NTISthis.com

Evidence Guide: AHCLSC307A - Implement a retaining wall project

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCLSC307A - Implement a retaining wall project

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for retaining wall project

  1. Requirements of the retaining wall project are clarified with client/supervisor.
  2. Equipment and material resource requirements are identified according to the scope of the construction work.
  3. The environmental implications of the proposed work are identified.
  4. Occupational Health and Safety (OHS) hazards are identified, risks assessed and reported to the supervisor.
  5. Personal Protective Equipment (PPE) is selected, used and maintained according to procedures
  6. Delivery of materials to site is organised according to workplace priorities.
Requirements of the retaining wall project are clarified with client/supervisor.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment and material resource requirements are identified according to the scope of the construction work.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The environmental implications of the proposed work are identified.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Occupational Health and Safety (OHS) hazards are identified, risks assessed and reported to the supervisor.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Personal Protective Equipment (PPE) is selected, used and maintained according to procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Delivery of materials to site is organised according to workplace priorities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mark out site for retaining wall

  1. Site bunting is erected and safety signage is placed where appropriate.
  2. Services are determined and located from site plans.
  3. The position of the retaining wall is marked out according to site and construction plans.
  4. The location and depth of excavations are determined from site and construction plans.
  5. Profiles are established to conform to the tolerances designated by the construction plans.
  6. Survey benchmarks are established.
Site bunting is erected and safety signage is placed where appropriate.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Services are determined and located from site plans.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The position of the retaining wall is marked out according to site and construction plans.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The location and depth of excavations are determined from site and construction plans.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Profiles are established to conform to the tolerances designated by the construction plans.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Survey benchmarks are established.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct retaining wall

  1. Retaining wall components are assembled /installed according to plan specifications.
  2. Appropriate drainage is installed according to plan.
  3. Tools, equipment and machinery are used safely in accordance with enterprise safe operating procedures and OHS requirements.
Retaining wall components are assembled /installed according to plan specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate drainage is installed according to plan.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and machinery are used safely in accordance with enterprise safe operating procedures and OHS requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check quality of work and clean up site

  1. Quality of finished works is inspected to ensure the standard of the finished project is in accordance with design drawings and specifications.
  2. The work site is cleaned down in an environmentally safe and sensitive manner
  3. Tools and equipment are cleaned and stored according to enterprise guidelines.
Quality of finished works is inspected to ensure the standard of the finished project is in accordance with design drawings and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The work site is cleaned down in an environmentally safe and sensitive manner

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are cleaned and stored according to enterprise guidelines.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

set out and prepare site according to plan specifications

establish survey benchmarks

excavate and profile soil levels

install and assemble components of a retaining wall

use tools and equipment for retaining wall projects

verify completed works meet the design plan and specifications.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.

Required Skills and Knowledge

Required skills

read and interpret documentation associated with retaining wall projects

calculate material and resource requirements

establish survey benchmarks

install and assemble components of a retaining wall

coordinate a team to achieve optimum performance

document results clearly and concisely

identify hazards and assess risk

use oral communication skills/language competence to fulfil the job role as specified by the organisation, including questioning techniques, active listening, clarifying information and consulting with supervisors as required

use numeracy skills to estimate, calculate and record routine workplace measures

use interpersonal skills to work with and relate to people from a range of cultural, social and religious backgrounds and with a range of physical and mental abilities.

Required knowledge

landscape retaining wall materials

landscape retaining wall construction techniques

set out techniques

work schedule programming

possible causes of disruption to work activities and their effect on quality and time schedules

methods and practices for maintaining and repairing retaining walls

the range, use and availability of materials, equipment and machinery that may be required for the project

OHS issues, legislative requirements and codes of practice

state based licensing

local council regulations

WorkCover regulations.

Range Statement

The range statement relates to the unit of competency as a whole.

Implementation may include:

materials

tools

equipment

machinery and techniques used to construct retaining walls.