NTISthis.com

Evidence Guide: AHCPGD205 - Prepare a grave site

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCPGD205 - Prepare a grave site

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare site for excavation

  1. Identify work health and safety hazards, assess risks and report to the supervisor
  2. Select and use personal protective clothing (PPE) and equipment
  3. Select, prepare and use tools, equipment and machinery
  4. Inspect surrounding monuments, masonry or headstones that threaten the stability of the new gravesite and remove if necessary, after consultation with supervisor
  5. Use sludge pump to remove excess water if required
  6. Mark gravesite out to suit coffin dimensions
Identify work health and safety hazards, assess risks and report to the supervisor

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and use personal protective clothing (PPE) and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, prepare and use tools, equipment and machinery

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect surrounding monuments, masonry or headstones that threaten the stability of the new gravesite and remove if necessary, after consultation with supervisor

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use sludge pump to remove excess water if required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mark gravesite out to suit coffin dimensions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assist with the excavation

  1. Assist with excavation of grave
  2. Shore sides of grave where depth of grave exceeds 1.5 metres or as instructed
  3. Cover surface area for 400 mm from the edge of the excavation with an approved material to ensure the integrity and stability of the soil
  4. Secure gravesite with protective restraints to limit access to the site while being established and when left unattended
Assist with excavation of grave

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shore sides of grave where depth of grave exceeds 1.5 metres or as instructed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cover surface area for 400 mm from the edge of the excavation with an approved material to ensure the integrity and stability of the soil

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Secure gravesite with protective restraints to limit access to the site while being established and when left unattended

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Backfill and enhance the gravesite following burial

  1. Back-fill grave with soil free from large lumps, plant debris or waste material
  2. Use backfilling techniques to consolidate the soil, to minimise cavities and to restore the ground to its original level
  3. Replace surrounding monuments, masonry or headstones as necessary
  4. Dispose of waste material and plant debris removed from the gravesite in an environmentally ssafe manner
  5. Enhance gravesite as instructed
Back-fill grave with soil free from large lumps, plant debris or waste material

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use backfilling techniques to consolidate the soil, to minimise cavities and to restore the ground to its original level

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Replace surrounding monuments, masonry or headstones as necessary

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dispose of waste material and plant debris removed from the gravesite in an environmentally ssafe manner

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Enhance gravesite as instructed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare site for excavation

1.1 Identify work health and safety hazards, assess risks and report to the supervisor

1.2 Select and use personal protective clothing (PPE) and equipment

1.3 Select, prepare and use tools, equipment and machinery

1.4 Inspect surrounding monuments, masonry or headstones that threaten the stability of the new gravesite and remove if necessary, after consultation with supervisor

1.5 Use sludge pump to remove excess water if required

1.6 Mark gravesite out to suit coffin dimensions

2. Assist with the excavation

2.1 Assist with excavation of grave

2.2 Shore sides of grave where depth of grave exceeds 1.5 metres or as instructed

2.3 Cover surface area for 400 mm from the edge of the excavation with an approved material to ensure the integrity and stability of the soil

2.4 Secure gravesite with protective restraints to limit access to the site while being established and when left unattended

3. Backfill and enhance the gravesite following burial

3.1 Back-fill grave with soil free from large lumps, plant debris or waste material

3.2 Use backfilling techniques to consolidate the soil, to minimise cavities and to restore the ground to its original level

3.3 Replace surrounding monuments, masonry or headstones as necessary

3.4 Dispose of waste material and plant debris removed from the gravesite in an environmentally ssafe manner

3.5 Enhance gravesite as instructed

Required Skills and Knowledge

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare site for excavation

1.1 Identify work health and safety hazards, assess risks and report to the supervisor

1.2 Select and use personal protective clothing (PPE) and equipment

1.3 Select, prepare and use tools, equipment and machinery

1.4 Inspect surrounding monuments, masonry or headstones that threaten the stability of the new gravesite and remove if necessary, after consultation with supervisor

1.5 Use sludge pump to remove excess water if required

1.6 Mark gravesite out to suit coffin dimensions

2. Assist with the excavation

2.1 Assist with excavation of grave

2.2 Shore sides of grave where depth of grave exceeds 1.5 metres or as instructed

2.3 Cover surface area for 400 mm from the edge of the excavation with an approved material to ensure the integrity and stability of the soil

2.4 Secure gravesite with protective restraints to limit access to the site while being established and when left unattended

3. Backfill and enhance the gravesite following burial

3.1 Back-fill grave with soil free from large lumps, plant debris or waste material

3.2 Use backfilling techniques to consolidate the soil, to minimise cavities and to restore the ground to its original level

3.3 Replace surrounding monuments, masonry or headstones as necessary

3.4 Dispose of waste material and plant debris removed from the gravesite in an environmentally ssafe manner

3.5 Enhance gravesite as instructed

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting.

The candidate must provide evidence that they can:

prepare site for excavation

assist with the site excavation

shore up sides of grave as required

backfill and enhance the gravesite following burial

The candidate must demonstrate knowledge of:

principles and practices of grave site preparation

safe work practices working in and around confined spaces

the environmental implications of pumping sludge water from an excavation site and the effects it may have on surrounding gravesites

work health and safety responsibilities of employees

Range Statement