NTISthis.com

Evidence Guide: AHCLSC401 - Supervise landscape project works

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCLSC401 - Supervise landscape project works

What evidence can you provide to prove your understanding of each of the following citeria?

Identify scope of landscape project works

  1. Identify the nature of the landscape project work and extent of responsibilities and check against landscape documentation
  2. Identify personnel and other resources required to undertake landscape works according to scope of project
  3. Develop a work program to ensure that project outcomes are reached within designated time lines
  4. Identify workplace health and safety hazards, assess risks and implement controls
  5. Identify environmental impact of proposed landscape project works
  6. Select and use personal protective equipment (PPE)
Identify the nature of the landscape project work and extent of responsibilities and check against landscape documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify personnel and other resources required to undertake landscape works according to scope of project

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop a work program to ensure that project outcomes are reached within designated time lines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify workplace health and safety hazards, assess risks and implement controls

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify environmental impact of proposed landscape project works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and use personal protective equipment (PPE)

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate the supply of materials and equipment

  1. Calculate material quantities and equipment requirements to ensure an ongoing work program is maintained
  2. Order material and equipment, check for quantity and quality and store as required
  3. Convey and confirm any specific delivery instructions with suppliers to ensure materials are delivered according to work program
  4. Send any rejected material back to supplier and re-order
Calculate material quantities and equipment requirements to ensure an ongoing work program is maintained

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Order material and equipment, check for quantity and quality and store as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Convey and confirm any specific delivery instructions with suppliers to ensure materials are delivered according to work program

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Send any rejected material back to supplier and re-order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor project works

  1. Monitor work program and adjust to ensure the site is developed and that project outcomes are reached within designated timelines
  2. Identify, record and report variations to the work program, issues likely to cause delays, and contingencies beyond the scope of the project
  3. Monitor the work site to ensure it remains in a clean, tidy and safe condition throughout and on completion of works
Monitor work program and adjust to ensure the site is developed and that project outcomes are reached within designated timelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, record and report variations to the work program, issues likely to cause delays, and contingencies beyond the scope of the project

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor the work site to ensure it remains in a clean, tidy and safe condition throughout and on completion of works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete site works

  1. Inspect site prior to practical completion to ensure all works have been undertaken according to client needs and relevant documentation
  2. Note any works not complying and rectify
  3. Produce a completed landscape project works report for client
Inspect site prior to practical completion to ensure all works have been undertaken according to client needs and relevant documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Note any works not complying and rectify

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Produce a completed landscape project works report for client

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Identify scope of landscape project works

1.1 Identify the nature of the landscape project work and extent of responsibilities and check against landscape documentation

1.2 Identify personnel and other resources required to undertake landscape works according to scope of project

1.3 Develop a work program to ensure that project outcomes are reached within designated time lines

1.4 Identify workplace health and safety hazards, assess risks and implement controls

1.5 Identify environmental impact of proposed landscape project works

1.6 Select and use personal protective equipment (PPE)

2. Coordinate the supply of materials and equipment

2.1 Calculate material quantities and equipment requirements to ensure an ongoing work program is maintained

2.2 Order material and equipment, check for quantity and quality and store as required

2.3 Convey and confirm any specific delivery instructions with suppliers to ensure materials are delivered according to work program

2.4 Send any rejected material back to supplier and re-order

3. Monitor project works

3.1 Monitor work program and adjust to ensure the site is developed and that project outcomes are reached within designated timelines

3.2 Identify, record and report variations to the work program, issues likely to cause delays, and contingencies beyond the scope of the project

3.3 Monitor the work site to ensure it remains in a clean, tidy and safe condition throughout and on completion of works

4. Complete site works

4.1 Inspect site prior to practical completion to ensure all works have been undertaken according to client needs and relevant documentation

4.2 Note any works not complying and rectify

4.3 Produce a completed landscape project works report for client

Required Skills and Knowledge

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Identify scope of landscape project works

1.1 Identify the nature of the landscape project work and extent of responsibilities and check against landscape documentation

1.2 Identify personnel and other resources required to undertake landscape works according to scope of project

1.3 Develop a work program to ensure that project outcomes are reached within designated time lines

1.4 Identify workplace health and safety hazards, assess risks and implement controls

1.5 Identify environmental impact of proposed landscape project works

1.6 Select and use personal protective equipment (PPE)

2. Coordinate the supply of materials and equipment

2.1 Calculate material quantities and equipment requirements to ensure an ongoing work program is maintained

2.2 Order material and equipment, check for quantity and quality and store as required

2.3 Convey and confirm any specific delivery instructions with suppliers to ensure materials are delivered according to work program

2.4 Send any rejected material back to supplier and re-order

3. Monitor project works

3.1 Monitor work program and adjust to ensure the site is developed and that project outcomes are reached within designated timelines

3.2 Identify, record and report variations to the work program, issues likely to cause delays, and contingencies beyond the scope of the project

3.3 Monitor the work site to ensure it remains in a clean, tidy and safe condition throughout and on completion of works

4. Complete site works

4.1 Inspect site prior to practical completion to ensure all works have been undertaken according to client needs and relevant documentation

4.2 Note any works not complying and rectify

4.3 Produce a completed landscape project works report for client

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

identify scope of landscape project work

identify personnel and other resource requirements

develop a project plan

calculate materials and equipment

control the quality of supplied materials

monitor, record and report on progress of a works program

complete a landscape works report

liaise with clients

The candidate must demonstrate knowledge of:

the principles and practices of supervising landscape works

causes of disruption to work programs and their effect on quality and time schedules

environmental impacts of landscape works

hazard identification, assessment and control

how to conduct site assessment and work site establishment

issuing of instructions, variations and requests for information

format, frequency and documentation for job reporting requirements

legislative requirements and legal responsibilities

contracts, plans and specifications for project documentation

supervision techniques of staff and sub-contractors

Range Statement