The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Identify faulty plant, tooling, equipment or systems
|
|
Applicable OHS and organisation requirements relevant to the repair of plant, tooling, equipment or systems are verified and complied with throughout the work activity Completed |
Evidence:
|
Instructions and plans are read and interpreted to identify processes and materials to complete work tasks Completed |
Evidence:
|
Reported defects and malfunctions or out-of-tolerance performance of plant, tooling, equipment or systems are investigated and potential faults identified Completed |
Evidence:
|
Parts, plant, tooling, equipment and systems are visually inspected and/or operated through specified test procedures to establish serviceability or to confirm defects in accordance with prescribed requirements Completed |
Evidence:
|
Faulty plant, tooling, equipment and systems are identified and the nature of the fault confirmed, reported and documented Completed |
Evidence:
|
An action plan/flow chart for the removal and/or repair and replacement of the faulty plant, tooling, equipment or system is developed in conjunction with the relevant production and maintenance staff Completed |
Evidence:
|
Remove faulty plant, tooling, equipment or systems
|
|
If necessary, the faulty plant, tooling, equipment or system is removed in accordance with the agreed action plan and organisational procedures Completed |
Evidence:
|
Where required, temporary replacement of the faulty plant, tooling equipment or system is made pending repair and/or permanent replacement Completed |
Evidence:
|
The faulty plant, tooling, equipment or system is transported to the repair area using appropriate materials handling equipment Completed |
Evidence:
|
Diagnose faults in plant, tooling, equipment or systems
|
|
Available information from maintenance records and test results is used, where necessary, to assist in fault determination Completed |
Evidence:
|
Available fault diagnosis guides are used, where appropriate, to assist in the determination of faults Completed |
Evidence:
|
Faults are located, causes identified and fault rectification requirements determined to assist in planning the repair Completed |
Evidence:
|
Specialist advice is obtained, where necessary, to assist with, or confirm, the fault rectification strategy Completed |
Evidence:
|
Repair faults in plant, tooling, equipment or systems
|
|
In accordance with the repair strategy, faulty plant, tooling and equipment or systems are dismantled Completed |
Evidence:
|
Component parts are assessed for wear and serviceability Completed |
Evidence:
|
Repair methodology is determined Completed |
Evidence:
|
Parts requiring specialist repair are tagged, and repair instructions are accurately specified and entered on a database in accordance with organisational procedures Completed |
Evidence:
|
Component parts are repaired, modified and/or replaced Completed |
Evidence:
|
Plant, tooling and equipment are assembled Completed |
Evidence:
|
Reinstall plant, tooling, equipment and systems
|
|
A plan for the re-installation of new or repaired plant, tooling, equipment or systems is developed in conjunction with the relevant production staff Completed |
Evidence:
|
New or repaired plant, tooling, equipment or system is re-installed Completed |
Evidence:
|
Installed new or repaired plant, tooling and equipment is visually checked to ensure it is correctly fitted Completed |
Evidence:
|
Calibrate, adjust and/or test plant, tooling, equipment or systems
|
|
Installed new or repaired plant, tooling and equipment is calibration verified, adjusted and/or tested through its operational cycle Completed |
Evidence:
|
Details of the repair, the results of re-commissioning tests and the confirmation of serviceability are documented Completed |
Evidence:
|