the irrigation system design requirements and enterprise work procedures Completed |
Evidence:
|
The construction site for the irrigation system and construction method is identified according to the site and irrigation system plans and enterprise work procedures Completed |
Evidence:
|
Parts and equipment delivered to site are checked according to system drawings and specifications Completed |
Evidence:
|
Pre-operational and safety checks are carried out on tools, equipment and machinery according to manufacturer specifications and enterprise work procedures Completed |
Evidence:
|
Occupational Health and Safety (OHS) hazards are identified, risks assessed, controls implemented and reported to the supervisor Completed |
Evidence:
|
Suitable safety and personal protective equipment (PPE) are selected, used and maintained Completed |
Evidence:
|
Water supply is checked to ensure that it is compatible with system specifications Completed |
Evidence:
|
Interpret the surface irrigation plan and mark up
|
|
Plan is interpreted and levels are taken Completed |
Evidence:
|
Structures are marked out and earthworks pegged Completed |
Evidence:
|
A clean and safe work area is maintained while installation work is carried out Completed |
Evidence:
|
Tools appropriate to the task being undertaken are chosen and used according to guidelines and safe working practices are employed Completed |
Evidence:
|
Prepare and maintain diversion and conveyancing structures
|
|
Excavations are completed according to plan specifications and enterprise work procedures Completed |
Evidence:
|
Channels are installed according to the irrigation plan and enterprise work procedures Completed |
Evidence:
|
Diversion and conveyancing structures are installed
|
|
Structures are tested for configuration, flow rates and capacity consistent with the system plan and according to enterprise work procedures Completed |
Evidence:
|
Prepare beds
|
|
Excavations are completed according to plan specifications and enterprise work procedures Completed |
Evidence:
|
Beds are installed according to the irrigation plan and enterprise work procedures Completed |
Evidence:
|
Bed surface is prepared with use of roto-buck Completed |
Evidence:
|
Field distribution structuresare installed or prepared
|
|
The supervisor is consulted and remedial action is taken when beds do not meet the plan specifications Completed |
Evidence:
|
Complete water measurement and tailwater works
|
|
Excavations are completed according to plan specifications and enterprise work procedures Completed |
Evidence:
|
Water measurement structures are installed according to the irrigation plan and enterprise work procedures
|
|
Channels and tailwater storages are installed according to the irrigation plan and enterprise work procedures Completed |
Evidence:
|
Pumping equipment, lines and filters are installed for recycling Completed |
Evidence:
|
Complete installation work
|
|
Earthworks and structures are finished off to plan specifications and enterprise work procedures Completed |
Evidence:
|
The system configuration and capacity matches the installation plan Completed |
Evidence:
|
The site is restored and waste material is removed from the site and disposed of in an environmentally aware and safe manner according to enterprise work procedures Completed |
Evidence:
|
Tools, equipment and machinery are cleaned, maintained and stored according to enterprise work procedures Completed |
Evidence:
|
Assist in commissioning a surface irrigation system
|
|
Water is supplied from channels or head ditches Completed |
Evidence:
|
Watering sequence is in accordance with organisational procedures Completed |
Evidence:
|
Testing and monitoring equipment are calibrated to manufacturer specifications Completed |
Evidence:
|
System is monitored for watering efficiency, deep percolation and tailwater Completed |
Evidence:
|
Operating faults are identified and corrective actions taken. Completed |
Evidence:
|
Work outcomes are recorded or reported to the supervisor according to enterprise work procedures Completed |
Evidence:
|