The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Determine cooling and storage system requirements
|
|
Determine available cooling water supply quantity and test the quality of the water supply Completed |
Evidence:
|
Ensure the planned milk cooling and storage systems meet industry standards and match enterprise and herd needs Completed |
Evidence:
|
Determine and record design considerations including appropriate siting of components Completed |
Evidence:
|
Determine work health and safety hazards, assess risks, implement controls and report as required Completed |
Evidence:
|
Determine milk pre-cooling requirements
|
|
Measure and record maximum peak flow of milk delivery Completed |
Evidence:
|
Check cooling water temperatures and quality against design specifications Completed |
Evidence:
|
Compare available milk cooling equipment with design requirements and select suitable equipment Completed |
Evidence:
|
Determine work health and safety and human health regulatory requirements and establish compliance targets Completed |
Evidence:
|
Determine water cooling system requirements in line with planned equipment and available resources Completed |
Evidence:
|
Determine milk storage requirements
|
|
Determine enterprise milk production levels and projected production increases Completed |
Evidence:
|
Establish milk entry temperature and other critical design considerations in consultation with the enterprise and from available data Completed |
Evidence:
|
Select a suitable milk vat to meet shed production requirements and bulk milk collection routines Completed |
Evidence:
|
Install milk cooling and storage equipment
|
|
Install plate cooler and other components of the pre-cooling system in line with established system design and industry standards Completed |
Evidence:
|
Install vat and refrigeration equipment to meet design specifications Completed |
Evidence:
|
Complete commissioning tests to ensure the operation of all elements of the cooling and storage systems comply with performance targets and milk supply quality standards Completed |
Evidence:
|
Operate and maintain milk cooling and storage equipment
|
|
Complete routine maintenance program requirements in line with manufacturers' recommendations Completed |
Evidence:
|
Determine repair and service requirements, including rectification of operational faults, as part of maintenance routines Completed |
Evidence:
|