NTISthis.com

Evidence Guide: AUMATK008 - Maintain vehicle plant, tools, equipment and systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AUMATK008 - Maintain vehicle plant, tools, equipment and systems

What evidence can you provide to prove your understanding of each of the following citeria?

Develop maintenance plans

  1. Workplace procedures for maintaining plant, tools, equipment and systems are confirmed
  2. Plant, tools, equipment or system to be maintained is identified
  3. Instructions, plans and workplace checklists are identified
  4. Preventative maintenance requirements are identified from manufacturer recommendations
  5. Preventative maintenance work plan and schedules are prepared and submitted to appropriate personnel
Workplace procedures for maintaining plant, tools, equipment and systems are confirmed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plant, tools, equipment or system to be maintained is identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Instructions, plans and workplace checklists are identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Preventative maintenance requirements are identified from manufacturer recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Preventative maintenance work plan and schedules are prepared and submitted to appropriate personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct maintenance

  1. Preventative maintenance is conducted according to work plans and procedures and plant, tool, equipment or system is inspected for wear, defects and damage
  2. Maintenance requirements are reported and recommendations made to appropriate personnel
  3. Maintenance activities are conducted and results documented
Preventative maintenance is conducted according to work plans and procedures and plant, tool, equipment or system is inspected for wear, defects and damage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintenance requirements are reported and recommendations made to appropriate personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintenance activities are conducted and results documented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor performance post-maintenance

  1. Critical performance measures and observations of plant, tool, equipment or system are obtained and recorded
  2. Recorded performance measures and observations are compared against specifications and reported according to workplace procedures
Critical performance measures and observations of plant, tool, equipment or system are obtained and recorded

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recorded performance measures and observations are compared against specifications and reported according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct adjustments and service

  1. Checks and adjustments are made as required
  2. Lubrication and regular servicing are carried out according to workplace procedures and manufacturer specifications
  3. Adjustments and servicing procedures are documented
Checks and adjustments are made as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lubrication and regular servicing are carried out according to workplace procedures and manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjustments and servicing procedures are documented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Document outcomes

  1. Routine adjustments, and emergency and preventative maintenance activities are documented
  2. Defective or malfunctioning plant, tools, equipment and system are reported according to workplace procedures
Routine adjustments, and emergency and preventative maintenance activities are documented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Defective or malfunctioning plant, tools, equipment and system are reported according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section

1. Develop maintenance plans

1.1 Workplace procedures for maintaining plant, tools, equipment and systems are confirmed

1.2 Plant, tools, equipment or system to be maintained is identified

1.3 Instructions, plans and workplace checklists are identified

1.4 Preventative maintenance requirements are identified from manufacturer recommendations

1.5 Preventative maintenance work plan and schedules are prepared and submitted to appropriate personnel

2. Conduct maintenance

2.1 Preventative maintenance is conducted according to work plans and procedures and plant, tool, equipment or system is inspected for wear, defects and damage

2.2 Maintenance requirements are reported and recommendations made to appropriate personnel

2.3 Maintenance activities are conducted and results documented

3. Monitor performance post-maintenance

3.1 Critical performance measures and observations of plant, tool, equipment or system are obtained and recorded

3.2 Recorded performance measures and observations are compared against specifications and reported according to workplace procedures

4. Conduct adjustments and service

4.1 Checks and adjustments are made as required

4.2 Lubrication and regular servicing are carried out according to workplace procedures and manufacturer specifications

4.3 Adjustments and servicing procedures are documented

5. Document outcomes

5.1 Routine adjustments, and emergency and preventative maintenance activities are documented

5.2 Defective or malfunctioning plant, tools, equipment and system are reported according to workplace procedures

Required Skills and Knowledge

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section

1. Develop maintenance plans

1.1 Workplace procedures for maintaining plant, tools, equipment and systems are confirmed

1.2 Plant, tools, equipment or system to be maintained is identified

1.3 Instructions, plans and workplace checklists are identified

1.4 Preventative maintenance requirements are identified from manufacturer recommendations

1.5 Preventative maintenance work plan and schedules are prepared and submitted to appropriate personnel

2. Conduct maintenance

2.1 Preventative maintenance is conducted according to work plans and procedures and plant, tool, equipment or system is inspected for wear, defects and damage

2.2 Maintenance requirements are reported and recommendations made to appropriate personnel

2.3 Maintenance activities are conducted and results documented

3. Monitor performance post-maintenance

3.1 Critical performance measures and observations of plant, tool, equipment or system are obtained and recorded

3.2 Recorded performance measures and observations are compared against specifications and reported according to workplace procedures

4. Conduct adjustments and service

4.1 Checks and adjustments are made as required

4.2 Lubrication and regular servicing are carried out according to workplace procedures and manufacturer specifications

4.3 Adjustments and servicing procedures are documented

5. Document outcomes

5.1 Routine adjustments, and emergency and preventative maintenance activities are documented

5.2 Defective or malfunctioning plant, tools, equipment and system are reported according to workplace procedures

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Instructions must include:

job sheets

maintenance instructions

manufacturer instructions

use and operation of tools and equipment

work plans, specifications and drawings

workplace procedures

workplace reporting and communications.

Preventative maintenance must include:

plans for daily, weekly, monthly and annual inspection and servicing of plant, tools, equipment and systems.