The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare work
|
|
Plans and specifications are interpreted. Completed |
Evidence:
|
The quantity and quality of materials are checked for conformation to design drawings and specifications. Completed |
Evidence:
|
Tools and equipment are selected and checked for serviceability according to industry practice. Completed |
Evidence:
|
Personal Protective Equipment (PPE) is selected, used and maintained according to procedures. Completed |
Evidence:
|
Occupational Health and Safety (OHS) hazards are identified, risks assessed, and controls are implemented. Completed |
Evidence:
|
Position the structure and prepare the profile and footings
|
|
Services are identified and located from site plans. Completed |
Evidence:
|
The position of the structure is marked out according to design drawings and specifications. Completed |
Evidence:
|
Profiles are established to conform to the tolerances nominated within the design drawings and specifications. Completed |
Evidence:
|
Footings are excavated and prepared according to the type of structure to be erected. Completed |
Evidence:
|
Prepare and cut timber components
|
|
Components are prepared for assembly to the requirements contained in the design drawings and specifications. Completed |
Evidence:
|
The length of components and the positions of cuts and joints are marked out with a pencil according to designated specifications in design drawings. Completed |
Evidence:
|
Cutting tools are selected, used and maintained according to manufactures recommendations and OHS specifications. Completed |
Evidence:
|
Components are cut, checked out and drilled accurately in preparation for joining and assembly. Completed |
Evidence:
|
Assemble and erect structure
|
|
Timber components are fixed, joined or assembled into position and fixed into place according to design drawings and specifications. Completed |
Evidence:
|
Remaining components are installed and fixed into position according to design drawings and specifications. Completed |
Evidence:
|
Structure is finished off to ensure all components are secure and complete. Completed |
Evidence:
|
Coatings are applied according to specifications and manufacturer's recommendations. Completed |
Evidence:
|
Check quality of work and clean up site
|
|
Quality of finished works is checked for compliance with design drawings and specifications. Completed |
Evidence:
|
Debris is cleaned from structure and site according to industry practice. Completed |
Evidence:
|