NTISthis.com

Evidence Guide: AHCLSC305 - Construct stone structures and features

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCLSC305 - Construct stone structures and features

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare work

  1. Interpret plans and specifications
  2. Check the quantity and quality of materials to ensure they conform to design drawings and specifications
  3. Select tools and equipment and check for serviceability
  4. Identify workplace health and safety hazards, assess risks and implement controls
  5. Identify and report environmental implications of erecting stone structures
Interpret plans and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check the quantity and quality of materials to ensure they conform to design drawings and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select tools and equipment and check for serviceability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify workplace health and safety hazards, assess risks and implement controls

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and report environmental implications of erecting stone structures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out and prepare the site

  1. Locate services from site plans
  2. Mark out the position of the structure or feature according to design drawings and specifications
  3. Prepare base by removing all debris, vegetable matter and topsoil to provide a solid foundation for construction
  4. Install drainage systems according to design drawings and specifications
  5. Place and compact sub-base material to the finished levels
Locate services from site plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mark out the position of the structure or feature according to design drawings and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare base by removing all debris, vegetable matter and topsoil to provide a solid foundation for construction

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install drainage systems according to design drawings and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place and compact sub-base material to the finished levels

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct structure or feature

  1. Mix mortar and add bonding and colouring agents and other admixes as required, in accordance with specifications
  2. Lay damp proofing and base course of stone work according to design drawings and specifications
  3. Lay courses of stone work using designated bond/s in a manner that will ensure the viability and stability of the structure and according to design drawings and specifications
Mix mortar and add bonding and colouring agents and other admixes as required, in accordance with specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay damp proofing and base course of stone work according to design drawings and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay courses of stone work using designated bond/s in a manner that will ensure the viability and stability of the structure and according to design drawings and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install stone paving

  1. Set out and prepare area to be paved according to the site plan
  2. Excavate the area to shape, depth and dimensions to sub-base level
  3. Trim the sub base to the designated level and falls and place and compact base material to the finished level
  4. Spread bedding material over the area and level to the designated level and falls
  5. Place stone and fit to accurately fill gaps in the pattern within tolerances nominated within the site plan
  6. Install edge constraints as required by the site plan
Set out and prepare area to be paved according to the site plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavate the area to shape, depth and dimensions to sub-base level

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Trim the sub base to the designated level and falls and place and compact base material to the finished level

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Spread bedding material over the area and level to the designated level and falls

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place stone and fit to accurately fill gaps in the pattern within tolerances nominated within the site plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install edge constraints as required by the site plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check quality of work and clean-up site

  1. Inspect finished works to ensure the standard of the finished structure or feature is in accordance with design drawings and specifications
  2. Clean stone work surfaces in an environmentally safe and sensitive manner
  3. Clean and store tools and equipment
Inspect finished works to ensure the standard of the finished structure or feature is in accordance with design drawings and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean stone work surfaces in an environmentally safe and sensitive manner

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean and store tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan and prepare work

1.1 Interpret plans and specifications

1.2 Check the quantity and quality of materials to ensure they conform to design drawings and specifications

1.3 Select tools and equipment and check for serviceability

1.4 Identify workplace health and safety hazards, assess risks and implement controls

1.5 Identify and report environmental implications of erecting stone structures

2. Set out and prepare the site

2.1 Locate services from site plans

2.2 Mark out the position of the structure or feature according to design drawings and specifications

2.3 Prepare base by removing all debris, vegetable matter and topsoil to provide a solid foundation for construction

2.4 Install drainage systems according to design drawings and specifications

2.5 Place and compact sub-base material to the finished levels

3. Construct structure or feature

3.1 Mix mortar and add bonding and colouring agents and other admixes as required, in accordance with specifications

3.2 Lay damp proofing and base course of stone work according to design drawings and specifications

3.3 Lay courses of stone work using designated bond/s in a manner that will ensure the viability and stability of the structure and according to design drawings and specifications

4. Install stone paving

4.1 Set out and prepare area to be paved according to the site plan

4.2 Excavate the area to shape, depth and dimensions to sub-base level

4.3 Trim the sub base to the designated level and falls and place and compact base material to the finished level

4.4 Spread bedding material over the area and level to the designated level and falls

4.5 Place stone and fit to accurately fill gaps in the pattern within tolerances nominated within the site plan

4.6 Install edge constraints as required by the site plan

5. Check quality of work and clean-up site

5.1 Inspect finished works to ensure the standard of the finished structure or feature is in accordance with design drawings and specifications

5.2 Clean stone work surfaces in an environmentally safe and sensitive manner

5.3 Clean and store tools and equipment

Required Skills and Knowledge

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan and prepare work

1.1 Interpret plans and specifications

1.2 Check the quantity and quality of materials to ensure they conform to design drawings and specifications

1.3 Select tools and equipment and check for serviceability

1.4 Identify workplace health and safety hazards, assess risks and implement controls

1.5 Identify and report environmental implications of erecting stone structures

2. Set out and prepare the site

2.1 Locate services from site plans

2.2 Mark out the position of the structure or feature according to design drawings and specifications

2.3 Prepare base by removing all debris, vegetable matter and topsoil to provide a solid foundation for construction

2.4 Install drainage systems according to design drawings and specifications

2.5 Place and compact sub-base material to the finished levels

3. Construct structure or feature

3.1 Mix mortar and add bonding and colouring agents and other admixes as required, in accordance with specifications

3.2 Lay damp proofing and base course of stone work according to design drawings and specifications

3.3 Lay courses of stone work using designated bond/s in a manner that will ensure the viability and stability of the structure and according to design drawings and specifications

4. Install stone paving

4.1 Set out and prepare area to be paved according to the site plan

4.2 Excavate the area to shape, depth and dimensions to sub-base level

4.3 Trim the sub base to the designated level and falls and place and compact base material to the finished level

4.4 Spread bedding material over the area and level to the designated level and falls

4.5 Place stone and fit to accurately fill gaps in the pattern within tolerances nominated within the site plan

4.6 Install edge constraints as required by the site plan

5. Check quality of work and clean-up site

5.1 Inspect finished works to ensure the standard of the finished structure or feature is in accordance with design drawings and specifications

5.2 Clean stone work surfaces in an environmentally safe and sensitive manner

5.3 Clean and store tools and equipment

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

interpret plans and specifications

prepare the site and install drainage systems

set out base for paving

use levelling equipment

construct stone work with correct mortar ratio

The candidate must demonstrate knowledge of:

principles and practices for constructing stone structures and features

comparative environmental implications associated with soil disturbance and the establishment of drainage systems

bonding and colouring agents and other admix components of mortar used in the construction of stone structures and features

stone structure construction

Range Statement