The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Determine design requirements
|
|
Quality of water to be treated and level of treatment is determined. Completed |
Evidence:
|
Construction specifications define the work required to treat water for the enterprise in accordance with environmental and Occupational Health and Safety (OHS) requirements. Completed |
Evidence:
|
Environmentally sensitive areas are identified and protected according to local, State and National legislation. Completed |
Evidence:
|
Design calculations and decisions are documented to enterprise requirements. Completed |
Evidence:
|
Define pumping and power systems
|
|
Pumps are selected to treat water efficiently and effectively as required, to enable supply at the flow and the pressure required to operate the distribution system. Completed |
Evidence:
|
The pump motor combinations are efficient and the pumps are reliable, functional, serviceable and flexible for the intended application. Completed |
Evidence:
|
Energy requirements are determined and layout of electricity lines are determined and checked with local authority. Completed |
Evidence:
|
The relationship between capital and operational costs are optimised including a comparison of energy sources. Completed |
Evidence:
|
Structures, valves and accessories are selected and integrated into a functional system that can be monitored and maintained according to enterprise guidelines. Completed |
Evidence:
|
Performance indicators, design calculations and decisions are documented according to enterprise guidelines. Completed |
Evidence:
|
Construction specifications define the work required to make a suitable pumping and power system available to enterprise. Completed |
Evidence:
|
Power supply design specification is checked with power authorities Completed |
Evidence:
|
Design an water treatment system
|
|
Treatment systems are evaluated and designed with respect to a range of key variables. Completed |
Evidence:
|
Pipes, valves and fittings are sized according to design system specifications so that capital cost is balanced against operation costs over the anticipated system life. Completed |
Evidence:
|
Flows, water levels and pressures are calculated and documented to be within the acceptable tolerances for optimum performance. Completed |
Evidence:
|
Flows, water levels and pressures are achievable by the pumps operating at optimum efficiency and according to enterprise standards. Completed |
Evidence:
|
Mechanisms for controlling and adjusting pressure are included. Completed |
Evidence:
|
Determine capital expense budget
|
|
Design calculations and decisions are documented and relevant information is communicated clearly through plans, specifications and manuals. Completed |
Evidence:
|
Design output is checked by a competent designer against enterprise objectives. Completed |
Evidence:
|
Materials requirements are determined and documented from plans and specifications. Completed |
Evidence:
|
Labour requirements are estimated based upon documented work schedule, with reasonable allowance for variances in work schedules. Completed |
Evidence:
|
Costing attributed to each component is based upon quoted information from suppliers, or sound analysis of individual elements. Completed |
Evidence:
|
Determine operating expense budget
|
|
Operating expense budget indicates all expenses applicable to the completed irrigation system. Completed |
Evidence:
|