NTISthis.com

Evidence Guide: AHCIRG323A - Operate moving sprinkler irrigation systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCIRG323A - Operate moving sprinkler irrigation systems

What evidence can you provide to prove your understanding of each of the following citeria?

Carry out pre-start checks

  1. Checks of water, power, fuel and lubricants ensure that all are available and the control system is operational
  2. Pumps are primed, if necessary, and valves and controls are open or closed as directed
  3. Pressure and flow testing equipment are calibrated and available as required
  4. Regular maintenance is carried out
  5. Other pre-start system checks are carried out in accordance with manufacturer’s requirements and enterprise procedures
Checks of water, power, fuel and lubricants ensure that all are available and the control system is operational

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pumps are primed, if necessary, and valves and controls are open or closed as directed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pressure and flow testing equipment are calibrated and available as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Regular maintenance is carried out

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Other pre-start system checks are carried out in accordance with manufacturer’s requirements and enterprise procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and operate the system

  1. Start up sequence is implemented in accordance with operations manual
  2. Emitter spacing is checked against the irrigation plan
  3. The transport mechanism is monitored and serviced
  4. The irrigation controller is checked for programming and efficiency
  5. All malfunctions, leaks and blockages are corrected or repaired immediately and reported in accordance with enterprise procedures
Start up sequence is implemented in accordance with operations manual

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Emitter spacing is checked against the irrigation plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The transport mechanism is monitored and serviced

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The irrigation controller is checked for programming and efficiency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All malfunctions, leaks and blockages are corrected or repaired immediately and reported in accordance with enterprise procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor the irrigation operation

  1. The irrigation schedule is applied and soil profile monitored for wetting
  2. Sprinkler performance is measured using catch cans
  3. Flow rates are measured using containers of known volume
  4. Operating pressures are measured using pressure gauges
  5. The irrigated area is checked for wheel ruts and other signs of waterlogging
The irrigation schedule is applied and soil profile monitored for wetting

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sprinkler performance is measured using catch cans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Flow rates are measured using containers of known volume

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operating pressures are measured using pressure gauges

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The irrigated area is checked for wheel ruts and other signs of waterlogging

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shut down the system in response to irrigation indicators

  1. Water is applied for sufficient time to achieve required soil moisture levels in accordance with irrigation schedule, environmental considerations and allowing for weather conditions
  2. System components are shut down and drained in sequence in accordance with manufacturer’s specifications and enterprise procedures
  3. Drainage and treatment systems are checked in accordance with enterprise procedures
  4. Irrigation activities are recorded and reported in accordance with regulatory requirements and enterprise procedures
Water is applied for sufficient time to achieve required soil moisture levels in accordance with irrigation schedule, environmental considerations and allowing for weather conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

System components are shut down and drained in sequence in accordance with manufacturer’s specifications and enterprise procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drainage and treatment systems are checked in accordance with enterprise procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Irrigation activities are recorded and reported in accordance with regulatory requirements and enterprise procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this Unit

The evidence required to demonstrate competency in this Unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

read and follow operations manual and irrigation schedules

carry out pre-start checks

operate and inspect the system

measure and interpret flow rates and pressures

identify environmental hazards

shut down in response to irrigation indicators.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.

Required Skills and Knowledge

Required skills include:

Ability to:

read and follow operations manual and irrigation schedules

operate pressure and flow testing equipment

carry out pre-start checks and prime pumps

start up system and carry out operational checks

measure and interpret flow rates and pressures

monitor system effectiveness

application rates

irrigation times

sprinkler output

pressure variations

salinity levels and water quality

depth of irrigation

energy efficiency

use control systems

shut down, clean equipment and dispose of waste

use personal protective equipment

perform shut down procedures

take and record measurements of output and efficiency

record data.

Required knowledge includes:

Knowledge of:

general irrigation methods for moving sprinkler systems

main components of moving sprinkler irrigation systems

pump types used in moving sprinkler irrigation systems and their operation

energy efficiency indicators/ benchmarks for moving sprinkler irrigation

Application Efficiency

Average Application Rate

Instantaneous Application Rate

shutdown sequence

environmental impacts of irrigation using water from any ground or underground source

soil characteristics

soil/plant/water relationships

water requirements of plants/crops consistent with sound environmental management

critical measures for moisture availability

readily available water

wilting point

field capacity

monitoring soil compaction and drainage

environmental hazards of moving sprinkler systems including soil compaction and guttering

OHS legislation and safe work procedures.

Range Statement

The range statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Moving sprinkler systems may include:

specifically hard and soft reel self-travelling irrigators, lateral move systems and centre pivots.

Moving sprinkler system components include:

spans

tower

tower wheels

outlets

emitters

droppers

pressure regulator

irrigation controller.