The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Survey the construction site
|
|
Surveying equipment is set up and used according to industry standards. Completed |
Evidence:
|
Existing levels are surveyed and temporary benchmark established. Details are recorded accurately and legibly according to industry standards. Completed |
Evidence:
|
New levels are set according to specifications and pegs placed according to industry convention. Completed |
Evidence:
|
Contour map with reduced levels and a cross section is developed and drawn using accepted industry symbols and mapping conventions. Completed |
Evidence:
|
Prepare for construction work
|
|
Enterprise work team, contractors and design consultants are identified and, where required, engaged. Completed |
Evidence:
|
Work tasks are scheduled in a logical, timely and effective manner in consultation with the supervisor. Completed |
Evidence:
|
Materials required are estimated and costed according to accepted industry practice and ordered. Completed |
Evidence:
|
Plans for the new construction profile are obtained or developed. Completed |
Evidence:
|
Set out site for construction
|
|
Soil profile construction requiring set out. Completed |
Evidence:
|
Excavate the construction site
|
|
Excess soil is removed and the construction site cleared with the stockpile being placed in a designated area according to enterprise work procedures. Completed |
Evidence:
|
The base is graded to the level and slope specified in the base design. Completed |
Evidence:
|
The base of the profile is prepared over the entire site according to the construction plan. Completed |
Evidence:
|
Sub-surface irrigation system components and fittings are installed to the required depth and design specified in the construction plan. Completed |
Evidence:
|
Install drainage system. Completed |
Evidence:
|
Install soil profile
|
|
Quantities of material required are calculated and measured according to the construction plan. Completed |
Evidence:
|
Soils and growing media are selected for sustainable use and according to the construction plan. Completed |
Evidence:
|
Each profile layer is installed and compacted to reflect the final contour. Completed |
Evidence:
|
The interface between profile layers is uniform and unbroken according to the construction plan. Completed |
Evidence:
|
Soil amendments are prepared and implemented. Completed |
Evidence:
|
The finishing soil surface is given a final levelling and consolidated, ready for planting, according to the construction plan and enterprise work procedures. Completed |
Evidence:
|