The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCIRG424A - Construct and install an irrigation drainage system

What evidence can you provide to prove your understanding of each of the following citeria?

Develop and implement construction procedures

  1. Employment procedures and contract management procedures are developed
  2. Procedures for controlling and recording site deliveries are established
  3. Procedures for recording the hire of plant and equipment are determined
  4. OHS procedures are established, including risk assessment
  5. Client, authorities and agencies are notified of the schedule of works
  6. Procedures for dealing with environmental issues associated with construction work are determined
Employment procedures and contract management procedures are developed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Procedures for controlling and recording site deliveries are established

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Procedures for recording the hire of plant and equipment are determined

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

OHS procedures are established, including risk assessment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Client, authorities and agencies are notified of the schedule of works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Procedures for dealing with environmental issues associated with construction work are determined

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Organise resource requirements

  1. Tasks and timelines are nominated with resources required for each
  2. Labour requirements are organised
  3. Parts and equipment are delivered to the site and checked
  4. Equipment and machinery is selected and maintained
  5. Jobs and tasks are allocated to the work team
  6. Safety induction is carried out for the task and site
Tasks and timelines are nominated with resources required for each

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Labour requirements are organised

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Parts and equipment are delivered to the site and checked

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment and machinery is selected and maintained

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Jobs and tasks are allocated to the work team

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety induction is carried out for the task and site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Interpret the irrigation drainage systemdesign for the site

  1. The purpose, scale and required output of the irrigation drainage system is established from the drainage plan
  2. The landscape of the site is assessed
  3. Construction requirements are determined and verified with the designer
  4. Components are selected to meet design specifications and site requirements
The purpose, scale and required output of the irrigation drainage system is established from the drainage plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The landscape of the site is assessed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construction requirements are determined and verified with the designer

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Components are selected to meet design specifications and site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out preparatory work

  1. The site is cleaned and marked out
  2. Drainage structures are pegged out
  3. Levels are taken and earth works planned
The site is cleaned and marked out

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drainage structures are pegged out

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Levels are taken and earth works planned

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Supervise construction of the drainage system

  1. Trenches are excavated to specification
  2. Earth works are carried out
  3. Drainage structures are constructed
  4. Pipes are laid and joined
  5. Fittings and valves are fitted and adjusted to the requirements of the installation plan, and all joints are secured according to enterprise guidelines.
  6. Pumping system is installed and tested
Trenches are excavated to specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Earth works are carried out

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drainage structures are constructed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pipes are laid and joined

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fittings and valves are fitted and adjusted to the requirements of the installation plan, and all joints are secured according to enterprise guidelines.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pumping system is installed and tested

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commission the irrigation drainage system

  1. The system is started up
  2. Operating faults are identified and corrective actions taken to meet design specifications
  3. Testing/monitoring equipment is used to monitor system efficiency
  4. Adjustments are made as required
The system is started up

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operating faults are identified and corrective actions taken to meet design specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Testing/monitoring equipment is used to monitor system efficiency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjustments are made as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rehabilitate the works area

  1. Earthworks are resurfaced and sealed
  2. Vegetation areas are planted and maintained
  3. Waste and surplus materials are disposed of in an environmentally sound manner
Earthworks are resurfaced and sealed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Vegetation areas are planted and maintained

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Waste and surplus materials are disposed of in an environmentally sound manner

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this Unit

The evidence required to demonstrate competency in this Unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

establish the requirements of the drainage system

implement operational procedures for the projec;

establish and organise resources

supervise on-site construction

commission the drainage system

rehabilitate the site.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.

Required Skills and Knowledge

Required skills include:

Ability to:

interpret irrigation designs

develop operational procedures

implement employment procedures

conduct OHS risk assessment

supervise workers in:

earth moving and construction procedures

power and pumping plant installation

pump and gated pipe installation

construction of canals, channels, head ditches, beds, check structures, tailwater holding ponds

estimate quantities and volumes of soil to be moved

document requirements for structures

use literacy skills to read, interpret and follow organisational policies and procedures, develop sequenced written instructions, record accurately and legibly information collected and select and apply procedures to a range of tasks

use oral communication skills/language competence to fulfil the job role as specified by the organisation including questioning, active listening, asking for clarification, negotiating solutions and responding to a range of views

use interpersonal skills to work with others and relate to people from a range of cultural, social and religious backgrounds and with a range of physical and mental abilities.

Required knowledge includes:

Knowledge of:

measuring and monitoring procedures for factors contributing to drainage system performance

positive and negative environmental impacts of drainage systems

water table and salinity measures

water quality monitoring methods and techniques

soil moisture measurement procedures

water authority standards and procedures

drainage appliances/fixtures/fittings and related

level and align site

types and operational parameters of drains

components used in drainage systems

isolation processes and procedures

levelling and alignment processes

regulatory requirements, codes of practice and relevant enterprise service standards relating to blockage removal, disconnection and reconnection activities

enterprise policies and procedures

environmental role of drainage systems

environmental impacts of drainage systems.

Range Statement

The range statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Irrigation drainage systems may include:

both surface and sub-surface drainage installed to handle water which is excess to plant requirements in an irrigated area.