Evidence Guide: AHCSAW302 - Implement erosion and sediment control measures

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCSAW302 - Implement erosion and sediment control measures

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for implementation and construction

  1. Confirm that erosion and sediment control plan and schedule of works match site conditions
  2. Identify survey pegs and site indicators on site
  3. Match equipment and tools to program works and terrain on site
  4. Verify work readiness of selected equipment and tools
  5. Assess and minimise risks to others and the environment
  6. Select and use appropriate personal protective equipment
  7. Select materials to complete proposed works in line with construction schedule
Confirm that erosion and sediment control plan and schedule of works match site conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify survey pegs and site indicators on site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Match equipment and tools to program works and terrain on site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify work readiness of selected equipment and tools

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess and minimise risks to others and the environment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and use appropriate personal protective equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select materials to complete proposed works in line with construction schedule

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out implementation and construction

  1. Plan work sequence
  2. Construct earthworks
  3. Install erosion and sediment control products and materials
Plan work sequence

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct earthworks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install erosion and sediment control products and materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out repairs and maintenance procedures

  1. Monitor site, identify issues and carry out repairs as necessary
  2. Complete maintenance procedures as required
  3. Clean and store machinery, tools and equipment
  4. Complete work records
Monitor site, identify issues and carry out repairs as necessary

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete maintenance procedures as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean and store machinery, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work records

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for implementation and construction

1.1 Confirm that erosion and sediment control plan and schedule of works match site conditions

1.2 Identify survey pegs and site indicators on site

1.3 Match equipment and tools to program works and terrain on site

1.4 Verify work readiness of selected equipment and tools

1.5 Assess and minimise risks to others and the environment

1.6 Select and use appropriate personal protective equipment

1.7 Select materials to complete proposed works in line with construction schedule

2. Carry out implementation and construction

2.1 Plan work sequence

2.2 Construct earthworks

2.3 Install erosion and sediment control products and materials

3. Carry out repairs and maintenance procedures

3.1 Monitor site, identify issues and carry out repairs as necessary

3.2 Complete maintenance procedures as required

3.4 Clean and store machinery, tools and equipment

3.5 Complete work records

Required Skills and Knowledge

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for implementation and construction

1.1 Confirm that erosion and sediment control plan and schedule of works match site conditions

1.2 Identify survey pegs and site indicators on site

1.3 Match equipment and tools to program works and terrain on site

1.4 Verify work readiness of selected equipment and tools

1.5 Assess and minimise risks to others and the environment

1.6 Select and use appropriate personal protective equipment

1.7 Select materials to complete proposed works in line with construction schedule

2. Carry out implementation and construction

2.1 Plan work sequence

2.2 Construct earthworks

2.3 Install erosion and sediment control products and materials

3. Carry out repairs and maintenance procedures

3.1 Monitor site, identify issues and carry out repairs as necessary

3.2 Complete maintenance procedures as required

3.4 Clean and store machinery, tools and equipment

3.5 Complete work records

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

construct, install and maintain a range of erosion and sediment control measures

identify hazards and implement safe work procedures

prepare for implementation and construction

read and follow plans to carry out implementation and construction

identify survey pegs and site indicators on site and on the plans

carry out repairs and maintenance procedures to enterprise standards

select equipment and materials appropriate for the task

operate equipment and machinery according to safe work practices and manufacturer instructions

clean and store equipment, machinery and tools according to organisational requirements

The candidate must demonstrate knowledge of:

materials cartage pollution control

sequence of working and timing/duration

work health and safety issues relating to the equipment and the site

equipment used

materials suitable for constructing erosion and sediment control measures and where to source them on site

limitations of structures including timing of maintenance, structure life cycle, specifications and standards

Range Statement