NTISthis.com

Evidence Guide: AURMGA001 - Set up and dismantle temporary work location and equipment at motor sport events

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AURMGA001 - Set up and dismantle temporary work location and equipment at motor sport events

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare site

  1. Site information and requirements are determined and confirmed with site supervisor or circuit manager
  2. Security and confidentiality issues are considered and risk management measures selected
  3. Hazards associated with work site are identified and risks are managed according to workplace procedures and safety requirements
  4. Access paths are considered when positioning equipment and tooling, and measures are taken to eliminate hazards
Site information and requirements are determined and confirmed with site supervisor or circuit manager

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Security and confidentiality issues are considered and risk management measures selected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards associated with work site are identified and risks are managed according to workplace procedures and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Access paths are considered when positioning equipment and tooling, and measures are taken to eliminate hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble temporary work shelter

  1. Tools and equipment are unloaded from transporters according to safety requirements and team requirements and procedures
  2. Work shelter is sourced and fittings information interpreted
  3. Shelter and associated fittings are assembled, erected and secured according to shelter manufacturer procedures, team requirements, event supplementary regulations, and safety requirements
  4. Problems with temporary work shelter are identified and reported to appropriate persons according to team procedures as required
Tools and equipment are unloaded from transporters according to safety requirements and team requirements and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work shelter is sourced and fittings information interpreted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shelter and associated fittings are assembled, erected and secured according to shelter manufacturer procedures, team requirements, event supplementary regulations, and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Problems with temporary work shelter are identified and reported to appropriate persons according to team procedures as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position equipment and tooling in work area

  1. Equipment is assembled and prepared according to manufacturer procedures, team requirements and safety requirements
  2. Equipment is positioned according to team requirements, controlling body rules, category rules and supplementary regulations, and safety requirements
  3. Required personal protective equipment (PPE) is identified, fitted and installed according to manufacturer specifications and team requirements
  4. Problems with work area are identified and reported to appropriate persons according to team procedures as required
  5. Effectiveness of area layout is monitored during use, and recommendations are made for change to appropriate persons as required
Equipment is assembled and prepared according to manufacturer procedures, team requirements and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment is positioned according to team requirements, controlling body rules, category rules and supplementary regulations, and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Required personal protective equipment (PPE) is identified, fitted and installed according to manufacturer specifications and team requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Problems with work area are identified and reported to appropriate persons according to team procedures as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Effectiveness of area layout is monitored during use, and recommendations are made for change to appropriate persons as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dismantle temporary work shelter

  1. Shelter is cleaned, dismantled and packed in preparation for transportation according to team procedures and safety requirements
  2. Tooling and equipment are accounted for, checked and packed in preparation for transportation according to team procedures and safety requirements
  3. Shelter, tools and equipment are loaded on to vehicle transporters according to team procedures and safety requirements
  4. Work area is cleaned and inspected for serviceable condition according to team procedures and local requirements
Shelter is cleaned, dismantled and packed in preparation for transportation according to team procedures and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tooling and equipment are accounted for, checked and packed in preparation for transportation according to team procedures and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shelter, tools and equipment are loaded on to vehicle transporters according to team procedures and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned and inspected for serviceable condition according to team procedures and local requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare site

  1. Site information and requirements are determined and confirmed with site supervisor or circuit manager
  2. Security and confidentiality issues are considered and risk management measures selected
  3. Hazards associated with work site are identified and risks are managed according to workplace procedures and safety requirements
  4. Access paths are considered when positioning equipment and tooling, and measures are taken to eliminate hazards
Site information and requirements are determined and confirmed with site supervisor or circuit manager

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Security and confidentiality issues are considered and risk management measures selected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards associated with work site are identified and risks are managed according to workplace procedures and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Access paths are considered when positioning equipment and tooling, and measures are taken to eliminate hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble temporary work shelter

  1. Tools and equipment are unloaded from transporters according to safety requirements and team requirements and procedures
  2. Work shelter is sourced and fittings information interpreted
  3. Shelter and associated fittings are assembled, erected and secured according to shelter manufacturer procedures, team requirements, event supplementary regulations, and safety requirements
  4. Problems with temporary work shelter are identified and reported to appropriate persons according to team procedures as required
Tools and equipment are unloaded from transporters according to safety requirements and team requirements and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work shelter is sourced and fittings information interpreted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shelter and associated fittings are assembled, erected and secured according to shelter manufacturer procedures, team requirements, event supplementary regulations, and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Problems with temporary work shelter are identified and reported to appropriate persons according to team procedures as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position equipment and tooling in work area

  1. Equipment is assembled and prepared according to manufacturer procedures, team requirements and safety requirements
  2. Equipment is positioned according to team requirements, controlling body rules, category rules and supplementary regulations, and safety requirements
  3. Required personal protective equipment (PPE) is identified, fitted and installed according to manufacturer specifications and team requirements
  4. Problems with work area are identified and reported to appropriate persons according to team procedures as required
  5. Effectiveness of area layout is monitored during use, and recommendations are made for change to appropriate persons as required
Equipment is assembled and prepared according to manufacturer procedures, team requirements and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment is positioned according to team requirements, controlling body rules, category rules and supplementary regulations, and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Required personal protective equipment (PPE) is identified, fitted and installed according to manufacturer specifications and team requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Problems with work area are identified and reported to appropriate persons according to team procedures as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Effectiveness of area layout is monitored during use, and recommendations are made for change to appropriate persons as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dismantle temporary work shelter

  1. Shelter is cleaned, dismantled and packed in preparation for transportation according to team procedures and safety requirements
  2. Tooling and equipment are accounted for, checked and packed in preparation for transportation according to team procedures and safety requirements
  3. Shelter, tools and equipment are loaded on to vehicle transporters according to team procedures and safety requirements
  4. Work area is cleaned and inspected for serviceable condition according to team procedures and local requirements
Shelter is cleaned, dismantled and packed in preparation for transportation according to team procedures and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tooling and equipment are accounted for, checked and packed in preparation for transportation according to team procedures and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shelter, tools and equipment are loaded on to vehicle transporters according to team procedures and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned and inspected for serviceable condition according to team procedures and local requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold and italicised text is used, further information is detailed in the range of conditions section.

