The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to install ancillary electronic system and components
|
|
Job requirements are determined according to workplace instructions Completed |
Evidence:
|
Manufacturer specifications and installation fitting instructions are sourced and interpreted Completed |
Evidence:
|
Installation options are considered and those most appropriate to the circumstances are selected Completed |
Evidence:
|
Hazards associated with the work are identified and risks are managed Completed |
Evidence:
|
Tools, equipment and materials are selected and checked for serviceability Completed |
Evidence:
|
Install and test ancillary electronic system and components
|
|
Electronic system and components are checked for correct application and damage Completed |
Evidence:
|
Electronic equipment is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or systems Completed |
Evidence:
|
Programming code is sought and interpreted, as required, to enable installed equipment to communicate with vehicle or machinery controller area network Completed |
Evidence:
|
Installed system and components are tested for correct operation according to workplace procedures and manufacturer specifications Completed |
Evidence:
|
Post-installation testing of other electrical and electronic systems is carried out according to workplace procedures to confirm correct operation, and any problems detected as having been introduced during the installation process are rectified Completed |
Evidence:
|
Complete work processes
|
|
Final inspection is made to ensure work is to workplace expectations and vehicle or machinery is presented ready for use Completed |
Evidence:
|
Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected Completed |
Evidence:
|
Tools and equipment are checked and stored and any faulty electrical equipment is identified, tagged and isolated according to workplace procedures Completed |
Evidence:
|
Workplace documentation is processed according to workplace procedures Completed |
Evidence:
|
Prepare to install ancillary electronic system and components
|
|
Job requirements are determined according to workplace instructions Completed |
Evidence:
|
Manufacturer specifications and installation fitting instructions are sourced and interpreted Completed |
Evidence:
|
Installation options are considered and those most appropriate to the circumstances are selected Completed |
Evidence:
|
Hazards associated with the work are identified and risks are managed Completed |
Evidence:
|
Tools, equipment and materials are selected and checked for serviceability Completed |
Evidence:
|
Install and test ancillary electronic system and components
|
|
Electronic system and components are checked for correct application and damage Completed |
Evidence:
|
Electronic equipment is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or systems Completed |
Evidence:
|
Programming code is sought and interpreted, as required, to enable installed equipment to communicate with vehicle or machinery controller area network Completed |
Evidence:
|
Installed system and components are tested for correct operation according to workplace procedures and manufacturer specifications Completed |
Evidence:
|
Post-installation testing of other electrical and electronic systems is carried out according to workplace procedures to confirm correct operation, and any problems detected as having been introduced during the installation process are rectified Completed |
Evidence:
|
Complete work processes
|
|
Final inspection is made to ensure work is to workplace expectations and vehicle or machinery is presented ready for use Completed |
Evidence:
|
Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected Completed |
Evidence:
|
Tools and equipment are checked and stored and any faulty electrical equipment is identified, tagged and isolated according to workplace procedures Completed |
Evidence:
|
Workplace documentation is processed according to workplace procedures Completed |
Evidence:
|