NTISthis.com

Evidence Guide: AHCIRG335 - Operate and maintain moving irrigation system

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCIRG335 - Operate and maintain moving irrigation system

What evidence can you provide to prove your understanding of each of the following citeria?

Install a moving sprinkler irrigation system

  1. Select required materials, tools, equipment and machinery
  2. Join span pipes with correctly tensioned bolts
  3. Connect V-jack trusses in sequence to bow the span
  4. Connect goose necks and hose connectors
  5. Fit pre-cut drop hoses and connect sprinklers
Select required materials, tools, equipment and machinery

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Join span pipes with correctly tensioned bolts

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Connect V-jack trusses in sequence to bow the span

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Connect goose necks and hose connectors

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fit pre-cut drop hoses and connect sprinklers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete assembly of moving sprinkler components

  1. Assemble sprinklers, pressure regulators and hose directors
  2. Fit gear box and control panel
  3. Fit and tension wheels
Assemble sprinklers, pressure regulators and hose directors

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fit gear box and control panel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fit and tension wheels

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assist in commissioning a moving sprinkler irrigation system

  1. Connect and start pumping system and flush as required
  2. Calibrate testing and monitoring equipment to manufacturer specifications
Connect and start pumping system and flush as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Calibrate testing and monitoring equipment to manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate the system

  1. Prime pumps, open or close valves and controls and begin the start-up sequence
  2. Check emitter spacing
  3. Monitor and service the transport mechanism
  4. Check the irrigation controller for programming and efficiency
  5. Correct or repair all malfunctions, leaks and blockages
Prime pumps, open or close valves and controls and begin the start-up sequence

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check emitter spacing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor and service the transport mechanism

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check the irrigation controller for programming and efficiency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Correct or repair all malfunctions, leaks and blockages

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor the irrigation operation

  1. Implement the irrigation schedule and monitor soil profile for wetting
  2. Measure sprinkler performance using catch cans
  3. Measure flow rates using containers of known volume
  4. Measure operating pressures using pressure gauges
  5. Check the irrigated area for wheel ruts and other signs of waterlogging
Implement the irrigation schedule and monitor soil profile for wetting

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measure sprinkler performance using catch cans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measure flow rates using containers of known volume

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measure operating pressures using pressure gauges

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check the irrigated area for wheel ruts and other signs of waterlogging

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out system maintenance

  1. Record damage and blockages with contaminants by damage type, location and the section of the system affected
  2. Record and report damaged or faulty pumps, valves, sprinklers, electrical components and computer control systems and take action to effect repairs
  3. Measure outlet pressure, flow rate and energy use and record on a regular basis
  4. Inspect and maintain drive mechanism, frames and trusses
  5. Implement end of season maintenance procedures
  6. Implement routine and preventative maintenance procedures
  7. Implement storage procedures for irrigation components
Record damage and blockages with contaminants by damage type, location and the section of the system affected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record and report damaged or faulty pumps, valves, sprinklers, electrical components and computer control systems and take action to effect repairs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measure outlet pressure, flow rate and energy use and record on a regular basis

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and maintain drive mechanism, frames and trusses

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement end of season maintenance procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement routine and preventative maintenance procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement storage procedures for irrigation components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shut down the system in response to irrigation indicators

  1. Apply water for sufficient time to achieve required soil moisture levels and allowing for weather conditions
  2. Shut down system components and drain
  3. Check drainage and treatment systems
  4. Record and report irrigation activities
Apply water for sufficient time to achieve required soil moisture levels and allowing for weather conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shut down system components and drain

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check drainage and treatment systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record and report irrigation activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Install a moving sprinkler irrigation system

1.1 Select required materials, tools, equipment and machinery

1.2 Join span pipes with correctly tensioned bolts

1.3 Connect V-jack trusses in sequence to bow the span

1.4 Connect goose necks and hose connectors

1.5 Fit pre-cut drop hoses and connect sprinklers

2. Complete assembly of moving sprinkler components

2.1 Assemble sprinklers, pressure regulators and hose directors

2.2 Fit gear box and control panel

2.3 Fit and tension wheels

3. Assist in commissioning a moving sprinkler irrigation system

3.1 Connect and start pumping system and flush as required

3.2 Calibrate testing and monitoring equipment to manufacturer specifications

4. Operate the system

4.1 Prime pumps, open or close valves and controls and begin the start-up sequence

4.2 Check emitter spacing

4.3 Monitor and service the transport mechanism

4.4 Check the irrigation controller for programming and efficiency

4.5 Correct or repair all malfunctions, leaks and blockages

5. Monitor the irrigation operation

5.1 Implement the irrigation schedule and monitor soil profile for wetting

5.2 Measure sprinkler performance using catch cans

5.3 Measure flow rates using containers of known volume

5.4 Measure operating pressures using pressure gauges

5.5 Check the irrigated area for wheel ruts and other signs of waterlogging

6. Carry out system maintenance

6.1 Record damage and blockages with contaminants by damage type, location and the section of the system affected

6.2 Record and report damaged or faulty pumps, valves, sprinklers, electrical components and computer control systems and take action to effect repairs

