Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AURETR009 - Install vehicle lighting and wiring systems

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install, lighting and wiring system

  1. Job requirements are determined according to workplace instructions
  2. Manufacturer specifications and installation fitting instructions are accessed and interpreted
  3. Installation options are analysed and those most appropriate to the circumstances are selected
  4. Hazards associated with the work are identified and risks are managed
  5. Tools and equipment are selected and checked for serviceability
Job requirements are determined according to workplace instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Manufacturer specifications and installation fitting instructions are accessed and interpreted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation options are analysed and those most appropriate to the circumstances are selected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards associated with the work are identified and risks are managed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are selected and checked for serviceability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and test system

  1. Lighting and wiring system and components are checked for correct application and damage
  2. Lighting and wiring system is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or other systems
  3. Installed system and components are tested for correct operation according to workplace procedures and manufacturer specifications
  4. Post-installation testing of other electrical systems is carried out according to workplace procedures to confirm correct operation, and that any problems detected as having been introduced during installation process are rectified
Lighting and wiring system and components are checked for correct application and damage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lighting and wiring system is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or other systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installed system and components are tested for correct operation according to workplace procedures and manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Post-installation testing of other electrical systems is carried out according to workplace procedures to confirm correct operation, and that any problems detected as having been introduced during installation process are rectified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work processes

  1. Final inspection is made to ensure work is to workplace expectations and vehicle, vessel or machinery is presented ready for use
  2. Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
  3. Tools and equipment are checked and stored and any faulty electrical equipment is identified, tagged and isolated according to workplace procedures
  4. Workplace documentation is processed according to workplace procedures
Final inspection is made to ensure work is to workplace expectations and vehicle, vessel or machinery is presented ready for use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are checked and stored and any faulty electrical equipment is identified, tagged and isolated according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace documentation is processed according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare to install, lighting and wiring system

  1. Job requirements are determined according to workplace instructions
  2. Manufacturer specifications and installation fitting instructions are accessed and interpreted
  3. Installation options are analysed and those most appropriate to the circumstances are selected
  4. Hazards associated with the work are identified and risks are managed
  5. Tools and equipment are selected and checked for serviceability
Job requirements are determined according to workplace instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Manufacturer specifications and installation fitting instructions are accessed and interpreted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation options are analysed and those most appropriate to the circumstances are selected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards associated with the work are identified and risks are managed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are selected and checked for serviceability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and test system

  1. Lighting and wiring system and components are checked for correct application and damage
  2. Lighting and wiring system is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or other systems
  3. Installed system and components are tested for correct operation according to workplace procedures and manufacturer specifications
  4. Post-installation testing of other electrical systems is carried out according to workplace procedures to confirm correct operation, and that any problems detected as having been introduced during installation process are rectified
Lighting and wiring system and components are checked for correct application and damage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lighting and wiring system is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or other systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installed system and components are tested for correct operation according to workplace procedures and manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Post-installation testing of other electrical systems is carried out according to workplace procedures to confirm correct operation, and that any problems detected as having been introduced during installation process are rectified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work processes

  1. Final inspection is made to ensure work is to workplace expectations and vehicle, vessel or machinery is presented ready for use
  2. Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
  3. Tools and equipment are checked and stored and any faulty electrical equipment is identified, tagged and isolated according to workplace procedures
  4. Workplace documentation is processed according to workplace procedures
Final inspection is made to ensure work is to workplace expectations and vehicle, vessel or machinery is presented ready for use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are checked and stored and any faulty electrical equipment is identified, tagged and isolated according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace documentation is processed according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold and italicised text is used, further information is detailed in the range of conditions section.

