The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare for installation
|
|
Required workplace information is interpreted and confirmed with supervisor. Completed |
Evidence:
|
Tools and equipment are prepared and used according to supervisors' instructions. Completed |
Evidence:
|
The quantity and quality of materials are checked to ensure they conform to the requirements of the job. Completed |
Evidence:
|
OHS hazards are identified, risks assessed and reported to the supervisor. Completed |
Evidence:
|
Personal Protective Equipment (PPE) and clothing is selected, used and maintained. Completed |
Evidence:
|
Plans for public risk protection are developed in liaison with the supervisor according to statutory obligations and enterprise guidelines. Completed |
Evidence:
|
The potential for environmental damage are assessed and measures are planned to avoid or control/minimise those impacts. Completed |
Evidence:
|
Set out the site for path construction
|
|
The location of the proposed path is marked out according to the site plan and contract documents or supervisors instructions. Completed |
Evidence:
|
The marked out area is checked with the supervisor for compliance with the site plan, contract documents and OHS requirements. Completed |
Evidence:
|
Public risk protection measures are put in place and used throughout the course of construction work. Completed |
Evidence:
|
Undertake ground preparation
|
|
The area is cleared of debris and excavated to base level and soil and waste materials are relocated or disposed of as directed. Completed |
Evidence:
|
Measures to avoid environmental impacts are put in place prior to commencement of work. Completed |
Evidence:
|
Base material is placed and compacted to the required finished level. Completed |
Evidence:
|
Work carried out conforms to site plan, contract documents and instructions. Completed |
Evidence:
|
Set out work is checked at regular intervals with supervisor. Completed |
Evidence:
|
3Edge restraints, where required, are installed according to site plan and instructions. Completed |
Evidence:
|
Install drainage structures as directed. Completed |
Evidence:
|
Site problems and discrepancies are reported to the supervisor. Completed |
Evidence:
|
Lay surface aggregate materials
|
|
Surface aggregate materials are spread over the area to the designated depth. Completed |
Evidence:
|
Material is screed to ensure consistent depth of materials. Completed |
Evidence:
|
Aggregate materials are levelled to the designated level and falls. Completed |
Evidence:
|
Aggregate materials are compacted using appropriate machinery. Completed |
Evidence:
|
Make good the site
|
|
Soil and waste material from the site is disposed of or recycled to ensure minimal impact on the environment. Completed |
Evidence:
|
Areas disturbed by installation works are reinstated according to good environmental practices. Completed |
Evidence:
|
All tools&equipment are cleaned and stored according to supervisors' instructions. Completed |
Evidence:
|