The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to install air conditioning system
|
|
Job requirements are determined according to workplace instructions Completed |
Evidence:
|
Installation information is sourced and interpreted Completed |
Evidence:
|
Installation options are considered and those most appropriate to the circumstances are selected Completed |
Evidence:
|
Hazards associated with the work are identified and risks are managed Completed |
Evidence:
|
Tools, equipment and materials are selected and checked for serviceability Completed |
Evidence:
|
Install air conditioning system components
|
|
Air conditioning system components are installed according to workplace procedures and safety and environmental requirements, and without causing damage to components and vehicle or machinery systems Completed |
Evidence:
|
Installation is visually checked prior to pressure testing and system charging Completed |
Evidence:
|
Charge air conditioning system with refrigerant and lubricating oil
|
|
System is pressure tested for leaks prior to being evacuated using approved methods and equipment Completed |
Evidence:
|
System is charged with appropriate refrigerant gas and lubricating oil according to manufacturer specifications, workplace procedures, and relevant industry code of practice Completed |
Evidence:
|
Test air conditioning system
|
|
Post-installation testing is carried out to ensure performance and operation comply with manufacturer specifications Completed |
Evidence:
|
Test results are reported according to workplace procedures Completed |
Evidence:
|
Complete work processes
|
|
Final inspection is made to ensure work is to workplace expectations and vehicle or machinery is presented ready for use Completed |
Evidence:
|
Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected Completed |
Evidence:
|
Tools and equipment are checked and stored and any faulty electrical equipment is identified, tagged and isolated according to workplace procedures Completed |
Evidence:
|
Workplace documentation, including ARCtick service decal sticker, is completed and processed according to workplace procedures Completed |
Evidence:
|
Prepare to install air conditioning system
|
|
Job requirements are determined according to workplace instructions Completed |
Evidence:
|
Installation information is sourced and interpreted Completed |
Evidence:
|
Installation options are considered and those most appropriate to the circumstances are selected Completed |
Evidence:
|
Hazards associated with the work are identified and risks are managed Completed |
Evidence:
|
Tools, equipment and materials are selected and checked for serviceability Completed |
Evidence:
|
Install air conditioning system components
|
|
Air conditioning system components are installed according to workplace procedures and safety and environmental requirements, and without causing damage to components and vehicle or machinery systems Completed |
Evidence:
|
Installation is visually checked prior to pressure testing and system charging Completed |
Evidence:
|
Charge air conditioning system with refrigerant and lubricating oil
|
|
System is pressure tested for leaks prior to being evacuated using approved methods and equipment Completed |
Evidence:
|
System is charged with appropriate refrigerant gas and lubricating oil according to manufacturer specifications, workplace procedures, and relevant industry code of practice Completed |
Evidence:
|
Test air conditioning system
|
|
Post-installation testing is carried out to ensure performance and operation comply with manufacturer specifications Completed |
Evidence:
|
Test results are reported according to workplace procedures Completed |
Evidence:
|
Complete work processes
|
|
Final inspection is made to ensure work is to workplace expectations and vehicle or machinery is presented ready for use Completed |
Evidence:
|
Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected Completed |
Evidence:
|
Tools and equipment are checked and stored and any faulty electrical equipment is identified, tagged and isolated according to workplace procedures Completed |
Evidence:
|
Workplace documentation, including ARCtick service decal sticker, is completed and processed according to workplace procedures Completed |
Evidence:
|