NTISthis.com

Evidence Guide: AHCLSC306A - Implement a paving project

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCLSC306A - Implement a paving project

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for paving project

  1. Requirements of the paving project are clarified with client/supervisor and enterprise guidelines.
  2. Equipment and material resource requirements are identified according to the scope of the construction work and the supervisor's instructions.
  3. The environmental implications of the proposed work are identified.
  4. Occupational Health and Safety (OHS) hazards are identified, risks assessed and controls implemented.
  5. Personal protective equipment (PPE) is selected, used, maintained and stored.
  6. Delivery of materials to site is organised according to workplace priorities.
Requirements of the paving project are clarified with client/supervisor and enterprise guidelines.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment and material resource requirements are identified according to the scope of the construction work and the supervisor's instructions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The environmental implications of the proposed work are identified.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Occupational Health and Safety (OHS) hazards are identified, risks assessed and controls implemented.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Personal protective equipment (PPE) is selected, used, maintained and stored.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Delivery of materials to site is organised according to workplace priorities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out and prepare the site

  1. Site and hazards are identified, risks assessed and suitable controls implemented.
  2. Site bunting is erected, pedestrian access is controlled, and safety signage is placed where appropriate.
  3. Services are determined and located from site plans.
  4. Provision for irrigation lines to cross paved areas is made, where applicable.
  5. The paving pattern is marked out according to plans and specifications.
  6. Sub-base material is placed and compacted to the required finished levels.
  7. Surface drainage is incorporated according to design drawings and specifications.
Site and hazards are identified, risks assessed and suitable controls implemented.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site bunting is erected, pedestrian access is controlled, and safety signage is placed where appropriate.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Services are determined and located from site plans.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Provision for irrigation lines to cross paved areas is made, where applicable.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The paving pattern is marked out according to plans and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sub-base material is placed and compacted to the required finished levels.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Surface drainage is incorporated according to design drawings and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate paving project installation

  1. Paving project is constructed according to plan.
  2. Appropriate drainage is installed according to plan.
  3. Tools, equipment and machinery are used safely according to enterprise operating procedures and OHS requirements.
Paving project is constructed according to plan.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate drainage is installed according to plan.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and machinery are used safely according to enterprise operating procedures and OHS requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check quality of work and clean up site

  1. Quality of finished works is inspected to ensure the standard of the finished project is in accordance with design drawings and specifications.
  2. Paved surfaces are cleaned down in an environmentally safe and sensitive manner.
  3. Tools and equipment are cleaned and stored according to enterprise guidelines.
Quality of finished works is inspected to ensure the standard of the finished project is in accordance with design drawings and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Paved surfaces are cleaned down in an environmentally safe and sensitive manner.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are cleaned and stored according to enterprise guidelines.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

determine project requirements from plans

organise work and use tools and equipment for paving project

conduct a site hazard identification and risk control assessment

set out and prepare paving site according to plan specifications

implement a paving project

clean up, store and maintain associated tools, machinery and equipment.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.

Required Skills and Knowledge

Required skills

calculate material and resource requirements

conduct a site hazard identification and risk control assessment

coordinate a team to achieve optimum performance

use literacy skills to read, interpret and follow organisational policies and procedures, follow sequenced written instructions, record information collected accurately and legibly and select and apply procedures for a range of tasks

use oral communication skills/language competence to fulfil the job role as specified by the organisation, including questioning techniques, active listening, clarifying information and consulting with supervisors as required

use interpersonal skills to work with and relate to people from a range of cultural, social and religious backgrounds and with a range of physical and mental abilities.

Required knowledge

landscape paving materials

landscape paving techniques

set-out techniques

work schedule programming

possible causes of disruption to work activities and their effect on quality and time schedules

methods and practices for maintaining and repairing paved areas

the range, use and availability of required materials, equipment and machinery

hazard identification and risk control assessment

OHS legislative requirements and codes of practice.

Range Statement

The range statement relates to the unit of competency as a whole.

Implementation may include:

paving plans