Evidence Guide: AHCLPW303A - Construct access tracks

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCLPW303A - Construct access tracks

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for construction of access track

  1. Equipment and attachments are matched to programmed tasks and terrain scheduled on site.
  2. Work readiness of selected equipment is verified in line with contractor policy.
  3. Construction details and sequence are confirmed from supervisor.
  4. Survey pegs and site indicators are identified and located on work site.
  5. Compliance with relevant regulatory planning and environmental legislation are confirmed.
  6. Organisational occupational health&safety procedures, practices policies, and precautions are observed and followed.
  7. Site environmental concerns are adhered to in accordance with relevant national, state, and local legislation and/or regulations.
  8. Determine control points, required grades, and water crossing points and structures from field observations and any available additional information.
  9. Any permits or licences required for the construction are identified, sought and obtained.
  10. People, materials and equipment required for the construction are coordinated and scheduled in accordance with organisation guidelines.
Equipment and attachments are matched to programmed tasks and terrain scheduled on site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work readiness of selected equipment is verified in line with contractor policy.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construction details and sequence are confirmed from supervisor.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Survey pegs and site indicators are identified and located on work site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compliance with relevant regulatory planning and environmental legislation are confirmed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Organisational occupational health&safety procedures, practices policies, and precautions are observed and followed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site environmental concerns are adhered to in accordance with relevant national, state, and local legislation and/or regulations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine control points, required grades, and water crossing points and structures from field observations and any available additional information.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Any permits or licences required for the construction are identified, sought and obtained.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

People, materials and equipment required for the construction are coordinated and scheduled in accordance with organisation guidelines.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Form access track

  1. Industry endorsed earthworks methods and patterns for specific machines are utilised during construction.
  2. Optimum machine loads are monitored and maintained to suit prevailing conditions.
  3. Safe machine operating techniques and procedures are deployed to match terrain, site conditions and other operators or workers.
  4. Excavation, transport, dumping and compaction of material is completed in line with job sequence and endorsed industry practices.
  5. Vegetation is cleared according to enterprise guidelines and industry best practice.
  6. Neighbouring landholders, local authorities and interest groups are liaised with during the construction activity in according to enterprise guidelines and industry best practice.
  7. Documentation required by organisation and/or occupational health&safety guidelines, is completed clearly and accurately.
  8. Operational staff, clients and contractors are communicated with regularly throughout the construction activity to ensure smooth operation and progress.
Industry endorsed earthworks methods and patterns for specific machines are utilised during construction.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Optimum machine loads are monitored and maintained to suit prevailing conditions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safe machine operating techniques and procedures are deployed to match terrain, site conditions and other operators or workers.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavation, transport, dumping and compaction of material is completed in line with job sequence and endorsed industry practices.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Vegetation is cleared according to enterprise guidelines and industry best practice.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Neighbouring landholders, local authorities and interest groups are liaised with during the construction activity in according to enterprise guidelines and industry best practice.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation required by organisation and/or occupational health&safety guidelines, is completed clearly and accurately.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operational staff, clients and contractors are communicated with regularly throughout the construction activity to ensure smooth operation and progress.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply final finish to track

  1. Endorsed industry methods are utilised to surfaces to achieve job requirements.
  2. Site features and vegetation are retained in line with works plan/schedule.
  3. Site is cleared and debris removed in line with contractor policy.
Endorsed industry methods are utilised to surfaces to achieve job requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site features and vegetation are retained in line with works plan/schedule.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site is cleared and debris removed in line with contractor policy.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Competence requires evidence that access tracks have been appropriately constructed according to enterprise guidelines, relevant legislation and industry best practice. The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

select and prepare equipment

determine control points, required grades, and water crossing points and structures from field observations

construct tracks utilising industry endorsed earthworks methods and

patterns for specific machines

excavate, transport, dump and compact road material

finish track surface and clean worksite.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.

Required Skills and Knowledge

Required skills

prepare for access track construction

liaise with stakeholders

determine control points, required grades, and water crossing points and structures from field observations

operate appropriate machinery

form access tracks

apply final finish techniques to surfaces

use literacy skills to read, interpret and follow organisational policies and procedures, follow sequenced written instructions, record accurately and legible information collected and select and apply procedures for a range of tasks

use oral communication skills/language competence to fulfil the job role as specified by the organisation, including questioning techniques, active listening, clarifying information and consulting with supervisors as required

use numeracy skills to estimate, calculate and record routine workplace measures

use interpersonal skills to work with and relate to people from a range of cultural, social and religious backgrounds and with a range of physical and mental abilities.

Required knowledge

erosion and sediment control standards and principles

provisions of the relevant wild life, environmental, planning, ground water legislation

safety

erosion control and design principles

soils and soil formation

levels and levelling

earthmoving principles

principles for machine operation

total catchment issues

legal issues

environmental issues

country code

managing peak water flows

subsurface and surface drainage principles and systems.

Range Statement

The range statement relates to the unit of competency as a whole.

Machinery and activities may include:

all machinery, equipment and processes used in the construction of access tracks and clearing of vegetation.