1. Prepare to install, lighting and wiring system

1.1 Job requirements are determined according to workplace instructions

1.2 Manufacturer specifications and installation fitting instructions are accessed and interpreted

1.3 Installation options are analysed and those most appropriate to the circumstances are selected

1.4 Hazards associated with the work are identified and risks are managed

1.5 Tools and equipment are selected and checked for serviceability

2. Install and test system

2.1 Lighting and wiring system and components are checked for correct application and damage

2.2 Lighting and wiring system is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or other systems

2.3 Installed system and components are tested for correct operation according to workplace procedures and manufacturer specifications

2.4 Post-installation testing of other electrical systems is carried out according to workplace procedures to confirm correct operation, and that any problems detected as having been introduced during installation process are rectified

3. Complete work processes

3.1 Final inspection is made to ensure work is to workplace expectations and vehicle, vessel or machinery is presented ready for use

3.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected

3.3 Tools and equipment are checked and stored and any faulty electrical equipment is identified, tagged and isolated according to workplace procedures

3.4 Workplace documentation is processed according to workplace procedures

Required Skills and Knowledge

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold and italicised text is used, further information is detailed in the range of conditions section.

1. Prepare to install, lighting and wiring system

1.1 Job requirements are determined according to workplace instructions

1.2 Manufacturer specifications and installation fitting instructions are accessed and interpreted

1.3 Installation options are analysed and those most appropriate to the circumstances are selected

1.4 Hazards associated with the work are identified and risks are managed

1.5 Tools and equipment are selected and checked for serviceability

2. Install and test system

2.1 Lighting and wiring system and components are checked for correct application and damage

2.2 Lighting and wiring system is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or other systems

2.3 Installed system and components are tested for correct operation according to workplace procedures and manufacturer specifications

2.4 Post-installation testing of other electrical systems is carried out according to workplace procedures to confirm correct operation, and that any problems detected as having been introduced during installation process are rectified

3. Complete work processes

3.1 Final inspection is made to ensure work is to workplace expectations and vehicle, vessel or machinery is presented ready for use

3.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected

3.3 Tools and equipment are checked and stored and any faulty electrical equipment is identified, tagged and isolated according to workplace procedures

3.4 Workplace documentation is processed according to workplace procedures

Before competency can be determined, individuals must demonstrate they can perform the following according to the standard defined in the unit’s elements, performance criteria, range of conditions and foundation skills:

install two of the following low voltage (LV) lighting and wiring systems in non controller area network databus (CAN-bus) systems in two different vehicles, vessels or machinery:

trailer lights and wiring harness

driving lights and wiring harness

side clearance lamp

high-mount rear brake lamp

ascent strip light emitting diode (LED) lamp

filament lamp to LED lamp replacement.

Individuals must be able to demonstrate knowledge of:

work health and safety (WHS) and occupational health and safety (OHS) requirements relating to installing vehicle lighting and wiring systems, including procedures for:

using specialised tools and equipment

selecting and using personal protective equipment (PPE)

identifying hazards and controlling risks associated with wearing jewellery while working around high current wiring systems

LV direct current (DC) lighting and wiring systems of the following:

trailer lights and wiring harnesses

driving lights and wiring harnesses

side clearance lamps

high-mount rear brake lamps

ascent strip LED lamps

procedures for installing LV DC lighting and wiring systems, including:

filament lamp to LED lamp replacement

resistance and voltage drop

circuit performance checks

connecting system and components to existing electrical system without causing damage or problems, including:

selecting and soldering wires

selecting and crimping terminals

removing and replacing connectors

removing and replacing existing electrical components

different cable types and sizes and their current carrying capacity

types of wiring systems found in vehicles, vessels or machinery, including:

basic wiring

twisted pair

shielded wiring

techniques for reading and interpreting technical information, fitting instructions, wiring diagrams and graphic symbols

post-installation testing procedures, including:

confirming that electrical system is operating to manufacturer specifications following installation

confirming that no other problems are present as a result of installing LV DC lighting and wiring systems.

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Safety requirements must include:

work health and safety (WHS) and occupational health and safety (OHS) requirements, including procedures for:

using specialised tools and equipment

selecting and using personal protective equipment (PPE)

identifying hazards and controlling risks associated with wearing jewellery while working around high current wiring systems.