NTISthis.com

Evidence Guide: AHCTRF201 - Assist with turf construction

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AHCTRF201 - Assist with turf construction

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for soil profile construction

  1. Locate services using site and construction plans and in consultation with the supervisor
  2. Identify work health and safety hazards, assess and report risks
  3. Select suitable safety equipment for the soil profile construction program
  4. Prepare the construction site according to the construction plan
Locate services using site and construction plans and in consultation with the supervisor

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify work health and safety hazards, assess and report risks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select suitable safety equipment for the soil profile construction program

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare the construction site according to the construction plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare equipment for soil profile construction

  1. Select construction tools, equipment and machinery
  2. Carry out pre-operational and safety checks on tools, equipment and machinery
  3. Select, use and maintain suitable personal protective equipment (PPE)
Select construction tools, equipment and machinery

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out pre-operational and safety checks on tools, equipment and machinery

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, use and maintain suitable personal protective equipment (PPE)

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake soil profile construction

  1. Grade and consolidate the base to the specified level and on a consistent slope to achieve uniform compaction over the site
  2. Dig trench lines to the specified depth, width and fall, with all superfluous material evacuated and stored safely
Grade and consolidate the base to the specified level and on a consistent slope to achieve uniform compaction over the site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dig trench lines to the specified depth, width and fall, with all superfluous material evacuated and stored safely

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore the site after drainage and irrigation installation

  1. Back fill trenches with specified construction materials, consolidate and level
  2. Level the site as each layer of the soil profile is installed
  3. Water the site thoroughly on completion
  4. Remove and dispose of waste material from the site
  5. Clean, maintain and store tools, equipment and machinery
  6. Maintain a clean and safe area
  7. Record or report work outcomes
Back fill trenches with specified construction materials, consolidate and level

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Level the site as each layer of the soil profile is installed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Water the site thoroughly on completion

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove and dispose of waste material from the site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, maintain and store tools, equipment and machinery

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain a clean and safe area

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record or report work outcomes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for soil profile construction

1.1 Locate services using site and construction plans and in consultation with the supervisor

1.2 Identify work health and safety hazards, assess and report risks

1.3 Select suitable safety equipment for the soil profile construction program

1.4 Prepare the construction site according to the construction plan

2. Prepare equipment for soil profile construction

2.1 Select construction tools, equipment and machinery

2.2 Carry out pre-operational and safety checks on tools, equipment and machinery

2.3 Select, use and maintain suitable personal protective equipment (PPE)

3. Undertake soil profile construction

3.1 Grade and consolidate the base to the specified level and on a consistent slope to achieve uniform compaction over the site

3.2 Dig trench lines to the specified depth, width and fall, with all superfluous material evacuated and stored safely

4. Restore the site after drainage and irrigation installation

4.1 Back fill trenches with specified construction materials, consolidate and level

4.2 Level the site as each layer of the soil profile is installed

4.3 Water the site thoroughly on completion

4.4 Remove and dispose of waste material from the site

4.5 Clean, maintain and store tools, equipment and machinery

4.6 Maintain a clean and safe area

4.7 Record or report work outcomes

Required Skills and Knowledge

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for soil profile construction

1.1 Locate services using site and construction plans and in consultation with the supervisor

1.2 Identify work health and safety hazards, assess and report risks

1.3 Select suitable safety equipment for the soil profile construction program

1.4 Prepare the construction site according to the construction plan

2. Prepare equipment for soil profile construction

2.1 Select construction tools, equipment and machinery

2.2 Carry out pre-operational and safety checks on tools, equipment and machinery

2.3 Select, use and maintain suitable personal protective equipment (PPE)

3. Undertake soil profile construction

3.1 Grade and consolidate the base to the specified level and on a consistent slope to achieve uniform compaction over the site

3.2 Dig trench lines to the specified depth, width and fall, with all superfluous material evacuated and stored safely

4. Restore the site after drainage and irrigation installation

4.1 Back fill trenches with specified construction materials, consolidate and level

4.2 Level the site as each layer of the soil profile is installed

4.3 Water the site thoroughly on completion

4.4 Remove and dispose of waste material from the site

4.5 Clean, maintain and store tools, equipment and machinery

4.6 Maintain a clean and safe area

4.7 Record or report work outcomes

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

clean, maintain and store turf construction machinery and equipment

follow procedures and sequence work during the course of the construction

use a range of turf construction machinery and equipment

work in a team on a turf construction project

The candidate must demonstrate knowledge of:

principles and practices of turf construction

different soil preparations for construction

effective and safe use of tools and machinery

influences on the selection of tools, machinery and safety equipment

irrigation and/or drainage installation procedures and operational techniques

purpose of turf construction in maintaining turf presentation

relationship between a well-constructed soil profile for the quality and appearance of the turf

Range Statement