NTISthis.com

Evidence Guide: AUMATK007 - Install vehicle plant, equipment and systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AUMATK007 - Install vehicle plant, equipment and systems

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for installation

  1. Installation instructions and work plans are identified and confirmed with appropriate personnel and installation requirements are determined
  2. Parts, plant and equipment required for installation are obtained according to workplace procedures and within scope of responsibilities
  3. Workplace procedures for installing vehicle plant, equipment and systems are identified
  4. Work site is prepared according to installation plan and requirements of the manufacturer of the component parts, plant and equipment
  5. Compliance of prepared work site with design drawings, work specifications, and work health and safety (WHS) requirements is determined
Installation instructions and work plans are identified and confirmed with appropriate personnel and installation requirements are determined

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Parts, plant and equipment required for installation are obtained according to workplace procedures and within scope of responsibilities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace procedures for installing vehicle plant, equipment and systems are identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work site is prepared according to installation plan and requirements of the manufacturer of the component parts, plant and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compliance of prepared work site with design drawings, work specifications, and work health and safety (WHS) requirements is determined

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct installation

  1. Pre-installation of parts, plant, equipment, fixtures and additional low voltage wiring is completed according to the installation plan and work specifications
  2. Parts, plant, equipment, fixtures and additional low voltage wiring are installed according to installation plan and work specifications
  3. Parts, plant, equipment, fixtures and additional low voltage wiring installations are checked against technical and safety requirements
Pre-installation of parts, plant, equipment, fixtures and additional low voltage wiring is completed according to the installation plan and work specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Parts, plant, equipment, fixtures and additional low voltage wiring are installed according to installation plan and work specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Parts, plant, equipment, fixtures and additional low voltage wiring installations are checked against technical and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finalise installation

  1. Installation is checked against design specifications, workplace quality standards, manufacturer instructions and WHS requirements
  2. Installation faults are reported and rectified according to workplace procedures
  3. Installation reports are completed according to workplace procedures
Installation is checked against design specifications, workplace quality standards, manufacturer instructions and WHS requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation faults are reported and rectified according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation reports are completed according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section

1. Prepare for installation

1.1 Installation instructions and work plans are identified and confirmed with appropriate personnel and installation requirements are determined

1.2 Parts, plant and equipment required for installation are obtained according to workplace procedures and within scope of responsibilities

1.3 Workplace procedures for installing vehicle plant, equipment and systems are identified

1.4 Work site is prepared according to installation plan and requirements of the manufacturer of the component parts, plant and equipment

1.5 Compliance of prepared work site with design drawings, work specifications, and work health and safety (WHS) requirements is determined

2. Conduct installation

2.1 Pre-installation of parts, plant, equipment, fixtures and additional low voltage wiring is completed according to the installation plan and work specifications

2.2 Parts, plant, equipment, fixtures and additional low voltage wiring are installed according to installation plan and work specifications

2.3 Parts, plant, equipment, fixtures and additional low voltage wiring installations are checked against technical and safety requirements

3. Finalise installation

3.1 Installation is checked against design specifications, workplace quality standards, manufacturer instructions and WHS requirements

3.2 Installation faults are reported and rectified according to workplace procedures

3.3 Installation reports are completed according to workplace procedures

Required Skills and Knowledge

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section

1. Prepare for installation

1.1 Installation instructions and work plans are identified and confirmed with appropriate personnel and installation requirements are determined

1.2 Parts, plant and equipment required for installation are obtained according to workplace procedures and within scope of responsibilities

1.3 Workplace procedures for installing vehicle plant, equipment and systems are identified

1.4 Work site is prepared according to installation plan and requirements of the manufacturer of the component parts, plant and equipment

1.5 Compliance of prepared work site with design drawings, work specifications, and work health and safety (WHS) requirements is determined

2. Conduct installation

2.1 Pre-installation of parts, plant, equipment, fixtures and additional low voltage wiring is completed according to the installation plan and work specifications

2.2 Parts, plant, equipment, fixtures and additional low voltage wiring are installed according to installation plan and work specifications

2.3 Parts, plant, equipment, fixtures and additional low voltage wiring installations are checked against technical and safety requirements

3. Finalise installation

3.1 Installation is checked against design specifications, workplace quality standards, manufacturer instructions and WHS requirements

3.2 Installation faults are reported and rectified according to workplace procedures

3.3 Installation reports are completed according to workplace procedures

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Instructions must include:

installation and work plans

job sheets, job specifications and design drawings

manufacturer instructions for the use of equipment and materials

work plans

workplace procedures to install plant and equipment.

Installation requirements must include:

physical resources

staffing.

Workplace procedures must include:

quality and continuous improvement programs

recording and reporting installation outcomes

WHS requirements.