Evidence Guide: AHCPER404 - Plan and implement permaculture works

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCPER404 - Plan and implement permaculture works

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for permaculture works

  1. Confirm and verify client preferences and contract requirements
  2. Verify scope of works
  3. Verify specific statutory obligations
  4. Conduct a site visit to confirm details of permaculture works plan
  5. Identify safety hazards and work health and safety obligations associated with the permaculture works
  6. Verify the availability, quantity and costs of plants and other materials listed in the project schedules
  7. Verify resources and tools and equipment required for permaculture works
  8. Confirm availability with suppliers, contractors and appropriate personnel
  9. Verify site access and establishment issues and follow plan for environmental impacts
Confirm and verify client preferences and contract requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify scope of works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify specific statutory obligations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct a site visit to confirm details of permaculture works plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify safety hazards and work health and safety obligations associated with the permaculture works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify the availability, quantity and costs of plants and other materials listed in the project schedules

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify resources and tools and equipment required for permaculture works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm availability with suppliers, contractors and appropriate personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify site access and establishment issues and follow plan for environmental impacts

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Follow a permaculture works plan

  1. Follow safety plan for permaculture works
  2. List tools and materials required, including amounts and their sources
  3. Follow the staged program of works to provide a sequential allocation of material resources and works tasks with specifications to meet determined project timelines
  4. Determine the establishment period and maintenance period of works
  5. Incorporate seasonal factors and impacts in the staging strategy to allow for planting supply and care, wet day access, machinery use, fire hazards and establishment period
Follow safety plan for permaculture works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

List tools and materials required, including amounts and their sources

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Follow the staged program of works to provide a sequential allocation of material resources and works tasks with specifications to meet determined project timelines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine the establishment period and maintenance period of works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Incorporate seasonal factors and impacts in the staging strategy to allow for planting supply and care, wet day access, machinery use, fire hazards and establishment period

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement the permaculture works

  1. Take delivery of materials and equipment
  2. Assemble human resources on site and allocate team leaders
  3. Undertake works briefing and safety briefing
  4. Supervise permaculture works
  5. Complete permaculture works according to the permaculture works plan
Take delivery of materials and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble human resources on site and allocate team leaders

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake works briefing and safety briefing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Supervise permaculture works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete permaculture works according to the permaculture works plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for permaculture works

1.1 Confirm and verify client preferences and contract requirements

1.2 Verify scope of works

1.3 Verify specific statutory obligations

1.4 Conduct a site visit to confirm details of permaculture works plan

1.5 Identify safety hazards and work health and safety obligations associated with the permaculture works

1.6 Verify the availability, quantity and costs of plants and other materials listed in the project schedules

1.7 Verify resources and tools and equipment required for permaculture works

1.8 Confirm availability with suppliers, contractors and appropriate personnel

1.9 Verify site access and establishment issues and follow plan for environmental impacts

2. Follow a permaculture works plan

2.1 Follow safety plan for permaculture works

2.2 List tools and materials required, including amounts and their sources

2.3 Follow the staged program of works to provide a sequential allocation of material resources and works tasks with specifications to meet determined project timelines

2.4 Determine the establishment period and maintenance period of works

2.5 Incorporate seasonal factors and impacts in the staging strategy to allow for planting supply and care, wet day access, machinery use, fire hazards and establishment period

3. Implement the permaculture works

3.1 Take delivery of materials and equipment

3.2 Assemble human resources on site and allocate team leaders

3.3 Undertake works briefing and safety briefing

3.4 Supervise permaculture works

3.5 Complete permaculture works according to the permaculture works plan

Required Skills and Knowledge

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for permaculture works

1.1 Confirm and verify client preferences and contract requirements

1.2 Verify scope of works

1.3 Verify specific statutory obligations

1.4 Conduct a site visit to confirm details of permaculture works plan

1.5 Identify safety hazards and work health and safety obligations associated with the permaculture works

1.6 Verify the availability, quantity and costs of plants and other materials listed in the project schedules

1.7 Verify resources and tools and equipment required for permaculture works

1.8 Confirm availability with suppliers, contractors and appropriate personnel

1.9 Verify site access and establishment issues and follow plan for environmental impacts

2. Follow a permaculture works plan

2.1 Follow safety plan for permaculture works

2.2 List tools and materials required, including amounts and their sources

2.3 Follow the staged program of works to provide a sequential allocation of material resources and works tasks with specifications to meet determined project timelines

2.4 Determine the establishment period and maintenance period of works

2.5 Incorporate seasonal factors and impacts in the staging strategy to allow for planting supply and care, wet day access, machinery use, fire hazards and establishment period

3. Implement the permaculture works

3.1 Take delivery of materials and equipment

3.2 Assemble human resources on site and allocate team leaders

3.3 Undertake works briefing and safety briefing

3.4 Supervise permaculture works

3.5 Complete permaculture works according to the permaculture works plan

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

write reports for supervisors, clients and contractors

assess a site for opportunities and constraints associated with implementation of permaculture works

implement a staged permaculture works plan

determine tools and equipment required

calculate amounts of materials required

The candidate must demonstrate knowledge of:

permaculture principles and practices

permaculture works, such as

implementing permaculture designs

following a permaculture works plan as part of a permaculture project

constructing permaculture structures and features

implementing permaculture earthworks

practical understanding of the environmental issues associated with undertaking permaculture works, such as:

use of materials that come from sustainable sources

duty of care in conserving site’s natural values

work practices

the use and movement of machinery, storage of materials, removal of weeds and movement of soil and other materials into, across and beyond the site

principles of ecology, including specific plant and animal relationships and habitat requirements

statutory compliance and obligations, such as:

compliance with legislation, ordinances, regulations or bylaws relating to the works or the work site

Site responsibilities include OHS, industrial relations and equal opportunity and employment

site evaluation techniques including methods of analysing soils, waterways and their condition

practical understanding of the advantages and disadvantages of a range of permaculture procedures

selection and use of appropriate combinations of machinery and tools

work health and safety hazards associated with undertaking permaculture works and the controls necessary to remove or minimise risks associated with them

contract documentation including specifications, plans of permaculture works, services, supplies and surveyors documents

scope of works determination

works’ breakdown into tasks

scheduling and time line generation

task specifications and evaluation

Range Statement