The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AUMFTK001 - Test automotive production components, equipment and systems

What evidence can you provide to prove your understanding of each of the following citeria?

Identify test objectives

  1. Workplace procedures to test and trial components of plant, tools, equipment, product or systems are identified and verified
  2. Instructions and work plans are interpreted to identify processes and materials to be used in testing
  3. Materials and components to be tested are obtained
  4. Test objectives are identified and confirmed with appropriate personnel
Workplace procedures to test and trial components of plant, tools, equipment, product or systems are identified and verified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Instructions and work plans are interpreted to identify processes and materials to be used in testing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials and components to be tested are obtained

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test objectives are identified and confirmed with appropriate personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine test methodology

  1. Sequence and specified procedures for test are determined according to workplace procedures and manufacturer instructions
  2. Test tools and equipment are identified and obtained according to job requirements
  3. Stakeholders are identified and consulted and test is modified to incorporate feedback
Sequence and specified procedures for test are determined according to workplace procedures and manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test tools and equipment are identified and obtained according to job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stakeholders are identified and consulted and test is modified to incorporate feedback

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and allocate resources to test

  1. Resources and appropriate personnel required to test material or component are identified and allocated
  2. Test plan is prepared according to workplace procedures, and confirmed with relevant stakeholders
Resources and appropriate personnel required to test material or component are identified and allocated

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test plan is prepared according to workplace procedures, and confirmed with relevant stakeholders

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor test

  1. Testing is monitored according to workplace procedures
  2. Support is provided to personnel conducting the test
  3. Modifications to test plan are proposed to stakeholders and accepted changes are implemented
Testing is monitored according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Support is provided to personnel conducting the test

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Modifications to test plan are proposed to stakeholders and accepted changes are implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work processes

  1. Feedback from involved stakeholders is sought on test or trial and integrated into procedure documentation
  2. Test procedures are documented and recorded according to workplace procedures
  3. Test reports are distributed according to work plan and workplace procedures
Feedback from involved stakeholders is sought on test or trial and integrated into procedure documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test procedures are documented and recorded according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test reports are distributed according to work plan and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section

1. Identify test objectives

1.1 Workplace procedures to test and trial components of plant, tools, equipment, product or systems are identified and verified

1.2 Instructions and work plans are interpreted to identify processes and materials to be used in testing

1.3 Materials and components to be tested are obtained

1.4 Test objectives are identified and confirmed with appropriate personnel

2. Determine test methodology

2.1 Sequence and specified procedures for test are determined according to workplace procedures and manufacturer instructions

2.2 Test tools and equipment are identified and obtained according to job requirements

2.3 Stakeholders are identified and consulted and test is modified to incorporate feedback

3. Identify and allocate resources to test

3.1 Resources and appropriate personnel required to test material or component are identified and allocated

3.2 Test plan is prepared according to workplace procedures, and confirmed with relevant stakeholders

4. Monitor test

4.1 Testing is monitored according to workplace procedures

4.2 Support is provided to personnel conducting the test

4.3 Modifications to test plan are proposed to stakeholders and accepted changes are implemented

5. Complete work processes

5.1 Feedback from involved stakeholders is sought on test or trial and integrated into procedure documentation

5.2 Test procedures are documented and recorded according to workplace procedures

5.3 Test reports are distributed according to work plan and workplace procedures

Required Skills and Knowledge

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section

1. Identify test objectives

1.1 Workplace procedures to test and trial components of plant, tools, equipment, product or systems are identified and verified

1.2 Instructions and work plans are interpreted to identify processes and materials to be used in testing

1.3 Materials and components to be tested are obtained

1.4 Test objectives are identified and confirmed with appropriate personnel

2. Determine test methodology

2.1 Sequence and specified procedures for test are determined according to workplace procedures and manufacturer instructions

2.2 Test tools and equipment are identified and obtained according to job requirements

2.3 Stakeholders are identified and consulted and test is modified to incorporate feedback

3. Identify and allocate resources to test

3.1 Resources and appropriate personnel required to test material or component are identified and allocated

3.2 Test plan is prepared according to workplace procedures, and confirmed with relevant stakeholders

4. Monitor test

4.1 Testing is monitored according to workplace procedures

4.2 Support is provided to personnel conducting the test

4.3 Modifications to test plan are proposed to stakeholders and accepted changes are implemented

5. Complete work processes

5.1 Feedback from involved stakeholders is sought on test or trial and integrated into procedure documentation

5.2 Test procedures are documented and recorded according to workplace procedures

5.3 Test reports are distributed according to work plan and workplace procedures

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Instructions must include:

manufacturer instructions for test components

specifications and drawings

test and trial requirements

procedures for the operation of tools and equipment

test instructions.

Stakeholders must include:

design engineers

resource and budget managers.