NTISthis.com

Evidence Guide: AHCSAW503A - Plan conservation earthworks

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCSAW503A - Plan conservation earthworks

What evidence can you provide to prove your understanding of each of the following citeria?

Establish client needs

  1. The proposed land use is discussed and confirmed in writing with the landholder.
  2. The catchment characteristics are reviewed and discussed considering the proposed land use.
  3. Current impacting legislation and policies are explained to the landholder.
  4. Possible strategies are discussed with the landholder and the best option confirmed in writing.
The proposed land use is discussed and confirmed in writing with the landholder.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The catchment characteristics are reviewed and discussed considering the proposed land use.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Current impacting legislation and policies are explained to the landholder.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Possible strategies are discussed with the landholder and the best option confirmed in writing.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop the strategy to utilise earthworks

  1. Property ownership and boundary are confirmed by checking maps and titles.
  2. Profile of catchment is determined from survey and aerial photographs.
  3. Earthworks concept is developed consistent with industry principles and selection criteria.
  4. Final water disposal points are established in line with proposed strategy.
  5. Proposed location of structures are tested by survey and discussed with landholder.
  6. Preferred strategy is documented according to enterprise guidelines.
Property ownership and boundary are confirmed by checking maps and titles.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Profile of catchment is determined from survey and aerial photographs.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Earthworks concept is developed consistent with industry principles and selection criteria.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Final water disposal points are established in line with proposed strategy.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Proposed location of structures are tested by survey and discussed with landholder.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Preferred strategy is documented according to enterprise guidelines.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare a detailed works plan

  1. Plan is prepared according to enterprise guidelines and industry best practice.
  2. Selection criteria applied for earthwork structures or measures align with industry standards.
  3. Design of relevant structures are communicated with specific details to qualified designer.
  4. Relevant documentation is prepared and presented, and is consistent with category of work and industry standards.
Plan is prepared according to enterprise guidelines and industry best practice.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Selection criteria applied for earthwork structures or measures align with industry standards.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design of relevant structures are communicated with specific details to qualified designer.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant documentation is prepared and presented, and is consistent with category of work and industry standards.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

establish client needs

carry out site investigations including surveying

develop a strategy to protect natural areas

establish the purpose and specifications of earthworks

prepare detailed project costing and works plan.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.

Required Skills and Knowledge

Required skills

establish client needs

carry out site investigations including surveying

develop a strategy to protect natural areas

develop the strategy to utilise earthworks

recommend appropriate construction equipment

prepare detailed project costing

prepare a detailed works plan

negotiate agreed project outcome

use literacy skills to fulfil job roles as required by the organisation. The level of skill may range from reading and understanding documentation to completion of written reports

use oral communication skills/language competence to fulfil the job role as specified by the organisation including questioning, active listening, asking for clarification, negotiating solutions and responding to a range of views

use numeracy skills to estimate, calculate and record complex workplace measures

use interpersonal skills to work with others and relate to people from a range of cultural, social and religious backgrounds and with a range of physical and mental abilities.

Required knowledge

relevant environmental, planning and groundwater legislation

relevant environmental, planning and earthwork construction standards and Codes of Practice

earthwork structures

erosion control and design principles

natural areas (particularly topsoil) protection and rehabilitation principles

soils and soil formation

levels and levelling survey plans and titles

earthmoving principles

total catchment issues

land use and land development strategies

legal issues

environmental issues

country code

managing peak water flows

subsurface and surface drainage principles and systems

limitations of design aids provided for industry.

Range Statement

The range statement relates to the unit of competency as a whole.

Conservation works may include:

earthworks constructions -

dams

bank and drain

waterways

land rehabilitation

water ponding schemes

dams -

gully embankment

hillside

excavated

ring

turkey nest

spread bank

banks.