The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Interpret installation plan
|
|
Applicable OHS and organisational requirements relevant to the installation of plant, equipment or systems are verified and complied with throughout the work activity Completed |
Evidence:
|
Instructions and plans are read and interpreted to identify processes and materials to complete work tasks Completed |
Evidence:
|
Installation plan is interpreted in terms of the sequence and timing of activities, and action plan is initiated Completed |
Evidence:
|
The proposed installation is discussed with designated staff to establish suitable times for the work to be conducted Completed |
Evidence:
|
Arrangements are made for staffing to be available and/or contracted Completed |
Evidence:
|
Arrangements are made for physical resources to be available and/or purchased/leased Completed |
Evidence:
|
Obtain component parts, plant and/or equipment
|
|
Supply arrangements of all component parts, plant and/or equipment are confirmed or arranged Completed |
Evidence:
|
Arrangements are made for the delivery of all component parts, plant and/or equipment to the required locations on the specified dates in accordance with the installation plan Completed |
Evidence:
|
Where necessary, arrangements are made for the storage of component parts, plant and/or equipment in accordance with the installation plan Completed |
Evidence:
|
Prepare the work site
|
|
Presentations required for the work site are interpreted from the design drawings and documentation Completed |
Evidence:
|
Work site is prepared in accordance with the installation plan and the requirements of the manufacturer of the component parts, plant and/or equipment and OHS policies and procedures Completed |
Evidence:
|
Prepared work site is checked for the compliance with the design drawings and specifications, and any necessary adjustments made Completed |
Evidence:
|
Conduct installation of parts equipment, fixtures and/or extra low voltage wiring
|
|
All parts, equipment, fixtures and/or extra low voltage wiring to be used in the installation are checked to ensure that they meet the specified technical and safety requirements Completed |
Evidence:
|
Any necessary pre-installation preparation of parts, plant, equipment, fixtures and/or extra low voltage wiring is carried out in accordance with the installation plan and the technical specifications for the work Completed |
Evidence:
|
Installation of the parts, plant, equipment, fixtures and/or extra low voltage wiring is carried out Completed |
Evidence:
|
Verify installation
|
|
Installation is checked against the design specifications, organisational quality standards, manufacturer instructions and OHS requirements Completed |
Evidence:
|
Where the installation does not meet the specified requirements, the problem is reported and any necessary action taken Completed |
Evidence:
|
Outcomes of the checks of the installation and any resulting action are documented Completed |
Evidence:
|