NTISthis.com

Evidence Guide: AURBTD003 - Repair and overhaul bicycle steering systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AURBTD003 - Repair and overhaul bicycle steering systems

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to repair and overhaul bicycle steering system

  1. Job requirements are determined from workplace instructions
  2. Manufacturer specifications, workplace procedures and other relevant technical information are accessed and interpreted
  3. Hazards associated with the work are identified and risks are managed
  4. Tools and equipment, including personal protective equipment (PPE), are selected and checked for serviceability
  5. Work is planned to avoid damage to bicycle, minimise waste and use time efficiently
Job requirements are determined from workplace instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Manufacturer specifications, workplace procedures and other relevant technical information are accessed and interpreted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards associated with the work are identified and risks are managed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment, including personal protective equipment (PPE), are selected and checked for serviceability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is planned to avoid damage to bicycle, minimise waste and use time efficiently

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect steering system

  1. Bicycle steering system is checked for faults and worn or damaged components using visual inspection methods and by comparing measurements against manufacturer specifications
  2. Repair and replacement options are identified, documented and costed for customer approval according to workplace procedures
  3. Work area, replacement parts and bicycle are prepared for repair work
Bicycle steering system is checked for faults and worn or damaged components using visual inspection methods and by comparing measurements against manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Repair and replacement options are identified, documented and costed for customer approval according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area, replacement parts and bicycle are prepared for repair work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out repair and overhaul of steering system

  1. Repair and overhaul activities are carried out according to workplace procedures, work plan, and safety and environmental requirements
  2. Required replacement parts are checked and fitted according to manufacturer specifications
  3. Repaired steering system is checked and tested for correct operation according to manufacturer specifications
  4. Repaired steering system is adjusted and aligned as required according to workplace procedures
  5. Results and quality issues are reported to authorised personnel as required
Repair and overhaul activities are carried out according to workplace procedures, work plan, and safety and environmental requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Required replacement parts are checked and fitted according to manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Repaired steering system is checked and tested for correct operation according to manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Repaired steering system is adjusted and aligned as required according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Results and quality issues are reported to authorised personnel as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work processes

  1. Final inspection is made to ensure work meets workplace expectations and bicycle is presented ready for use
  2. Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored
  3. Tools and equipment are checked, reported if faulty, and stored according to workplace procedures
  4. Workplace documentation is processed according to workplace procedures
Final inspection is made to ensure work meets workplace expectations and bicycle is presented ready for use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are checked, reported if faulty, and stored according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace documentation is processed according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare to repair and overhaul bicycle steering system

  1. Job requirements are determined from workplace instructions
  2. Manufacturer specifications, workplace procedures and other relevant technical information are accessed and interpreted
  3. Hazards associated with the work are identified and risks are managed
  4. Tools and equipment, including personal protective equipment (PPE), are selected and checked for serviceability
  5. Work is planned to avoid damage to bicycle, minimise waste and use time efficiently
Job requirements are determined from workplace instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Manufacturer specifications, workplace procedures and other relevant technical information are accessed and interpreted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards associated with the work are identified and risks are managed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment, including personal protective equipment (PPE), are selected and checked for serviceability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is planned to avoid damage to bicycle, minimise waste and use time efficiently

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect steering system

  1. Bicycle steering system is checked for faults and worn or damaged components using visual inspection methods and by comparing measurements against manufacturer specifications
  2. Repair and replacement options are identified, documented and costed for customer approval according to workplace procedures
  3. Work area, replacement parts and bicycle are prepared for repair work
Bicycle steering system is checked for faults and worn or damaged components using visual inspection methods and by comparing measurements against manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Repair and replacement options are identified, documented and costed for customer approval according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area, replacement parts and bicycle are prepared for repair work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out repair and overhaul of steering system

  1. Repair and overhaul activities are carried out according to workplace procedures, work plan, and safety and environmental requirements
  2. Required replacement parts are checked and fitted according to manufacturer specifications
  3. Repaired steering system is checked and tested for correct operation according to manufacturer specifications
  4. Repaired steering system is adjusted and aligned as required according to workplace procedures
  5. Results and quality issues are reported to authorised personnel as required
Repair and overhaul activities are carried out according to workplace procedures, work plan, and safety and environmental requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Required replacement parts are checked and fitted according to manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Repaired steering system is checked and tested for correct operation according to manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Repaired steering system is adjusted and aligned as required according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Results and quality issues are reported to authorised personnel as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work processes

  1. Final inspection is made to ensure work meets workplace expectations and bicycle is presented ready for use
  2. Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored
  3. Tools and equipment are checked, reported if faulty, and stored according to workplace procedures
  4. Workplace documentation is processed according to workplace procedures
Final inspection is made to ensure work meets workplace expectations and bicycle is presented ready for use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are checked, reported if faulty, and stored according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace documentation is processed according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold and italicised text is used, further information is detailed in the range of conditions section.

