Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCLSC302 - Construct landscape features using concrete

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare work

  1. Interpret plans and specifications
  2. Check the quantity and quality of materials
  3. Select tools and equipment and check for serviceability
  4. Identify hazards, assess risks and implement controls
  5. Select and use personal protective equipment (PPE)
  6. Identify and ameliorate environmental impacts of proposed concrete works
Interpret plans and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check the quantity and quality of materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select tools and equipment and check for serviceability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify hazards, assess risks and implement controls

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and use personal protective equipment (PPE)

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and ameliorate environmental impacts of proposed concrete works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out and prepare the site

  1. Determine and locate services
  2. Mark out the position of the structure or feature according to plans
  3. Establish profiles to conform to the nominated tolerances
  4. Prepare subsoil by removing all debris, vegetable matter and topsoil to provide a solid foundation for concrete
  5. Install drainage systems according to plans and specifications
  6. Install form work to the site in a manner that will ensure it remains rigid during concrete pouring operations
  7. Place and compact sub-base material to the required finished levels
  8. Complete preparation of the site according to the type of structure or feature to be constructed
  9. Place reinforcement as designated in plans and specifications
Determine and locate services

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mark out the position of the structure or feature according to plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish profiles to conform to the nominated tolerances

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare subsoil by removing all debris, vegetable matter and topsoil to provide a solid foundation for concrete

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install drainage systems according to plans and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install form work to the site in a manner that will ensure it remains rigid during concrete pouring operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place and compact sub-base material to the required finished levels

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete preparation of the site according to the type of structure or feature to be constructed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place reinforcement as designated in plans and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mix and pour concrete

  1. Determine proportions for concrete mix according to the strength requirements of the project
  2. Determine the volume of dry materials necessary to produce final concrete mix
  3. Mix together all dry ingredients and required additives to ensure a thorough blending of all materials is achieved
  4. Introduce sufficient water to produce a concrete mix to the required consistency
  5. Pour concrete to designated levels in a manner to avoid segregation of materials
  6. Consolidate concrete using an approved vibration method
Determine proportions for concrete mix according to the strength requirements of the project

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine the volume of dry materials necessary to produce final concrete mix

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mix together all dry ingredients and required additives to ensure a thorough blending of all materials is achieved

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Introduce sufficient water to produce a concrete mix to the required consistency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pour concrete to designated levels in a manner to avoid segregation of materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Consolidate concrete using an approved vibration method

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finish concrete

  1. Screed concrete to the desired finished level
  2. Trowel surface to desired finish
  3. Finish concrete off according to plans and specifications
Screed concrete to the desired finished level

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Trowel surface to desired finish

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finish concrete off according to plans and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check quality of work and clean-up site

  1. Inspect the quality of finished works to ensure the required standard has been achieved
  2. Remove and clean form work to allow reuse
  3. Ensure all clean-up works minimise impact to the environment
  4. Clean, maintain and store tools and equipment
Inspect the quality of finished works to ensure the required standard has been achieved

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove and clean form work to allow reuse

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure all clean-up works minimise impact to the environment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, maintain and store tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan and prepare work

1.1 Interpret plans and specifications

1.2 Check the quantity and quality of materials

1.3 Select tools and equipment and check for serviceability

1.4 Identify hazards, assess risks and implement controls

1.5 Select and use personal protective equipment (PPE)

1.6 Identify and ameliorate environmental impacts of proposed concrete works

2. Set out and prepare the site

2.1 Determine and locate services

2.2 Mark out the position of the structure or feature according to plans

2.3 Establish profiles to conform to the nominated tolerances

2.4 Prepare subsoil by removing all debris, vegetable matter and topsoil to provide a solid foundation for concrete

2.5 Install drainage systems according to plans and specifications

2.6 Install form work to the site in a manner that will ensure it remains rigid during concrete pouring operations

2.7 Place and compact sub-base material to the required finished levels

2.8 Complete preparation of the site according to the type of structure or feature to be constructed

2.9 Place reinforcement as designated in plans and specifications

3. Mix and pour concrete

3.1 Determine proportions for concrete mix according to the strength requirements of the project

3.2 Determine the volume of dry materials necessary to produce final concrete mix

3.3 Mix together all dry ingredients and required additives to ensure a thorough blending of all materials is achieved

3.4 Introduce sufficient water to produce a concrete mix to the required consistency

3.5 Pour concrete to designated levels in a manner to avoid segregation of materials

3.6 Consolidate concrete using an approved vibration method

4. Finish concrete

4.1 Screed concrete to the desired finished level

4.2 Trowel surface to desired finish

4.3 Finish concrete off according to plans and specifications

5. Check quality of work and clean-up site

5.1 Inspect the quality of finished works to ensure the required standard has been achieved

5.2 Remove and clean form work to allow reuse

5.3 Ensure all clean-up works minimise impact to the environment

5.4 Clean, maintain and store tools and equipment

Required Skills and Knowledge

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan and prepare work

1.1 Interpret plans and specifications

1.2 Check the quantity and quality of materials

1.3 Select tools and equipment and check for serviceability

1.4 Identify hazards, assess risks and implement controls

1.5 Select and use personal protective equipment (PPE)

1.6 Identify and ameliorate environmental impacts of proposed concrete works

2. Set out and prepare the site

2.1 Determine and locate services

2.2 Mark out the position of the structure or feature according to plans

2.3 Establish profiles to conform to the nominated tolerances

2.4 Prepare subsoil by removing all debris, vegetable matter and topsoil to provide a solid foundation for concrete

2.5 Install drainage systems according to plans and specifications

2.6 Install form work to the site in a manner that will ensure it remains rigid during concrete pouring operations

2.7 Place and compact sub-base material to the required finished levels

2.8 Complete preparation of the site according to the type of structure or feature to be constructed

2.9 Place reinforcement as designated in plans and specifications

3. Mix and pour concrete

3.1 Determine proportions for concrete mix according to the strength requirements of the project

3.2 Determine the volume of dry materials necessary to produce final concrete mix

3.3 Mix together all dry ingredients and required additives to ensure a thorough blending of all materials is achieved

3.4 Introduce sufficient water to produce a concrete mix to the required consistency

3.5 Pour concrete to designated levels in a manner to avoid segregation of materials

3.6 Consolidate concrete using an approved vibration method

4. Finish concrete

4.1 Screed concrete to the desired finished level

4.2 Trowel surface to desired finish

4.3 Finish concrete off according to plans and specifications

5. Check quality of work and clean-up site

5.1 Inspect the quality of finished works to ensure the required standard has been achieved

5.2 Remove and clean form work to allow reuse

5.3 Ensure all clean-up works minimise impact to the environment

5.4 Clean, maintain and store tools and equipment

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

interpret site plans and specifications

set out and prepare a site for concrete

measure and construct profiles

establish levels using levelling equipment

place reinforcement

pour, consolidate and finish concrete

The candidate must demonstrate knowledge of:

the principles and practices of constructing concrete landscape features

industry standards in relation to reinforcing and consolidating concrete

MPA testing theory and what affects MPA specifications in a concrete mix

sub-base and sub-grade materials and preparation

the comparative environmental implications associated with soil removal and the placement of concrete

Range Statement