The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare work
|
|
Plans and specifications are interpreted and clarified with the supervisor. Completed |
Evidence:
|
The quantity and quality of materials are checked to ensure they conform to design drawings and specifications. Completed |
Evidence:
|
Tools and equipment are selected and checked for serviceability according to enterprise guidelines. Completed |
Evidence:
|
Occupational Health and Safety (OHS) hazards are identified, risks assessed and controls implemented. Completed |
Evidence:
|
Environmental implications of constructing concrete structures are identified and reported to the supervisor. Completed |
Evidence:
|
Set out and prepare the site
|
|
Services are determined and located from site plans. Completed |
Evidence:
|
The exact location and depth of excavations is determined from design drawings and specifications, and marked out accordingly. Completed |
Evidence:
|
Site is excavated to the shape, depth and dimensions as marked out. Completed |
Evidence:
|
Drainage systems are constructed according to design drawings and specifications. Completed |
Evidence:
|
Bedding material is placed and compacted to the required finished levels. Completed |
Evidence:
|
Soil and waste material is sorted and stockpiled ready for removal, reuse or recycling. Completed |
Evidence:
|
Install water feature and accessories
|
|
A waterproof membrane, prefabricated shell or formed 'in situ' feature is installed according to design drawings, specifications and/or manufacturer's instructions. Completed |
Evidence:
|
All accessories to the feature are installed according to design drawings, specifications and/or manufacturer's instructions, and with due consideration to safety issues. Completed |
Evidence:
|
The feature is filled with water, tested for leaks and repaired accordingly. Completed |
Evidence:
|
Water is treated to remove or neutralise contaminants resulting from excavation and installation work. Completed |
Evidence:
|
Check quality of work and clean up site
|
|
Any mechanical features are checked and adjusted to ensure they operate according to manufacturer's specifications. Completed |
Evidence:
|
Quality of finished works is inspected to ensure the standard of the finished feature is in accordance with design drawings and specifications. Completed |
Evidence:
|
Debris is cleaned from feature and site according to enterprise guidelines. Completed |
Evidence:
|
Soil and waste material is disposed of in an environmentally aware and sensitive manner. Completed |
Evidence:
|
All tools and equipment are cleaned and stored according to enterprise guidelines. Completed |
Evidence:
|