Evidence Guide: AHCLSC203A - Install aggregate paths

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCLSC203A - Install aggregate paths

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for installation

  1. Required workplace information is interpreted and confirmed with supervisor.
  2. Tools and equipment are prepared and used according to supervisors' instructions.
  3. The quantity and quality of materials are checked to ensure they conform to the requirements of the job.
  4. OHS hazards are identified, risks assessed and reported to the supervisor.
  5. Personal Protective Equipment (PPE) and clothing is selected, used and maintained.
  6. Plans for public risk protection are developed in liaison with the supervisor according to statutory obligations and enterprise guidelines.
  7. The potential for environmental damage are assessed and measures are planned to avoid or control/minimise those impacts.
Required workplace information is interpreted and confirmed with supervisor.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are prepared and used according to supervisors' instructions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The quantity and quality of materials are checked to ensure they conform to the requirements of the job.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

OHS hazards are identified, risks assessed and reported to the supervisor.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Personal Protective Equipment (PPE) and clothing is selected, used and maintained.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plans for public risk protection are developed in liaison with the supervisor according to statutory obligations and enterprise guidelines.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The potential for environmental damage are assessed and measures are planned to avoid or control/minimise those impacts.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out the site for path construction

  1. The location of the proposed path is marked out according to the site plan and contract documents or supervisors instructions.
  2. The marked out area is checked with the supervisor for compliance with the site plan, contract documents and OHS requirements.
  3. Public risk protection measures are put in place and used throughout the course of construction work.
The location of the proposed path is marked out according to the site plan and contract documents or supervisors instructions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The marked out area is checked with the supervisor for compliance with the site plan, contract documents and OHS requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Public risk protection measures are put in place and used throughout the course of construction work.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake ground preparation

  1. The area is cleared of debris and excavated to base level and soil and waste materials are relocated or disposed of as directed.
  2. Measures to avoid environmental impacts are put in place prior to commencement of work.
  3. Base material is placed and compacted to the required finished level.
  4. Work carried out conforms to site plan, contract documents and instructions.
  5. Set out work is checked at regular intervals with supervisor.
  6. 3Edge restraints, where required, are installed according to site plan and instructions.
  7. Install drainage structures as directed.
  8. Site problems and discrepancies are reported to the supervisor.
The area is cleared of debris and excavated to base level and soil and waste materials are relocated or disposed of as directed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measures to avoid environmental impacts are put in place prior to commencement of work.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Base material is placed and compacted to the required finished level.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work carried out conforms to site plan, contract documents and instructions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out work is checked at regular intervals with supervisor.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

3Edge restraints, where required, are installed according to site plan and instructions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install drainage structures as directed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site problems and discrepancies are reported to the supervisor.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay surface aggregate materials

  1. Surface aggregate materials are spread over the area to the designated depth.
  2. Material is screed to ensure consistent depth of materials.
  3. Aggregate materials are levelled to the designated level and falls.
  4. Aggregate materials are compacted using appropriate machinery.
Surface aggregate materials are spread over the area to the designated depth.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Material is screed to ensure consistent depth of materials.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Aggregate materials are levelled to the designated level and falls.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Aggregate materials are compacted using appropriate machinery.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make good the site

  1. Soil and waste material from the site is disposed of or recycled to ensure minimal impact on the environment.
  2. Areas disturbed by installation works are reinstated according to good environmental practices.
  3. All tools&equipment are cleaned and stored according to supervisors' instructions.
Soil and waste material from the site is disposed of or recycled to ensure minimal impact on the environment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Areas disturbed by installation works are reinstated according to good environmental practices.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All tools&equipment are cleaned and stored according to supervisors' instructions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

set out the path on a site

undertake ground preparation for an aggregate path

construct the aggregate path and supporting structures

minimise the impact of the aggregate path on the surrounding natural area

dispose of waste materials according to requirements.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.

Required Skills and Knowledge

Required skills

plan and prepare for installation and site safety

set out the site for path construction

undertake ground preparation

lay surface aggregate materials

make good the site

use literacy skills to follow sequenced written instructions and record information accurately and legibly

use oral communication skills/language competence to fulfil the job role as specified by the organisation including questioning, active listening, asking for clarification and seeking advice from supervisor

use numeracy skills to estimate, calculate and record routine workplace measures

use interpersonal skills to relate to people from a range of social, cultural and ethnic backgrounds and with a range of physical and mental abilities.

Required knowledge

OHS responsibilities of employees

OHS regulations regarding the erection of signs and barriers around the work area and responsibilities to the public

the environmental impact of soil disturbance when preparing the site and the environmental effects of altering water flow when installing paths

setting out site for path construction

reading of plans and contract documents

different base and aggregate materials and their performance

tools and equipment used for installing paths

methods of disposing of soil and waste materials in order to minimise damage to the environment

machinery used in path construction

ordering and estimating materials.

Range Statement

The range statement relates to the unit of competency as a whole.

Aggregate paths may include:

all types of aggregate paths used in landscaping.