The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare work
|
|
Interpret plans and specifications Completed |
Evidence:
|
Check the quantity and quality of materials Completed |
Evidence:
|
Select tools and equipment and check for serviceability Completed |
Evidence:
|
Identify work health and safety hazards, assess risks and implement controls Completed |
Evidence:
|
Select and use personal protective equipment (PPE) Completed |
Evidence:
|
Identify the environmental implications of constructing water features Completed |
Evidence:
|
Set out and prepare the site
|
|
Locate services as specified Completed |
Evidence:
|
Determine the exact location and depth of excavations and mark out accordingly Completed |
Evidence:
|
Excavate site to the shape, depth and dimensions as marked out Completed |
Evidence:
|
Construct drainage systems as specified Completed |
Evidence:
|
Place and compact bedding material to the required finished levels Completed |
Evidence:
|
Sort and stockpile soil and waste material ready for removal, reuse or recycling Completed |
Evidence:
|
Install water feature and accessories
|
|
Install the waterproof membrane, prefabricated shell or formed 'in situ' feature as specified Completed |
Evidence:
|
Install all accessories to the feature as specified with consideration to safety issues Completed |
Evidence:
|
Fill the feature with water, test for leaks and repair accordingly Completed |
Evidence:
|
Treat water to remove or neutralise contaminants resulting from excavation and installation work Completed |
Evidence:
|
Check quality of work and clean-up site
|
|
Check any mechanical features and adjust to ensure correct operation Completed |
Evidence:
|
Clean debris from structure and site Completed |
Evidence:
|
Dispose of soil and waste material in an environmentally safe and sensitive manner Completed |
Evidence:
|
Clean, maintain and store tools and equipment Completed |
Evidence:
|
Inspect quality of finished works to ensure standard of the finished works is in accordance with drawings and specifications Completed |
Evidence:
|