Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCIRG412A - Construct and install a sprinkler irrigation system

What evidence can you provide to prove your understanding of each of the following citeria?

Develop and implement construction procedures

  1. Employment procedures and contract management procedures are developed
  2. Procedures for controlling and recording site deliveries are established
  3. Procedures for recording the hire of plant and equipment are determined
  4. OHS procedures are established, including risk assessment
  5. Client, authorities and agencies are notified of the schedule of works
  6. Procedures for dealing with environmental issues associated with construction work are determined
Employment procedures and contract management procedures are developed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Procedures for controlling and recording site deliveries are established

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Procedures for recording the hire of plant and equipment are determined

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

OHS procedures are established, including risk assessment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Client, authorities and agencies are notified of the schedule of works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Procedures for dealing with environmental issues associated with construction work are determined

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Interpret the sprinkler irrigation systemdesign for the site

  1. The purpose, scale and required output of the irrigation system is determined
  2. The landscape of the site is assessed
  3. Construction requirements are determined and verified with the designer
  4. Components are selected to meet design specifications and site requirements
The purpose, scale and required output of the irrigation system is determined

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The landscape of the site is assessed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construction requirements are determined and verified with the designer

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Components are selected to meet design specifications and site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Organise resource requirements

  1. Tasks and timelines are nominated with resources required for each
  2. Labour requirements are organised
  3. Parts and equipment are delivered to the site and checked
  4. Equipment and machinery is selected and maintained
  5. Jobs and tasks are allocated to the work team
  6. Safety induction is carried out for the task and site
Tasks and timelines are nominated with resources required for each

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Labour requirements are organised

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Parts and equipment are delivered to the site and checked

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment and machinery is selected and maintained

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Jobs and tasks are allocated to the work team

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety induction is carried out for the task and site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Supervise installation and construction

  1. Plan is interpreted and installers are supervised and work is monitored to conform to the plan.
  2. Components are assembled and connected according to the plan, and joints are completed and tested according to manufacturer specifications.
  3. Fittings and valves are fitted and adjusted to the requirements of the installation plan, and all joints are secured according to enterprise guidelines.
  4. Pumping system is installed and tested
Plan is interpreted and installers are supervised and work is monitored to conform to the plan.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Components are assembled and connected according to the plan, and joints are completed and tested according to manufacturer specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fittings and valves are fitted and adjusted to the requirements of the installation plan, and all joints are secured according to enterprise guidelines.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pumping system is installed and tested

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete installation work and test components

  1. Water supply is connected
  2. The system is started up and flushed
  3. Sprinklers are checked for optimal coverage and efficiency
  4. Measuring devices and controllers are attached to the system
Water supply is connected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The system is started up and flushed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sprinklers are checked for optimal coverage and efficiency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measuring devices and controllers are attached to the system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commission system

  1. Operating faults are identified and corrective actions taken to meet design specifications
  2. Testing/monitoring equipment is calibrated to manufacturer’s specifications
  3. Pressure testing is carried out and compared to specifications
  4. Adjustments are made as required
  5. The system is handed over in compliance with design specifications
Operating faults are identified and corrective actions taken to meet design specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Testing/monitoring equipment is calibrated to manufacturer’s specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pressure testing is carried out and compared to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjustments are made as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The system is handed over in compliance with design specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this Unit

The evidence required to demonstrate competency in this Unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

establish the requirements of the system

implement operational procedures for the project

establish and organise resources

supervise on-site construction

commission the system.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.

Required Skills and Knowledge

Required skills include:

Ability to:

interpret irrigation designs

develop operational procedures

implement employment procedures

conduct OHS risk assessment

supervise operational tasks

earth moving and construction

power and pumping plant installation

supply and distribution pipeline laying and joining

sprinkler lateral pipelines laying and joining

setting up irrigation controllers

pressure testing of the system

use literacy skills to read, interpret and follow organisational policies and procedures, develop sequenced written instructions, record accurately and legibly information collected and select and apply procedures to a range of tasks

use oral communication skills/language competence to fulfil the job role as specified by the organisation including questioning, active listening, asking for clarification, negotiating solutions and responding to a range of views

use interpersonal skills to work with others and relate to people from a range of cultural, social and religious backgrounds and with a range of physical and mental abilities.

Required knowledge includes:

Knowledge of:

calculations for installing sprinkler irrigation systems

behaviour of water on varying terrain and soil types

soil water retention testing techniques

organising equipment and materials for installation work

water quality and water filtration techniques

pump capacity

types of pumps and water flow rates

volume and pressure requirements

operating specifications for pressures and flow rates

distribution uniformity

characteristics and operation of joints, valves and sprinkler components

water quality and water filtration techniques

labour requirements and management

environmental impacts of sprinkler irrigation

irrigation system components and operating specifications

site preparation and construction procedures

safe work practices for construction

licensing requirements for electrical work.

Range Statement

The range statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Sprinkler irrigation systems may include:

any systems that use spray or rotor type sprinklers to distribute irrigation water at higher volume including pop-up sprinklers, fixed, and movable sprinklers (e.g. K Line and Ezy Shift).