1. Prepare to repair and overhaul bicycle steering system

1.1 Job requirements are determined from workplace instructions

1.2 Manufacturer specifications, workplace procedures and other relevant technical information are accessed and interpreted

1.3 Hazards associated with the work are identified and risks are managed

1.4 Tools and equipment, including personal protective equipment (PPE), are selected and checked for serviceability

1.5 Work is planned to avoid damage to bicycle, minimise waste and use time efficiently

2. Inspect steering system

2.1 Bicycle steering system is checked for faults and worn or damaged components using visual inspection methods and by comparing measurements against manufacturer specifications

2.2 Repair and replacement options are identified, documented and costed for customer approval according to workplace procedures

2.3 Work area, replacement parts and bicycle are prepared for repair work

3. Carry out repair and overhaul of steering system

3.1 Repair and overhaul activities are carried out according to workplace procedures, work plan, and safety and environmental requirements

3.2 Required replacement parts are checked and fitted according to manufacturer specifications

3.3 Repaired steering system is checked and tested for correct operation according to manufacturer specifications

3.4 Repaired steering system is adjusted and aligned as required according to workplace procedures

3.5 Results and quality issues are reported to authorised personnel as required

4. Complete work processes

4.1 Final inspection is made to ensure work meets workplace expectations and bicycle is presented ready for use

4.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored

4.3 Tools and equipment are checked, reported if faulty, and stored according to workplace procedures

4.4 Workplace documentation is processed according to workplace procedures

Required Skills and Knowledge

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold and italicised text is used, further information is detailed in the range of conditions section.

1. Prepare to repair and overhaul bicycle steering system

1.1 Job requirements are determined from workplace instructions

1.2 Manufacturer specifications, workplace procedures and other relevant technical information are accessed and interpreted

1.3 Hazards associated with the work are identified and risks are managed

1.4 Tools and equipment, including personal protective equipment (PPE), are selected and checked for serviceability

1.5 Work is planned to avoid damage to bicycle, minimise waste and use time efficiently

2. Inspect steering system

2.1 Bicycle steering system is checked for faults and worn or damaged components using visual inspection methods and by comparing measurements against manufacturer specifications

2.2 Repair and replacement options are identified, documented and costed for customer approval according to workplace procedures

2.3 Work area, replacement parts and bicycle are prepared for repair work

3. Carry out repair and overhaul of steering system

3.1 Repair and overhaul activities are carried out according to workplace procedures, work plan, and safety and environmental requirements

3.2 Required replacement parts are checked and fitted according to manufacturer specifications

3.3 Repaired steering system is checked and tested for correct operation according to manufacturer specifications

3.4 Repaired steering system is adjusted and aligned as required according to workplace procedures

3.5 Results and quality issues are reported to authorised personnel as required

4. Complete work processes

4.1 Final inspection is made to ensure work meets workplace expectations and bicycle is presented ready for use

4.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored

4.3 Tools and equipment are checked, reported if faulty, and stored according to workplace procedures

4.4 Workplace documentation is processed according to workplace procedures

Before competency can be determined, individuals must demonstrate they can perform the following according to the standard defined in this unit’s elements, performance criteria, range of conditions and foundation skills:

repair and overhaul three different bicycle steering systems according to manufacturer specifications

repair and overhaul the following components in the course of the above work:

forks

headsets

handlebars and stems.

Individuals must be able to demonstrate knowledge of:

work health and safety (WHS) and occupational health and safety (OHS) requirements relating to repairing and overhauling bicycle steering systems, including procedures for:

manually handling bicycles and their steering systems

identifying workplace hazards

using tools and equipment, including personal protective equipment (PPE)

environmental requirements, including procedures for disposing of waste materials

key bicycle steering system terminology

purpose of bicycle steering systems and their relationship to suspension, wheels, drivetrain, frame and braking systems

operating principles of steering system components, including:

forks

headsets

handlebars and stems

types and use of tools and equipment used to repair and overhaul bicycle steering systems

techniques and processes for repairing and overhauling bicycle steering systems, including:

identification of bicycle steering components, materials and specifications

fault identification

measuring techniques

steering system adjustment techniques

steering system testing procedures.

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Steering system mustinclude:

forks

headsets

handlebars and stems.

Safety and environmental requirements must include:

work health and safety (WHS) and occupational health and safety (OHS) requirements, including procedures for:

manually handling bicycles and their steering systems

identifying workplace hazards

using tools and equipment, including PPE

environmental requirements, including procedures for disposing of waste materials.