The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to retrofit air conditioning and HVAC system
|
|
Nature and scope of work requirements are identified and confirmed Completed |
Evidence:
|
Workplace health and safety (WHS) requirements are observed throughout the work Completed |
Evidence:
|
Procedures and information are sourced and interpreted Completed |
Evidence:
|
Australian Refrigeration Council (ARC) code of practice is sourced and complied with Completed |
Evidence:
|
Retrofit options are analysed and those most appropriate to the circumstances are selected and prepared Completed |
Evidence:
|
Technical and calibration requirements for retrofit are sourced and support equipment is identified and prepared Completed |
Evidence:
|
Tools and equipment are identified for effective retrofit and modification methods Completed |
Evidence:
|
Critical precautions in relation to working with air conditioning, refrigerant and refrigerant oils are observed Completed |
Evidence:
|
De-gas and re-gas air conditioning and HVAC system
|
|
Correct information is accessed and interpreted from manufacturer and component supplier specifications Completed |
Evidence:
|
System is de-gassed using approved recovery unit and appropriate refrigerant recovery cylinder for individual refrigerant type Completed |
Evidence:
|
Oil recovered is measured for replacement purposes Completed |
Evidence:
|
System is evacuated according to manufacturer and component supplier specifications and industry codes of practice, including state and territory legislation with reference to ozone depleting substances Completed |
Evidence:
|
System is pressure tested for leaks prior to being re-gassed and performance tested using approved methods and equipment Completed |
Evidence:
|
Recovery and charging of air conditioning system are completed without causing damage to components or systems and in line with requirements for ozone depleting substances, industry regulations and guidelines, WHS legislation, and relevant industry codes of practice Completed |
Evidence:
|
Retrofit air conditioning and HVAC system
|
|
Correct information is accessed and interpreted from manufacturer and component supplier specifications Completed |
Evidence:
|
Air conditioning retrofit procedures are determined after performance testing Completed |
Evidence:
|
Retrofit of the system and components is carried out according to manufacturer and component supplier specifications Completed |
Evidence:
|
Modifications are carried out without additional pressures associated with the performance of the system or any loss to system integrity Completed |
Evidence:
|
Retrofit to air conditioning system is completed without causing damage to components or systems and according to industry regulations and guidelines, WHS legislation, and relevant industry codes of practice Completed |
Evidence:
|
Performance test air conditioning and HVAC system
|
|
System is performance tested prior to placing into service and results are documented according to workplace policies and procedures Completed |
Evidence:
|
Service schedule documentation is completed Completed |
Evidence:
|
Final inspection is made to ensure protective guards and safety features are in place Completed |
Evidence:
|
Retest air conditioning and HVAC systems
|
|
Retests are carried out to ensure correct and safe system performance operation Completed |
Evidence:
|
Post-retrofit testing is carried out according to workplace procedures and relevant legislation Completed |
Evidence:
|
Prepare vehicle and equipment for delivery to customer
|
|
Final inspection is made to ensure work is to workplace expectations Completed |
Evidence:
|
Vehicle is cleaned to workplace expectations and presented ready for use Completed |
Evidence:
|
Workplace documentation is processed according to workplace procedures Completed |
Evidence:
|
Appropriate decal sticker is placed in engine compartment Completed |
Evidence:
|
Clean up work area and maintain equipment
|
|
Material that can be reused is collected and stored in the appropriate designated area and Completed |
Evidence:
|
Waste and scrap are removed following workplace procedures and disposed of according to environmental regulations Completed |
Evidence:
|
Equipment and work area are cleaned and inspected for serviceable condition according to workplace procedures Completed |
Evidence:
|
Faulty equipment is identified, tagged and isolated according to workplace procedures and WHS regulations Completed |
Evidence:
|
Operator maintenance is completed according to manufacturer and component supplier specifications, site procedures and ARC code of practice Completed |
Evidence:
|
Tools and equipment are maintained according to workplace procedures Completed |
Evidence:
|