NTISthis.com

Evidence Guide: AURRTQ005 - Install marine jet drive propulsion systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AURRTQ005 - Install marine jet drive propulsion systems

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install jet drive propulsion system

  1. Job requirements are determined from workplace instructions
  2. Installation procedures and information are sourced and interpreted
  3. Installation options are analysed and those most appropriate to the circumstances are selected
  4. Hazards associated with the work are identified and risks are managed
  5. Tools, equipment and materials are selected and checked for serviceability
Job requirements are determined from workplace instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation procedures and information are sourced and interpreted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation options are analysed and those most appropriate to the circumstances are selected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards associated with the work are identified and risks are managed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and materials are selected and checked for serviceability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and commission system

  1. System is checked for correct application and components are checked for damage
  2. System is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or systems
  3. Installed system is tested for correct operation and required adjustments are made according to manufacturer specifications, workplace procedures and safety requirements
  4. System is re-tested in normal operating conditions and final adjustments are made
System is checked for correct application and components are checked for damage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

System is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installed system is tested for correct operation and required adjustments are made according to manufacturer specifications, workplace procedures and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

System is re-tested in normal operating conditions and final adjustments are made

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work processes

  1. Final inspection is made to ensure work is to workplace expectations and vessel is presented ready for use
  2. Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
  3. Tools and equipment are checked and stored according to workplace procedures
  4. Workplace documentation is processed according to workplace procedures
Final inspection is made to ensure work is to workplace expectations and vessel is presented ready for use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are checked and stored according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace documentation is processed according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare to install jet drive propulsion system

  1. Job requirements are determined from workplace instructions
  2. Installation procedures and information are sourced and interpreted
  3. Installation options are analysed and those most appropriate to the circumstances are selected
  4. Hazards associated with the work are identified and risks are managed
  5. Tools, equipment and materials are selected and checked for serviceability
Job requirements are determined from workplace instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation procedures and information are sourced and interpreted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation options are analysed and those most appropriate to the circumstances are selected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards associated with the work are identified and risks are managed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and materials are selected and checked for serviceability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and commission system

  1. System is checked for correct application and components are checked for damage
  2. System is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or systems
  3. Installed system is tested for correct operation and required adjustments are made according to manufacturer specifications, workplace procedures and safety requirements
  4. System is re-tested in normal operating conditions and final adjustments are made
System is checked for correct application and components are checked for damage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

System is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installed system is tested for correct operation and required adjustments are made according to manufacturer specifications, workplace procedures and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

System is re-tested in normal operating conditions and final adjustments are made

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work processes

  1. Final inspection is made to ensure work is to workplace expectations and vessel is presented ready for use
  2. Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
  3. Tools and equipment are checked and stored according to workplace procedures
  4. Workplace documentation is processed according to workplace procedures
Final inspection is made to ensure work is to workplace expectations and vessel is presented ready for use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are checked and stored according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace documentation is processed according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold and italicised text is used, further information is detailed in the range of conditions section.

1. Prepare to install jet drive propulsion system

1.1 Job requirements are determined from workplace instructions

1.2 Installation procedures and information are sourced and interpreted

1.3 Installation options are analysed and those most appropriate to the circumstances are selected

1.4 Hazards associated with the work are identified and risks are managed

1.5 Tools, equipment and materials are selected and checked for serviceability

2. Install and commission system

2.1 System is checked for correct application and components are checked for damage

2.2 System is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or systems

2.3 Installed system is tested for correct operation and required adjustments are made according to manufacturer specifications, workplace procedures and safety requirements

2.4 System is re-tested in normal operating conditions and final adjustments are made

3. Complete work processes

3.1 Final inspection is made to ensure work is to workplace expectations and vessel is presented ready for use

3.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected

3.3 Tools and equipment are checked and stored according to workplace procedures

3.4 Workplace documentation is processed according to workplace procedures

Required Skills and Knowledge

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold and italicised text is used, further information is detailed in the range of conditions section.

1. Prepare to install jet drive propulsion system

1.1 Job requirements are determined from workplace instructions

1.2 Installation procedures and information are sourced and interpreted

1.3 Installation options are analysed and those most appropriate to the circumstances are selected

1.4 Hazards associated with the work are identified and risks are managed

1.5 Tools, equipment and materials are selected and checked for serviceability

2. Install and commission system

2.1 System is checked for correct application and components are checked for damage

2.2 System is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or systems

2.3 Installed system is tested for correct operation and required adjustments are made according to manufacturer specifications, workplace procedures and safety requirements

2.4 System is re-tested in normal operating conditions and final adjustments are made

3. Complete work processes

3.1 Final inspection is made to ensure work is to workplace expectations and vessel is presented ready for use

3.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected

3.3 Tools and equipment are checked and stored according to workplace procedures

3.4 Workplace documentation is processed according to workplace procedures

Before competency can be determined, individuals must demonstrate they can perform the following according to the standards defined in this unit’s elements, performance criteria, range of conditions and foundation skills:

install and test prior to placing in service two different marine jet drive propulsion systems.

Individuals must be able to demonstrate knowledge of:

work health and safety (WHS) and occupational health and safety (OHS) requirements relating to installing jet drive propulsion systems, including lifting and supporting procedures for jet drive propulsion systems

construction and operating principles of jet drive propulsion systems, including:

types of jet pumps, including:

centrifugal

axial flow

methods of reversing thrust, including:

cable-operated buckets

hydraulically-operated buckets

electrically-operated buckets

gearboxes

procedures for installing marine jet drive propulsion systems in vessels

procedures for testing the installation of marine jet drive propulsion systems

commissioning procedures for marine jet drive propulsion systems.

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Safety requirements must include:

work health and safety (WHS) and occupational health and safety (OHS) requirements, including lifting and supporting procedures for jet drive propulsion systems.