1. Prepare site

1.1 Site information and requirements are determined and confirmed with site supervisor or circuit manager

1.2 Security and confidentiality issues are considered and risk management measures selected

1.3 Hazards associated with work site are identified and risks are managed according to workplace procedures and safety requirements

1.4 Access paths are considered when positioning equipment and tooling, and measures are taken to eliminate hazards

2. Assemble temporary work shelter

2.1 Tools and equipment are unloaded from transporters according to safety requirements and team requirements and procedures

2.2 Work shelter is sourced and fittings information interpreted

2.3 Shelter and associated fittings are assembled, erected and secured according to shelter manufacturer procedures, team requirements, event supplementary regulations, and safety requirements

2.4 Problems with temporary work shelter are identified and reported to appropriate persons according to team procedures as required

3. Position equipment and tooling in work area

3.1 Equipment is assembled and prepared according to manufacturer procedures, team requirements and safety requirements

3.2 Equipment is positioned according to team requirements, controlling body rules, category rules and supplementary regulations, and safety requirements

3.3 Required personal protective equipment (PPE) is identified, fitted and installed according to manufacturer specifications and team requirements

3.4 Problems with work area are identified and reported to appropriate persons according to team procedures as required

3.5 Effectiveness of area layout is monitored during use, and recommendations are made for change to appropriate persons as required

4. Dismantle temporary work shelter

4.1 Shelter is cleaned, dismantled and packed in preparation for transportation according to team procedures and safety requirements

4.2 Tooling and equipment are accounted for, checked and packed in preparation for transportation according to team procedures and safety requirements

4.3 Shelter, tools and equipment are loaded on to vehicle transporters according to team procedures and safety requirements

4.4 Work area is cleaned and inspected for serviceable condition according to team procedures and local requirements

Required Skills and Knowledge

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold and italicised text is used, further information is detailed in the range of conditions section.

1. Prepare site

1.1 Site information and requirements are determined and confirmed with site supervisor or circuit manager

1.2 Security and confidentiality issues are considered and risk management measures selected

1.3 Hazards associated with work site are identified and risks are managed according to workplace procedures and safety requirements

1.4 Access paths are considered when positioning equipment and tooling, and measures are taken to eliminate hazards

2. Assemble temporary work shelter

2.1 Tools and equipment are unloaded from transporters according to safety requirements and team requirements and procedures

2.2 Work shelter is sourced and fittings information interpreted

2.3 Shelter and associated fittings are assembled, erected and secured according to shelter manufacturer procedures, team requirements, event supplementary regulations, and safety requirements

2.4 Problems with temporary work shelter are identified and reported to appropriate persons according to team procedures as required

3. Position equipment and tooling in work area

3.1 Equipment is assembled and prepared according to manufacturer procedures, team requirements and safety requirements

3.2 Equipment is positioned according to team requirements, controlling body rules, category rules and supplementary regulations, and safety requirements

3.3 Required personal protective equipment (PPE) is identified, fitted and installed according to manufacturer specifications and team requirements

3.4 Problems with work area are identified and reported to appropriate persons according to team procedures as required

3.5 Effectiveness of area layout is monitored during use, and recommendations are made for change to appropriate persons as required

4. Dismantle temporary work shelter

4.1 Shelter is cleaned, dismantled and packed in preparation for transportation according to team procedures and safety requirements

4.2 Tooling and equipment are accounted for, checked and packed in preparation for transportation according to team procedures and safety requirements

4.3 Shelter, tools and equipment are loaded on to vehicle transporters according to team procedures and safety requirements

4.4 Work area is cleaned and inspected for serviceable condition according to team procedures and local requirements

Before competency can be determined, individuals must demonstrate they can perform the following according to the standards defined in this unit’s elements, performance criteria, range of conditions and foundation skills:

correctly set up and dismantle a temporary work location at three different motor sport event locations, including one sanctioned motor sport event.

Individuals must be able to demonstrate knowledge of:

work health and safety (WHS) and occupational health and safety (OHS) requirements relating to setting up and dismantling a temporary work location and equipment at a motor sport event, including procedures for:

selecting and using personal protective equipment (PPE)

identifying hazards and managing risks

key requirements of motor sport event category rules and supplementary regulations

principles and functionality requirements of the layout of temporary work shelter, including:

workflow of pit lane and service area operations

tooling and equipment required for specific events

methods of monitoring effectiveness of area layout

temporary shelter assembly and erection methods and techniques, including procedures for:

positioning equipment for ease of access, security, logical workflow and ergonomic use

setting up equipment for safe and effective operation, including:

correct boom height

securing gas bottles

securing service area moorings.

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Safety requirements must include:

work health and safety (WHS) and occupational health and safety (OHS) requirements, including procedures for:

selecting and using PPE

identifying hazards and managing risks.