6.3 Measure outlet pressure, flow rate and energy use and record on a regular basis

6.4 Inspect and maintain drive mechanism, frames and trusses

6.5 Implement end of season maintenance procedures

6.6 Implement routine and preventative maintenance procedures

6.7 Implement storage procedures for irrigation components

7. Shut down the system in response to irrigation indicators

7.1 Apply water for sufficient time to achieve required soil moisture levels and allowing for weather conditions

7.2 Shut down system components and drain

7.3 Check drainage and treatment systems

7.4 Record and report irrigation activities

Required Skills and Knowledge

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Install a moving sprinkler irrigation system

1.1 Select required materials, tools, equipment and machinery

1.2 Join span pipes with correctly tensioned bolts

1.3 Connect V-jack trusses in sequence to bow the span

1.4 Connect goose necks and hose connectors

1.5 Fit pre-cut drop hoses and connect sprinklers

2. Complete assembly of moving sprinkler components

2.1 Assemble sprinklers, pressure regulators and hose directors

2.2 Fit gear box and control panel

2.3 Fit and tension wheels

3. Assist in commissioning a moving sprinkler irrigation system

3.1 Connect and start pumping system and flush as required

3.2 Calibrate testing and monitoring equipment to manufacturer specifications

4. Operate the system

4.1 Prime pumps, open or close valves and controls and begin the start-up sequence

4.2 Check emitter spacing

4.3 Monitor and service the transport mechanism

4.4 Check the irrigation controller for programming and efficiency

4.5 Correct or repair all malfunctions, leaks and blockages

5. Monitor the irrigation operation

5.1 Implement the irrigation schedule and monitor soil profile for wetting

5.2 Measure sprinkler performance using catch cans

5.3 Measure flow rates using containers of known volume

5.4 Measure operating pressures using pressure gauges

5.5 Check the irrigated area for wheel ruts and other signs of waterlogging

6. Carry out system maintenance

6.1 Record damage and blockages with contaminants by damage type, location and the section of the system affected

6.2 Record and report damaged or faulty pumps, valves, sprinklers, electrical components and computer control systems and take action to effect repairs

6.3 Measure outlet pressure, flow rate and energy use and record on a regular basis

6.4 Inspect and maintain drive mechanism, frames and trusses

6.5 Implement end of season maintenance procedures

6.6 Implement routine and preventative maintenance procedures

6.7 Implement storage procedures for irrigation components

7. Shut down the system in response to irrigation indicators

7.1 Apply water for sufficient time to achieve required soil moisture levels and allowing for weather conditions

7.2 Shut down system components and drain

7.3 Check drainage and treatment systems

7.4 Record and report irrigation activities

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

change engine oil and filter

check all bolts for correct torques

check for malfunctioning sprinklers

check injection pump and safety equipment operation

complete regular and end of season maintenance tasks

fit control panel and wheels

grease drive shafts on pump and motor

inspect lift base and arms for any stress marks or cracks

measure and interpret flow rates and pressures

monitor system effectiveness

operate pressure and flow testing equipment

read and follow operations manuals and irrigation schedules

shut down, clean equipment and dispose of waste

start-up system and carry out operational checks

take and record measurements of output and efficiency

tension span pipes with V-jack trusses

use control systems

The candidate must demonstrate knowledge of:

principles and practices of moving irrigation system installation, operation and maintenance

behaviour of water on varying terrain and soil types

calculations used when installing irrigation systems

common operational and maintenance problems

components of a moving sprinkler irrigation system and their maintenance requirements

installing a moving sprinkler irrigation

irrigation methods for moving sprinkler systems

maintenance requirements for moving sprinkler systems

monitoring soil compaction and drainage

moving sprinkler irrigation maintenance

pump used in moving sprinkler irrigation systems and their operation

shutdown sequence

soil water retention testing techniques

soil, plant and water relationships

water quality and water filtration techniques

water requirements of plants and crops consistent with sound environmental management

Range Statement