NTISthis.com

Evidence Guide: AHCIRG431 - Supervise irrigation system installation

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCIRG431 - Supervise irrigation system installation

What evidence can you provide to prove your understanding of each of the following citeria?

Develop and implement construction procedures

  1. Develop employment and contract management procedures
  2. Develop procedures for controlling and recording site deliveries
  3. Develop procedures for recording the hire of plant and equipment
  4. Determine work health and safety procedures, including risk assessment
  5. Notify client, authorities and agencies of the schedule of works
  6. Develop procedures for dealing with environmental issues associated with construction work
Develop employment and contract management procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop procedures for controlling and recording site deliveries

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop procedures for recording the hire of plant and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine work health and safety procedures, including risk assessment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notify client, authorities and agencies of the schedule of works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop procedures for dealing with environmental issues associated with construction work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Interpret the irrigation system design for the site

  1. Determine the purpose, scale and required output of the irrigation system
  2. Assess the landscape of the site
  3. Determine construction requirements and verify with the designer
  4. Select components to meet design specifications and site requirements
Determine the purpose, scale and required output of the irrigation system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess the landscape of the site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine construction requirements and verify with the designer

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select components to meet design specifications and site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Organise resource requirements

  1. Nominate tasks and timelines and the required resources for each
  2. Organise labour requirements
  3. Verify and check parts and equipment delivered to the site
  4. Select and maintain equipment and machinery
  5. Allocate jobs and tasks to the work team
  6. Carry out safety induction for the task and site
Nominate tasks and timelines and the required resources for each

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Organise labour requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify and check parts and equipment delivered to the site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and maintain equipment and machinery

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Allocate jobs and tasks to the work team

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out safety induction for the task and site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Supervise construction work

  1. Interpret plan and supervise construction work
  2. Confirm site is prepared and set out appropriately
  3. Confirm the correct lay out of the main lateral line
  4. Supervise the insertion of sub-mains and flushing manifold
  5. Supervise the installation of risers, emitters and other components
Interpret plan and supervise construction work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm site is prepared and set out appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm the correct lay out of the main lateral line

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Supervise the insertion of sub-mains and flushing manifold

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Supervise the installation of risers, emitters and other components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete installation work and test components

  1. Connect water supply
  2. Check emitters for optimal coverage and efficiency
  3. Set valves to allow water to targeted areas
  4. Start up and flush the system
  5. Attach measuring devices and controllers to the system
Connect water supply

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check emitters for optimal coverage and efficiency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set valves to allow water to targeted areas

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Start up and flush the system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Attach measuring devices and controllers to the system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commission system

  1. Identify operating faults and take corrective action to meet design specifications
  2. Calibrate testing and monitoring equipment
  3. Carry out testing procedures and record
  4. Hand over system in operating order
Identify operating faults and take corrective action to meet design specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Calibrate testing and monitoring equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out testing procedures and record

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hand over system in operating order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Develop and implement construction procedures

1.1 Develop employment and contract management procedures

1.2 Develop procedures for controlling and recording site deliveries

1.3 Develop procedures for recording the hire of plant and equipment

1.4 Determine work health and safety procedures, including risk assessment

1.5 Notify client, authorities and agencies of the schedule of works

1.6 Develop procedures for dealing with environmental issues associated with construction work

2. Interpret the irrigation system design for the site

2.1 Determine the purpose, scale and required output of the irrigation system

2.2 Assess the landscape of the site

2.3 Determine construction requirements and verify with the designer

2.4 Select components to meet design specifications and site requirements

3. Organise resource requirements

3.1 Nominate tasks and timelines and the required resources for each

3.2 Organise labour requirements

3.3 Verify and check parts and equipment delivered to the site

3.4 Select and maintain equipment and machinery

3.5 Allocate jobs and tasks to the work team

3.6 Carry out safety induction for the task and site

4. Supervise construction work

4.1 Interpret plan and supervise construction work

4.2 Confirm site is prepared and set out appropriately

4.3 Confirm the correct lay out of the main lateral line

4.4 Supervise the insertion of sub-mains and flushing manifold

4.5 Supervise the installation of risers, emitters and other components

5. Complete installation work and test components

5.1 Connect water supply

5.2 Check emitters for optimal coverage and efficiency

5.3 Set valves to allow water to targeted areas

5.4 Start up and flush the system

5.5 Attach measuring devices and controllers to the system

6. Commission system

6.1 Identify operating faults and take corrective action to meet design specifications

6.2 Calibrate testing and monitoring equipment

6.3 Carry out testing procedures and record

6.4 Hand over system in operating order

Required Skills and Knowledge

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Develop and implement construction procedures

1.1 Develop employment and contract management procedures

1.2 Develop procedures for controlling and recording site deliveries

1.3 Develop procedures for recording the hire of plant and equipment

1.4 Determine work health and safety procedures, including risk assessment

1.5 Notify client, authorities and agencies of the schedule of works

1.6 Develop procedures for dealing with environmental issues associated with construction work

2. Interpret the irrigation system design for the site

2.1 Determine the purpose, scale and required output of the irrigation system

2.2 Assess the landscape of the site

2.3 Determine construction requirements and verify with the designer

2.4 Select components to meet design specifications and site requirements

3. Organise resource requirements

3.1 Nominate tasks and timelines and the required resources for each

3.2 Organise labour requirements

3.3 Verify and check parts and equipment delivered to the site

3.4 Select and maintain equipment and machinery

3.5 Allocate jobs and tasks to the work team

3.6 Carry out safety induction for the task and site

4. Supervise construction work

4.1 Interpret plan and supervise construction work

4.2 Confirm site is prepared and set out appropriately

4.3 Confirm the correct lay out of the main lateral line

4.4 Supervise the insertion of sub-mains and flushing manifold

4.5 Supervise the installation of risers, emitters and other components

5. Complete installation work and test components

5.1 Connect water supply

5.2 Check emitters for optimal coverage and efficiency

5.3 Set valves to allow water to targeted areas

5.4 Start up and flush the system

5.5 Attach measuring devices and controllers to the system

6. Commission system

6.1 Identify operating faults and take corrective action to meet design specifications

6.2 Calibrate testing and monitoring equipment

6.3 Carry out testing procedures and record

6.4 Hand over system in operating order

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

conduct work health and safety risk assessment

develop operational procedures

implement employment procedures

interpret irrigation designs

supervise installation tasks such as:

assembling sprinklers, pressure regulators and hose directors

checking operating specifications for pressures and flow rates

completing installation work and testing components

installing irrigation components

installing power and pumping plant

laying and joining sprinkler lateral pipelines

laying and joining supply and distribution pipeline

pressure testing the system

setting out and preparing site

setting up irrigation controllers

undertaking start-up procedures

The candidate must demonstrate knowledge of:

principles and practices of irrigation system installation supervision

behaviour of water on varying terrain and soil types

calculations for installing low volume irrigation systems

characteristics and operation of joints, valves and sprinkler components

commissioning procedures

design interpretation

distribution uniformity

employment procedures

licensing requirements for electrical work

operating specifications for pressures and flow rates

project management principles

pump capacity

safe work practices for construction

setting up fertigation equipment

setting up irrigation controllers

soil water retention testing techniques

start-up procedures

types of pumps and water flow rates

volume and pressure requirements

water quality and water filtration techniques

Range Statement